Русская версия

Search document title:
Content search 2 (exact):
ENGLISH DOCS FOR THIS DATE- Level 5 Checksheet SHSBC - BPL720108-2RA | Сравнить
- Level 5 Checksheet SHSBC - P720108-2R72 (2) | Сравнить
- Level 5 Checksheet SHSBC - P720108-2R72 | Сравнить

CONTENTS LEVEL V CHECKSHEET
SAINT HILL SPECIAL BRIEFING COURSE
PRE-REQUISITES: PART 1 PART – 2 (1961 – 1962)
SHSBC started 13 May 61
PART – 3 (1963 - 1964) PART – 4 (1965 – 1966)
Cохранить документ себе Скачать
B O A R D P O L I C Y L E T T E R
8 JANUARY 1972RA
ISSUE II
REVISED 18 JANUARY 1975
CANCELS HCO PL 8 JAN 72R II
Same Title
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO POLICY LETTER OF 8 JANUARY 1972R
Revised 17 May 1972
ISSUE II
RemimeoRemimeo
St HillsSt Hills

LEVEL V CHECKSHEET
SAINT HILL SPECIAL BRIEFING COURSE

(Pre-requisites amended and Checksheet divided into 4 parts.)
PREREQUISITES:

LEVEL V CHECKSHEET
SAINT HILL SPECIAL BRIEFING COURSE

  1. Basic Study Manual or a Student Hat
PRE-REQUISITES:
  • HSDC
    • (0) Class IV Grad, M1 *in some versions no such item
  • Class IV
  • (1) Primary Rundown
  • NAME: __________________________ POST: ___________ ORG: ___________

  • (2) HSDC and Internship
  • DATE STARTED: ___________________ DATE COMPLETED: __________________

  • (3) Class IV and Internship (may be omitted for Clears and above per HCO PL 11 Dec 69.)
  • This Checksheet is done once through in the sequence given, and is a 3 ½ - 4 month course full time.

    Note: Grade VA Release is required before termination of this checksheet.

    STUDY TECH: This course has all the BASIC data of auditing on it and is in chronological order. Full application of all Study Tech is to be used throughout the course. It is to be studied in sequence per HCO PL 31 Aug 74 Issue II FAST FLOW TRAINING REINSTATED.

    STUDENTS NAME: ____________________________ DATE STARTED: ______________

    PRODUCT: A Fully Briefed Class V Auditor who has a broad command of the subject of auditing and all its existing technology.

    ORGANIZATION: ______________________________ DATE COMPLETED: ___________

    CERTIFICATE: The graduate of this course is awarded the Certificate of HUBBARD CLASS V AUDITOR – HUBBARD VALIDATED AUDITOR HVA (PROV.)

    This checksheet is done once through starrated in the sequence given, and is a 3½-4 month course full-time.

    R-FACTOR: The Class V Checksheet is a Theory checksheet which the SHSBC Student studies during the first part of the day. The Class VI Checksheet is done during the second part of the day and consists of Practical Drills and Auditing.

    This course has all the BASIC data of auditing on it. All St. Hill Special Briefing Course Bulletin issues and lecture tapes of the 1961 to 1966 era are on the checksheet excluding R6 Data (Goals and Clearing).

    PART – 1

    Your success as an auditor is wholly dependent upon your application, honesty, of study data and the materials taught to you on this course.

    1. HCP PL 7 Feb 65 Keeping Scientology Working __________

    Your auditing ability depends on you not going past any misunderstood word, term, action in the materials of this course. Study this checksheet in order as it is on chronological order showing the development of the technology of auditing. Successful completion of this course entitles the graduate to the Certificate of HUBBARD CLASS V AUDITOR.

    2. HCO PL 17 Jun 70 Technical Degrades __________


    3. HCO PL 26 Oct 71 Technical Downgrades __________

    PART 1

    4. BPL 17 May 71RA Study Points & Conditions (included for reference only) __________

    1. HCO PL 15 Jun 70 KEEPING SCIENTOLOGY WORKING _______________

    5. BOOK: Dianetics:The original Thesis (written 1948) __________

  • HCO PL 17 Jun 70 TECHNICAL DEGRADES _______________
  • 6. CLAY DEMO: The six axioms in Chapter One of Original Thesis __________

  • HCO PL 26 Oct 71 TECH DOWNGRADES _______________
  • 7. BOOK: Dianetics: The Modern Science of Mental Health (May 1950) __________

  • HCOB 30 Jul 73 SCIENTOLOGY CURRENT STATE OF THE SUBJECT AND MATERIALS ______________
  • 8. BOOK: Dianetics: The Evolution of a Science (May 1950) __________

  • HCOB 2 Aug 73 PEP ______________
  • 9. TAPE: 5008C30 Lect. Preventive Dianetics – 1 __________

  • Book: DIANETICS – THE ORIGINAL THESIS (written 1948) _______________
  • 10. TAPE: 5008C30 Lect. Preventive Dianetics – 2 __________

  • Clay: Demonstrate in clay the six axioms mentioned in the first chapter of Original Thesis. _______________
  • 11. TAPE: 5009C23 Lect. General Dianetics Part 1 __________

  • Book: DIANETICS: THE MODERN SCIENCE OF MENTAL HEALTH (May 1950) _______________
  • 12. TAPE: 5009C23 Lect. General Dianetics Part 2 __________

  • Clay: Lock ________; Secondary ________; Engram ________; Dianetics Clear ________; Pain ________; Emotion ________; Analytical Mind ________; Reactive Mind ________; Key in ________; Time track ______ _________
  • 13. BOOK: Science of Survival. (Aug 1951) __________

  • Book: DIANETICS: THE EVOLUTION OF A SCIENCE _______________
  • 14. BOOK: Self Analysis. (Aug 1951) __________

  • Clay: Anaten ________; Dianetics ________; Memory ________; Banks ________; Mind ________; Body ______ _________
  • 15. BOOK: Advanced Procedures and Axioms. (Nov 51) __________

  • Tape 30 Aug 50 PREVENTIVE DIANETICS-1 _______________
  • 16. BOOK: Scientology: Handbook for Preclears. (Dec 1951)__________

  • Tape 30 Aug 50 PREVENTIVE DIANETICS-2 _______________
  • 17. TAPE: 5203C03 HCL-1 Introduction to Scientology, Milestone One __________

  • Tape 23 Sep 50 GENERAL DIANETICS PART 1 _______________
  • 18. TAPE: 5203C03 HCL-2 Introduction to Scientology, Outline of Therapy. __________

  • Tape 23 Sep 50 GENERAL DIANETICS PART 2 _______________
  • 19. BOOK: History of Man. (July 1952) __________

  • Book: SCIENCE OF SURVIVAL (Aug 1951) _______________
  • 20. DEMO:

  • Clay: Theta ________; MEST ________; Enmest ________; Entheta ________; Affinity ________; Reality ________; Communication ________; Somatic ________; Valence ________; Present Time ________; Somatic Mind _______________
  • a. Definition of “A Ded” __________

  • Book: SELF ANALYSIS (Aug 1951) _______________
  • b. Definition of “A Dedex” __________

  • Clay: Straight Wire Recall *in some versions: Straight Wire _____ Recall _____ _______________
  • 21. BOOK: Scientology 8-80. (Nov 1952) __________

  • Book: ADVANCED PROCEDURES AND AXIOMS (Nov 1951) _______________
  • 22. CLAY DEMO:

  • Clay: Thought ________; Emotion ________; Effort ________; Counter Effort ________; Postulate ________; Computation ________; Service Facsimile ________; Responsibility ________; Cause ________; Effect ________; Logic ________; Axiom _______________
  • a. The three manifestations of energy. __________

  • Book: SCIENTOLOGY. HANDBOOK FOR PRECLEARS (Dec 1951) _______________
  • b. A static and a kinetic. __________

  • Clay: Control Center; Counter Emotion; Attitude; Sympathy _______________
  • 23. BOOK: Scientology 8-8008. (Dec 1952) __________

  • Tape 3 Mar 52 HCL-1 INTRODUCTION TO SCIENTOLOGY. MILESTONE ONE. _______________
  • 24. CLAY DEMO: The Factors. __________

  • Tape 3 Mar 52 HCL-2 INTRODUCTION TO SCIENTOLOGY. OUTLINE OF THERAPY _______________
  • 25. TAPE: 5212C01 PDC-1 Scientology How to Understand and Study it __________

  • Book: HISTORY OF MAN (July 1952) _______________
  • 26. PAB No. 1 Certainties __________

  • Book: SCIENTOLOGY 8-80 (Nov 1952 _______________
  • 27. PAB No. 2 SOP 8 __________

  • Clay Scientology ________; Static ________; Facsimile ________; Wave Length ________; Self Determinism ________; Occlusion ________; Flow ________; Dispersal ________; Ridges ________; Thetan ________; Preclear _______________
  • 28. PAB No. 3 Certainty Processing __________

  • Book: SCIENTOLOGY 8-8008 (Dec 1952) _______________
  • 29. PAB No. 4 Beingness __________

  • Clay: Beingness ________; Genetic Entity ________; Doingness ________; Havingness ________; Universes ________; Terminals ________; Cycle of Action _______________
  • 30. PAB No. 5 About PABs __________

  • Tape: 1 Dec 52 PDC-1 SCIENTOLOGY. HOW TO UNDERSTAND AND STUDY IT _______________
  • 31. BOOK: This is Scientology. The Science of Certainty. (April 1953) __________

  • Book: HOW TO LIVE THROUGH AN EXECUTIVE (1953) _______________
  • 32. PAB No. 6 Case Opening __________

  • PAB No. 1 CERTAINTIES _______________
  • 33. PAB No. 7 Six Steps to Better Beingness __________

  • PAB No. 2 SOP 8 _______________
  • 34. PAB No. 8 Viewpoint Processing __________

  • PAB No. 3 CERTAINTY PROCESSING _______________
  • 35. PAB No. 9 Formula H __________

  • PAB No. 4 BEINGNESS _______________
  • 36. PAB No. 10 Change Processing __________

  • PAB No. 5 ABOUT PABs _______________
  • 37. PAB No. 11 What the Thetan is Trying to do __________

  • Book: THIS IS SCIENTOLOGY. THE SCIENCE OF CERTAINTY (Apr 1953) _______________
  • 38. CLAY DEMO: The basic impulse of a thetan. __________

  • Clay: Factor ________; Knowledge ________; Certainty ________; Sensation ________; Loss ________; Awareness ________; Matched Terminals ________; Viewpoint ________; Dimension Point ________; Mock-up _______________
  • 39. PAB No. 12 Explosion __________

  • PAB No. 6 CASE OPENING _______________
  • 40. PAB No. 13 On Human Behaviour __________

  • PAB No. 7 SIX STEPS TO BETTER BEINGNESS _______________
  • 41. PAB No. 14 On Human Character __________

  • PAB No. 8 VIEWPOINT PROCESSING _______________
  • 42. PAB No. 15 Acceptance Level Processing __________

  • PAB No. 9 FORMULA H _______________
  • 43. PAB No. 16 Acceptance Level Processing __________

  • PAB No. 10 CHANGE PROCESSING _______________
  • 44. PAB No. 17 Future Processing __________

  • PAB No. 11 WHAT THE THETAN IS TRYING TO DO _______________
  • 45. PAB No. 18 Overt Acts __________

  • PAB No. 12 EXPLOSION _______________
  • 46. PAB No. 19 The Circuit Case __________

  • PAB No. 13 ON HUMAN BEHAVIOR _______________
  • 47. CLAY DEMO: How to detect a circuit case. __________

  • PAB No. 14 ON HUMAN CHARACTER _______________
  • 48. PAB No. 20 Answers to Correspondents __________

  • Book: HOW TO LIVE THROUGH AN EXECUTIVE (1953) _______________
  • 49. PAB No. 21 Certainty Processing __________

  • PAB No. 15 ACCEPTANCE LEVEL PROCESSING _______________
  • 50. HCOB 14 Jul 56 Bulletin Games __________

  • PAB No. 16 ACCEPTANCE LEVEL PROCESSING _______________
  • 51. HCOB C1954/55 Bulletin Techniques Dianetics __________

  • PAB No. 17 FUTURE PROCESSING _______________
  • 52. PAB No. 22 Certainty Processing __________

  • PAB No. 18 OVERT ACTS _______________
  • 53. PAB No. 23 Havingness __________

  • PAB No. 19 THE CIRCUIT CASE _______________
  • 54. PAB No. 24 Certainty of Exteriorization __________

  • PAB No. 20 ANSWER TO CORRESPONDENTS _______________
  • 55. PAB No. 25 Basic Procedures __________

  • PAB No. 21 CERTAINTY PROCESSING _______________
  • 56. BOOK: The Creation of Human Ability. (April 54) __________

  • PAB No. 22 CERTAINTY PROCESSING _______________
  • 57. HCOB 3 May 54 Viewpoint Straight Wire __________

  • PAB No. 23 HAVINGNESS _______________
  • 58. PAB No. 26 Opening Procedure SOP-8C __________

  • PAB No. 24 CERTAINTY OF EXTERIORIZATION _______________
  • 59. TAPE: 5406C04 6ACC-37 Know to Sex Scale, The Mind and the Tone Scale __________

  • PAB No. 25 BASIC PROCEDURES _______________
  • 60. PAB No. 28 Answer to a Letter __________

  • Book THE CREATION OF HUMAN ABILITY (April 1954) _______________
  • 61. PAB No. 29 Clinical Procedure SOP-8C __________

  • HCOB 3 May 54 VIEWPOINT STRAIGHT WIRE _______________
  • 62. TAPE: 5407C19 7ACC-23 PRO-1 Scientology Its General Background Part 1 __________

  • PAB No. 26 OPENING PROCEDURE SOP – 8C _______________
  • 63. TAPE: 5407C19 7ACC-24 PRO-2 Scientology Its General Background Part 2 __________

  • PAB No. 27 HOW TO START A PRACTICE _______________
  • 64. TAPE: 5407C19 7ACC-25 PRO-3 Scientology Its General Background Part 3 __________

  • Tape: 4.6.54 6 ACC–37 The Mind and The Tone Scale _______________
  • 65. PAB No. 30 Automaticity __________

  • PAB No. 28 Answer to a letter _______________
  • 66. PAB No. 31 Duplication __________

  • PAB No. 29 Clinical Procedure. SOP – 8C _______________
  • 67. CLAY DEMO: What Duplication is. __________

  • Tape: 19.7.54 7 ACC-25 PRO-1 Scientology. It’s General Background. Part 1 _______________
  • 68. BOOK: The Phoenix Lectures. (July 1954) __________

  • Tape: 19.7.54 7 ACC-24 PRO-2 Scientology. It’s General Background. Part 2 _______________
  • 69. PAB No. 32 Why Doctor of Divinity __________

  • Tape: 19.7.54 7 ACC-25 PRO-3 Scientology. It’s General Background. Part 3 _______________
  • 70. PAB No. 33 Theta Clearing __________

  • PAB No. 30 Automaticity _______________
  • 71. PAB No. 34 Opening Procedure SOP-8C __________

  • PAB No. 31 Duplication _______________
  • 72. PAB No. 35 What I learned in Training __________

  • Clay: Duplication _______________
  • 73. PAB No. 36 The Use of Scientology Materials __________

  • Book The Phoenix Lectures _______________
  • 74. PAB No. 37 The Communication Lines of Scientology __________

  • Clay: As-is-ness ________; Alter-is-ness ________; Is-ness ________; Not-is-ness ________; Truth ________; Understanding ________; Consideration ________;
  • 75. TAPE: 5410C20 8ACC-14 The Parts of Man __________

  • PAB No. 32 Why Doctor of Divinity _______________
  • 76. PAB No. 38 The Auditors Code 1954 __________

  • PAB No. 33 Theta Clearing _______________
  • 77. PAB No. 39 The Auditors Code 1954 continued __________

  • PAB No. 34 Opening Procedure SOP – 8C _______________
  • 78. PAB No. 40 The Code of Honor __________

  • PAB No. 35 What I Learned in Training _______________
  • 79. PAB No. 41 The Code of a Scientologist __________

  • PAB No. 36 The Use of Scientology Materials _______________
  • 80. BOOK: Dianetics - 55. (Dec 1954) __________

  • PAB No. 37 The Communication Lines of Scientology _______________
  • 81. DEMO: A cycle of Communication. __________

  • Tape: 20.10.54 8 ACC-14 The Parts of Man _______________
  • 82. DEMO: Two Way Communication. __________

  • PAB No. 38 The Auditors Code 1954 _______________
  • 83. CLAY DEMO: Communication lag and how to handle __________

  • PAB No. 39 The Auditors Code 1954 continues _______________
  • 84. PAB No. 42 Six Basic Processes __________

  • PAB No. 40 The Code of Honor _______________
  • 85. PAB No. 43 Plotting the Preclear on the Tone Scale __________

  • PAB No. 41 The Code of a Scientologist _______________
  • 86. PAB No. 44 Two Way Communication in Action __________

  • Book Dianetics 55 _______________
  • 87. PAB No. 45 Mimicry __________

  • Clay 2 way comm _________; a comm lag _________; pandeterminism __________.
  • 88. PAB No. 46 Straight Wire __________

  • PAB No. 42 Six Basic Processes _______________
  • 89. PAB No. 47 Opening Procedure 8-C __________

  • PAB No. 43 Plotting the Preclear on the Tone Scale _______________
  • 90. CLAY DEMO: The basic theory of Op Pro by 8-C __________

  • PAB No. 44 Two Way Communication in Action _______________
  • 91. PAB No. 48 Opening Procedure by Duplication __________

  • PAB No. 45 Mimicry _______________
  • 92. DEMO: Why Op Pro by Dup should be done on an pc who has reality on his environment __________

  • Book THE CREATION OF HUMAN ABILITY (April 1955) _______________
  • 93. PAB No. 49 The Remedy of Havingness __________

  • Clay: As-is-ness ________; Alter-is-ness ________; Is-ness ________; Not-is-ness ________; Truth ________; Understanding ________; Consideration ________; _______________
  • 94. PAB No. 50 Remedy of Havingness The Process __________

  • PAB No. 46 Straight Wire _______________
  • 95. PAB No. 51 Spotting Spots __________

  • PAB No. 47 Opening Procedure 8 – C _______________
  • 96. PAB No. 52 Auditing the Whole-Track __________

  • PAB No. 48 Opening Procedure by Duplication _______________
  • 97. PAB No. 53 Ownership __________

  • PAB No. 49 The Remedy of Havingness _______________
  • 98. MAGAZINE: Ability Major 4 Ability Straight Wire __________

  • PAB No. 50 Remedy of Havingness. The Process _______________
  • 99. TAPE: 5506C03 History of Research & Investigation (1963) __________

  • PAB No. 51 Spotting Spots _______________
  • 100. TAPE: 5506C03 ASMC-15 What Scientology is Doing __________

  • PAB No. 52 Auditing the Whole – Track _______________
  • 101. PAB No. 54 Reality Level of Preclear __________

  • PAB No. 53 Ownership _______________
  • 102. PAB No. 55 Use of the Tone Scale Plotting Chart __________

  • Magazine Ability Major 4 Ability Straight Wire _______________
  • 103. PAB No. 56 Axiom 51 & Communication Processing __________

  • Tape 3.6.55 History of Research & Investigation _______________
  • 104. CLAY DEMO: Axiom 51. __________

  • Tape 6.6.55 ASMC-15 What Scientology is Doing _______________
  • 105. PAB No. 57 The Six Basics Revised __________

  • PAB No. 54 Reality Level of Preclear _______________
  • 106. PAB No. 58 Problems and Solutions __________

  • PAB No. 55 Use of the Tone Scale Plotting Chart _______________
  • 107. PAB No. 59 Consequences __________

  • PAB No. 56 Axiom 51 & Communication Processing _______________
  • 108. PAB No. 60 Anything – Everything – Nothing __________

  • Clay Axiom 51 _______________
  • 109. PAB No. 61 Selling __________

  • PAB No. 57 The Six Basics Revised _______________
  • 110. PAB No. 62 Psychiatrists __________

  • PAB No. 58 Problems & Solutions _______________
  • 111. TAPE: 5510C03 4LACC-1 Fundamentals of Scientology and the Rudiments of Auditing __________

  • PAB No. 59 Consequences _______________
  • 112. TAPE: 5510C03 4LACC-2 Fundamentals of Scientology and the Rudiments of Auditing __________

  • PAB No. 60 Anything – Everything – Nothing _______________
  • 113. DEMO: The Basic Fundamentals of Auditing __________

  • PAB No. 61 Selling _______________
  • 114. TAPE: 5510C08 LPLS-1 Goals of Dianetics & Scientology __________

  • PAB No. 62 Psychiatrists _______________
  • 115. PAB No. 63 Playing the Game __________

  • Tape 3.10.55 4 LACC-1 Fundamentals of Scientology and Rudiments _______________
  • 116. PAB No. 64 First Postulate __________

  • Tape 3.10.55 4 LACC-2 Fundamentals of Scientology and Rudiments _______________
  • 117. HCOB 8 Nov 55 Six Levels of Processing __________

  • Tape 8.10.55 LPLS-1 Goals of Dianetics and Scientology _______________
  • 118. PAB No. 65 Self Determinism __________

  • PAB No. 63 Playing the Game _______________
  • 119. PAB No. 66 First, Second, Third and Fourth Postulates __________

  • PAB No. 64 First Postulate _______________
  • 120. CLAY DEMO: The evolution of thinkingness. __________

  • HCOB 8 Nov 55 Six Levels of Processing Issue 5 _______________
  • 121. PAB No. 67 Space and Time __________

  • PAB No. 65 Self Determinism _______________
  • 122. PAB No. 68 First and Second Postulate __________

  • PAB No. 66 Identification and Differentiation *var. First, Second, Third and Fourth Postulates _______________
  • 123. HCOB 3 Jan 56 Six Levels of Processing (Issue VII) __________

  • PAB No. 67 Space and Time _______________
  • 124. PAB No. 69 Six Levels of Processing __________

  • PAB No. 68 First and Second Postulate _______________
  • 125. PAB No. 70 Training __________

  • HCOB 3 Jan 56 Six Level of Processing Issue 7 _______________
  • 126. PAB No. 71 Bachelor of Scientology and Hubbard Advanced Auditor Classes __________

  • PAB No. 69 Six Level of Processing _______________
  • 127. PAB No. 72 The Importance of Havingness __________

  • PAB No. 70 Training _______________
  • 128. CLAY DEMO: The symptoms of loss of havingness __________

  • PAB No. 71 Bachelor of Scientology and Hubbard Advanced Auditor Classes _______________
  • 129. PAB No. 73 The Three Methods of Dissemination __________

  • PAB No. 72 The Importance of Havingness _______________
  • 130. PAB No. 74 Washington Bulletin __________

  • PAB No. 73 The Three Methods of Dissemination _______________
  • 131. PAB No. 75 Exteriorization, 2 Way Comm & New Auditing Style __________

  • PAB No. 74 Washington Bulletin _______________
  • 132. PAB No. 76 Comparison of Results __________

  • PAB No. 75 Exteriorization, 2 way comm & Auditing Style _______________
  • 133. PAB No. 77 Reports by Scientologists __________

  • PAB No. 76 Comparison of Results _______________
  • 134. PAB No. 78 The Dublin Operation __________

  • PAB No. 77 Reports by Scientologists _______________
  • 135. PAB No. 79 The Open Channel __________

  • PAB No. 78 Administrations *var. The Dublin Operation _______________
  • 136. PAB No. 80 Scientology's Most Workable Process __________

  • PAB No. 79 The Open Channel _______________
  • 137. PAB No. 81 Purpose __________

  • PAB No. 80 Scientology’s Most Workable Process _______________
  • 138. PAB No. 82 Translator's Edition __________

  • PAB No. 81 Purpose _______________
  • 139. PAB No. 83 The Conditions of Existence __________

  • PAB No. 82 Translator’s Edition _______________
  • 140. DEMO: The 3 Conditions of Existence, giving specific examples of each __________

  • PAB No. 83 The Conditions of Existence _______________
  • 141. PAB No. 84 The Reason Why __________

  • PAB No. 84 The Reason Why _______________
  • 142. PAB No. 85 The Parts of Man __________

  • PAB No. 85 The Parts of Man _______________
  • 143. ESSAY: Write a description of the 3 parts of man and how they influence each other __________

  • PAB No. 86 Causation and Knowledge _______________
  • 144. PAB No. 86 Causation and Knowledge __________

  • HCOB 30 Nov 56 Extracts from HCO Training Bulletin *in some versions: SLP 8 _______________
  • 145. PAB No. 87 Scientology Processing __________

  • PAB No. 87 Scientology Processing _______________
  • 146. PAB No. 88 The Conditions of Auditing __________

  • PAB No. 88 The Conditions of Auditing _______________
  • 147. PAB No. 89 Revision of Translator's Edition __________

  • PAB No. 89 Revision of Translator’s Edition _______________
  • 148. PAB No. 90 The Organizations of Dianetics & Scientology __________

  • PAB No. 90 The Organizations of Dianetics and Scientology _______________
  • 149. HCOB 26 Jun 56 Current Processes __________

  • HCOB 26 Jun 56 Current Processes _______________
  • 150. PAB No. 92 A Critique of Psycho-Analysis __________

  • PAB No. 91 The Anatomy of Failure _______________
  • 151. HCOB 22 Jul 56 Tech Bulletin, Confidential __________

  • PAB No. 92 A Critique of Psycho-Analysis _______________
  • 152. PAB No. 93 A Critique of Psycho-Analysis continued __________

  • HCOB 22 Jul 56 Tech Bulletin Confidential _______________
  • 153. HCOB 3 Aug 56 Organizational Health Chart Reissued 9/9/59, 18/12/69 __________

  • PAB No. 93 A Critique of Psycho-Analysis continued _______________
  • 154. HCOB 13 Aug 56 Scientology Process Chart __________

  • HCOB 3 Aug 56 Mail line (OEC 1:171) _______________
  • 155. PAB No. 94 The Anatomy of Traps __________

  • HCOB 3 Aug 56 Organizational Health Cart. Reissued 9.9.59, 18.12.69 (OEC 7:114) _______________
  • 156. HCOB 20 Aug 56 HGC Procedure __________

  • HCOB 13 Aug 56 Scientology Process Chart _______________
  • 157. HCO Addendum to HCOB 20 Aug 56 “At the bottom of p. 1 add...” __________

  • PAB No. 94 The Anatomy of Traps _______________
  • 158. HCOB 21 Aug 56 Summary of Intensives __________

  • HCOB 20 Aug 56 HGC Procedure _______________
  • 159. HCOB 31 Aug – 3 Sep 56 The Games Congress __________

  • HCOB 21 Aug 56 Summary of Intensives _______________
  • 160. PAB No. 95 Valences __________

  • HCOB 31 Aug to 3 Sept 56 also 3 Jul 56 The Games Congress _______________
  • 161. HCOB 12 Sep 56 Concerning Training __________

  • PAB No. 95 Valences _______________
  • 162. PAB No. 96 Justice __________

  • HCOB 12 Sept 56 Concerning Training _______________
  • 163. HCOB 20 Sep 56 HCO Processing Sheet __________

  • PAB No. 96 Justice _______________
  • 164. CLAY DEMO: Why Processing a pc through use of solids and objects will improve his case __________

  • HCOB 20 Sept 56 HCO Processing Sheet _______________
  • 165. HCOB 26 Sep 56 Procedure for Putting Auditors on Staff __________

  • HCOB 26 Sept 56 Procedure for Putting Auditors on Staff _______________
  • 166. HCOB 26 Sep 56 Flow Line for Personnel __________

  • HCOB 26 Sept 56 Flow Line for Personnel (OEC 4:020) _______________
  • 167. HCOB 26 Sep 56 Registrar __________

  • HCOB 26 Sept 56 Registrar (OEC 4:495) _______________
  • 168. PAB No. 97 Start-Change-Stop __________

  • PAB No. 97 Start – Change – Stop _______________
  • 169. HCOB 4 Oct 56 High School Indoc __________

  • HCOB 4 Oct 56 High School Indoc _______________
  • 170. DEMO: The final goal to be achieved by the student in doing High School Indoc. __________

  • HCOB 4 Oct 56 The Handling of H. C. O. ‘s reissued 30.7.58 (OEC 1:008) _______________
  • 171. HCOB 15 Oct 56 Summary Research Bulletin __________

  • HCOB 15 Oct 56 Summery Research Bulletin *var: Project _______________
  • 172. PAB No. 98 Creative Processes, Motions, Stops & Perceptions __________

  • PAB No. 98 Creative Processes, Motions, Stops and Perceptions _______________
  • 173. HCOB 26 Oct 56 HPA-HCA Training Processes __________

  • HCOB 26 Oct 56 HPA – HCO Training Processes _______________
  • 174. PAB No. 99 Facsimiles and Solids __________

  • PAB No. 99 Facsimiles and Solids _______________
  • 175. HCOB 15 Nov 56 HGC PC Complaints __________

  • HCOB 15 Nov 56 HGC PC Complaints _______________
  • 176. PAB No. 100 The Auditing of Solids __________

  • PAB No. 100 The Auditing of Solids _______________
  • 177. BOOK: The Fundamentals of Thought (Nov 1956) __________

  • Book The Fundamentals of Thought _______________
  • 178. HCOB 30 Nov 56 SLP8 Training Bulletin __________

  • Clay Be __________; Do ___________; Have ___________
  • 179. PAB No. 101 Games __________

  • HCOB 30 Nov 56 SLP 8 Training Bulletin _______________
  • 180. HCOB 3 Dec 56 B. Scn – H.A.A. Techniques __________

  • PAB No. 101 Games _______________
  • 181. PAB No. 102 A Case Report __________

  • HCOB 3 Dec 56 B. Scientology – H.A.A. Techniques _______________
  • 182. BOOK: Control and the Mechanics of S.C.S. __________

  • PAB No. 102 A Case Report _______________
  • 183. CLAY DEMO:

  • Book Control and Mechanics of S.C.S _______________
  • a. The definition of control. __________

  • Clay Start __________; Change __________; Stop _________; Mechanics __________;
  • b. Why “Stop” is the most important part of SCS. __________

  • PAB No. 103 The Code of a Scientologist _______________
  • c. How running SCS increases selfdeterminism. __________

  • Book The Problems of Work _______________
  • 184. PAB No. 103 The Code of a Scientologist __________

  • Clay Confusion __________; Stable Datum __________; Control __________; a Game ___________; How completing a cycle of action ends that cycle ___________;
  • 185. BOOK: The Problems of Work (Jan 1957) __________

  • PAB No. 104 Dissemination (OEC 6:457) _______________
  • 186. PAB No. 104 Dissemination __________

  • PAB No. 105 The Story of a Static _______________
  • 187. PAB No. 105 The Story of a Static __________

  • HCOB 6 Feb 57 HCO Training Bulletin _______________
  • 188. HCOB 6 Feb 57 HCO Training Bulletin __________

  • PAB No. 106 Good Processes _______________
  • 189. PAB No. 108 Good Processes __________

  • Tape 28 Feb. 57 17 ACC–4 The Parts of Man _______________
  • 190. TAPE: 5702C28 17ACC-4 The Parts of Man __________

  • PAB No. 107 Specific for Terror Stomach _______________
  • 191. PAB No. 107 Specific for Terror Stomach __________

  • HCOB 5 Mar 57 Student Reports (OEC 4:145) _______________
  • 192. HCOB 8 Mar 57 Goal of Indoctrination Course __________

  • HCOB 8 Mar 57 Goal of Indoctrination Course _______________
  • 193. PAB No. 108 Learning Rate Part 1 __________

  • PAB No. 108 Learning Rate, Part 1 _______________
  • 194. PAB No. 109 Learning Rate Part 2 __________

  • PAB No. 109 Learning Rate, Part 2 _______________
  • 195. HCOB 8 Apr 57 Group Auditing __________

  • HCOB 8 Apr 57 Group Auditing _______________
  • 196. HCOB 10 Apr 57 The HPA/HCA Full Course must Teach entirely __________

  • HCOB 10 Apr 57 The HPA/HCA Full Course must teach entirely *var: HPA/HCA Course Curriculum _______________
  • 197. PAB No. 110 Education __________

  • PAB No. 110 Education _______________
  • 198. PAB No. 111 Eyesight and Glasses __________

  • PAB No. 111 Eyesight and Glasses _______________
  • 199. HCOB 3 May 57 Training – What it is Today __________

  • HCOB 3 May 57 Training – What it is today _______________
  • 200. PAB No. 112 The Rights of the Field Auditor __________

  • PAB No. 112 The Rights of the Field Auditor _______________
  • 201. HCOB 17 May 57 Definitions __________

  • HCOB 17 May 57 Definitions _______________
  • 202. HCOB 20 May 57 Interim Process __________

  • HCOB 20 May 57 Interim Process _______________
  • 203. PAB No. 113 Procedure CCH __________

  • PAB No. 113 Procedure CCH _______________
  • 204. HCOB 3 Jun 57 Auditing 10 year old child __________

  • HCOB 24 May 57 Stable Data for Instructors _______________
  • 205. HCOB 8 Jun 57 The Teaching of the 18th ACC __________

  • HCOB 3 Jun 57 Explanation of Aberrative Character of Radiation _______________
  • 206. HCOB 11 Jun 57 Training and CCH Processes __________

  • HCOB 3 Jun 57 Auditing 10 year old child _______________
  • 207. DEMO: How "Fishing a Cognition" is used for Tone 40 processes __________

  • HCOB 8 Jun 57 The Teaching of the 18th ACC _______________
  • 208. PAB No. 114 Group Processing __________

  • HCOB 10 Jun 57 What to Tell New HGC Auditors to Process on Preclears _______________
  • 209. HCOB 18 Jun 57 Answer People's Questions __________

  • HCOB 11 Jun 57 Training and CCH Processes _______________
  • 210. HCOB 1 Jul 57 Addition to the Auditor's Code __________

  • PAB No. 114 Group Processing _______________
  • 211. PAB No. 115 The Rehabilitation of Abilities __________

  • HCOB 18 Jun 57 Answer People’s Questions _______________
  • 212. TAPE: 5707C15 18ACC-1 What is Scientology __________

  • HCOB 1 Jul 57 Addition to the auditor’s Code _______________
  • 213. PAB No. 116 Solids and Chronic Somatics __________

  • PAB No. 115 The Rehabilitation of Abilities _______________
  • 214. TAPE: 5707C17 18ACC-3 Theory and Definition of Auditing __________

  • Tape 15 Jul 57 18ACC-1 What is Scientology _______________
  • 215. DEMO:

  • PAB No. 116 Solids and Chronic Somatics _______________
  • a. The definition of Dianetic auditing __________

  • HCOB 15 Jul 57 8-C on Students _______________
  • b. The definition of Scientology auditing __________

  • Tape 17 Jul 57 18ACC-3 Theory and Definition of Auditing _______________
  • 216. HCOB 29 Jul 57 Staff Auditors __________

  • HCOB 17 Jul 57 Changes in Training Drills _______________
  • 217. HCOB 31 Jul 57 Amending 29 July __________

  • HCOB 29 Jul 57 Withholds and Communication _______________
  • 218. PAB No. 117 Confronting Present Time __________

  • HCOB 29 Jul 57 Staff Auditors _______________
  • 219. PAB No. 118 Re Freedom Congress Committee __________

  • HCOB 31 Jul 57 Amending HCOB of 29 July 1957 _______________
  • 220. HCOB 2 Sep 57 "When a verbal direction..." __________

  • PAB No. 117 Confronting Present Time _______________
  • 221. PAB No. 119 The Big Auditing Problem __________

  • PAB No. 118 Re: Freedom Congress Committee _______________
  • 222. HCOB 2 Sep 57 HCA/HPA Course Processes __________

  • HCOB 29 Aug 57 Government Project Stable Data _______________
  • 223. HCOB 9 Sep 57 Processes to be run on HGC Preclears from this date __________

  • HCOB 2 Sep 57 Written Orders _______________
  • 224. PAB No. 120 Control Trio __________

  • PAB No. 119 The Big Auditor Problem *var: The Big Auditing Problem _______________
  • 225. HCOB 24 Sep 57 Curriculum of CCH __________

  • HCOB 2 Sep 57 Verbal Directions from LRH _______________
  • 226. PAB No. 121 Rudiments and Goals __________

  • HCOB 3 Sep 57 HCA/HPA Course Processes _______________
  • 227. PAB No. 122 The Five Levels of Indoctrination and Procedure CCH __________

  • HCOB 4 Sep 1957 Stable Data for Instructors _______________
  • 228. HCOB 29 Oct 57 A Basic Chart of Progress Types __________

  • HCOB 9 Sep 57 Processes to be run on HGC Preclears from this date _______________
  • 229. PAB No. 123 The Reality Scale __________

  • PAB No. 120 Control Trio _______________
  • 230. HCOB 2 Nov 57 Confidential Intensive Processes for use in operation __________

  • HCOB 24 Sep 57 Curriculum of CCH _______________
  • 231. HCOB 13 Nov 57 Project Clear Check Sheet __________

  • PAB No. 121 Rudiments and Goals _______________
  • 232. PAB No. 124 Communication and Is-ness __________

  • PAB No. 122 The Five Levels of Indoctrination and Procedure CCH _______________
  • 233. HCOB 30 Nov 57 Alternate Clear Sheet __________

  • HCOB 29 Oct 57 A Basic Chart of Process Types _______________
  • 234. PAB No. 125 The Parts of Man __________

  • PAB No. 123 The Reality Scale _______________
  • 235. HCOB 3 Dec 57 No. 1 Clear Procedure __________

  • HCOB 2 Nov 57 Confidential. Intensive Process for use in Operation Clear _______________
  • 236. HCOB 4 Dec 57 Clear Procedure continued __________

  • HCOB 13 Nov 57 Project Clear Check Sheet _______________
  • 237. HCOB 7 Dec 57 HGC Procedure __________

  • PAB No. 124 Communication and Is-ness _______________
  • 238. PAB No. 126 Problems: Handling and Running __________

  • HCOB 30 Nov 57 Alternate Clear Sheet _______________
  • 239. HCOB 16 Dec 57 Present Time Problem __________

  • PAB No. 125 The Parts of Man _______________
  • 240. BOOK: Scientology Clear Procedure (Dec 57) __________

  • HCOB 3 Dec 57 No. 1 Clear Procedure _______________
  • 241. PAB No. 127 The Threat to Havingness __________

  • HCOB 4 Dec 57 Clear Procedure Continued _______________
  • 242. BOOK: Axioms and Logics __________

  • HCOB 7 Dec 57 HGC Procedure _______________
  • 243. DEMO:

  • PAB No. 126 Problems: Handling and Running _______________
  • a. The Prelogics __________

  • HCOB 16 Dec 57 Present Time Problem _______________
  • b. The Logics __________

  • HCOB 18 Dec 57 Psychosis, Neurosis and Psychiatrists _______________
  • 244. CLAY DEMO: Scn Axioms 1-10, 19, 20, 25, 26, 28, 30, 38 __________

  • Book Scientology Clear Procedure _______________
  • 245. HCOB 11 Jan 58 HGC Procedure __________

  • PAB No. 127 The Threat to Havingness _______________
  • 246. HCOB 13 Jan 58 HGC Running of pcs __________

  • Book Axioms and Logics _______________
  • 247. PAB No. 128 The Factors behind the Handling of I.Q. __________

  • Clay Scientology Axioms: 1___________; 10___________; 19_________; 20__________; 25__________; 26__________; 28_________; 30__________; 38__________.
  • 248. HCOB 18 Jan 58 The Reason the Auditor is Having Trouble __________

  • HCOB 11 Jan 58 HGC Procedure _______________
  • 249. HCOB 21 Jan 58 Mest Clear Procedure __________

  • HCOB 12 Jan 58 Data on the Effect Scale _______________
  • 250. HCOB 25 Jan 58 Reviewing Week's Profiles __________

  • HCOB 13 Jan 58 HGC Running of PCs _______________
  • 251. HCOB 28 Jan 58 Future Plans __________

  • PAB No. 128 The Factors Behind the Handling of I. Q. _______________
  • 252. PAB No. 129 Confronting __________

  • HCOB 18 Jan 58 Auditor Trouble – Step 1 _______________
  • 253. DEMO: How good 8C raises confront __________

  • HCOB 18 Jan 58 The Reason the Auditor is Having Trouble *in some versions: Control _______________
  • 254. HCOB 1 Feb 58 Clearing the Fields __________

  • HCOB 21 Jan 58 MEST Clear Procedure _______________
  • 255. HCOB 3 Feb 58 HGC Current Procedure __________

  • HCOB 25 Jan 58 Reviewing Week’s Profiles _______________
  • 256. HCOB 6 Feb 58 HGC Clear Procedure Outline __________

  • HCOB 26 Jan 58 Future Plans _______________
  • 257. HCOB 6 Feb 58 HGC Clear Procedure Outline Part II __________

  • PAB No. 129 Confronting _______________
  • 258. HCOB 13 Feb 58 Rules Governing the Running of CCH 0b "Help" __________

  • Demonstrate in clay confront _______________
  • 259. PAB No. 130 Death __________

  • HCOB 1 Feb 58 Clearing of Fields _______________
  • 260. PAB No. 131 The Scale of Withhold __________

  • HCOB 3 Feb 58 HGC Current Procedure _______________
  • 261. HCOB 1 Mar 58 Processing (Comparable Magnitude) __________

  • HCOB 6 Feb 58 HGC Clear Procedure Outline _______________
  • 262. PAB No. 132 Report on Two Cases __________

  • HCOB 6 Feb 58 HGC Clear Procedure Outline Part II _______________
  • 263. HCOB 22 Mar 58 Clearing Reality __________

  • HCOB 13 Feb 58 Rules Governing the Rundown of CCH o-b Help _______________
  • 264. DOLL DRILL: Drill "Hello and Okay" Process __________

  • PAB No. 130 Death _______________
  • 265. PAB No. 133 Procedure CCH __________

  • PAB No. 131 The Scale of Withhold _______________
  • 266. BOOK: Have You Lived Before This Life __________

  • HCOB 1. Mar 58 Processes (Comparable Magnitude) _______________
  • 267. HCOB 2 Apr 58 ARC in Comm Courses __________

  • HCOB 1. Mar 58 Processes (Problems)
  • 268. HCOB 8 Apr 58 Auditing the PC on Clear Procedure __________

  • HCOB 6 Mar 58 Handling Preclear Originations _______________
  • 269. HCOB 11 Apr 58 CCH 88 Enforced Nothingness __________

  • HCOB 7 Mar 58 E-Meters _______________
  • 270. PAB No. 134 Procedure CCH Continued __________

  • HCOB 10 Mar 58 Clear Procedure _______________
  • 271. HCOB 1 May 58 Signs of Success __________

  • PAB No. 132 Report on Two Cases _______________
  • 272. PAB No. 135 Procedure CCH Continued __________

  • HCOB 22 Mar 58 Clearing Reality _______________
  • 273. HCOB 2 May 58 Beingness Again __________

  • HCOB 27 Mar 58 Terminals _______________
  • 274. PAB No. 136 Procedure CCH Continued __________

  • PAB No. 133 Procedure CCH _______________
  • 275. HCOB 22 May 58 "List the enemies of the pc..." __________

  • Book. Have You Lived Before This Life _______________
  • 276. HCOB 24 May 58 A comment on Beingness Processing __________

  • HCOB 2 Apr 58 ARC in Comm Courses _______________
  • 277. HCOB 29 May 58 Clearing by Valences __________

  • HCOB 3 Apr 58 Processes on Groups _______________
  • 278. PAB No. 137 Some more CCH Processes __________

  • HCOB 8 Apr 58 Auditing the PC on Clear Procedure _______________
  • 279. HCOB 4 Jun 58 Running Valences __________

  • HCOB 8 Apr 58 A Pair of Processes _______________
  • 280. HCOB 14 Jun 58 Standardization of Clear Procedure __________

  • HCOB 11 Apr 58 CCH 88. Enforced Nothingness _______________
  • 281. PAB No. 138 Clearing by Valences __________

  • PAB No. 134 Procedure CCH Continued _______________
  • 282. DEMO: What a valence is and why a thetan seeks new ones __________

  • HCOB 1 May 58 Signs of Success _______________
  • 283. HCOB 16 Jun 58 Digest No. 3 __________

  • PAB No. 135 Procedure CCH Continued _______________
  • 284. PAB No. 139 An Example of Clearing by Valences __________

  • HCOB 2 May 58 Beingness Again _______________
  • 285. HCOB 7 Jul 58 Contents and Coverage of HCA/HPA Course __________

  • PAB No. 136 Procedure CCH Continued _______________
  • 286. HCOB 12 Jul 58 Standardization of Clear Processes __________

  • HCOB 22 May 58 Help on Enemies (in some versions: Enemies of the PC)) _______________
  • 287. HCOB 14 Jul 58 20th ACC Training Procedure __________

  • HCOB 24 May 58 A comment on Beingness Processing _______________
  • 288. PAB No. 140 Precision in Auditing __________

  • HCOB 29 May 58 Clearing by Valences _______________
  • 289. HCOB 28 Jul 58 Clear Procedure __________

  • HCOB 29 May 58 An Example of Clearing by Valences _______________
  • 290. HCOB 29 Jul 68 The Rock __________

  • PAB No. 137 Some more CCH Processes _______________
  • 291. PAB No. 141 Beingness Again __________

  • HCOB 4 Jun 58 Running Valences _______________
  • 292. HCOB 5 Aug 58 "The basic locating question of the Rock...." __________

  • HCOB 14 Jun 58 Standardization of Clear Procedure _______________
  • 293. HCOB 10 Aug 58 ACC Auxiliary Procedure __________

  • PAB No. 138 Clearing by Valences _______________
  • 294. PAB No. 142 Auditing the PC on Clear Procedure __________

  • HCOB 16 Jun 58 Digest No. 3 _______________
  • 295. HCOB 20 Aug 58 Out of Sessioness __________

  • PAB No. 139 An Example of Clearing by Valences _______________
  • 296. HCOB 20 Aug 58 Present Time Problem, Running of __________

  • HCOB 7 Jul 58 Contents and Coverage of HCA/HPA Course _______________
  • 297. HCOB 28 Aug 58 Change Auditor's Code __________

  • HCOB 12 Jul 58 Standardization of Clear Processes _______________
  • 298. PAB No. 143 A Pair of Processes __________

  • HCOB 14 Jul 58 20th ACC Training procedure _______________
  • 299. HCOB 12 Sep 58 Past Case Analysis Routine __________

  • PAB No. 140 Precision in Auditing _______________
  • 300. HCOB 12 Sep 58 Havingness – New Commands __________

  • HCOB 25 Jul 58 Clearing Notes _______________
  • 301. PAB No. 144 Psychosis, Neurosis & Psychiatrists __________

  • HCOB 28 Jul 58 Clear Notes *var: Clear Procedure _______________
  • 302. DEMO: The difference between sanity, neurosis and psychosis __________

  • HCOB 29 Jul 58 The Rock _______________
  • 303. PAB No. 145 More on Training Drill Two __________

  • Demonstrate in clay The Rock _______________
  • 304. DEMO: What double acknowledgement is and how to avoid it __________

  • PAB No. 141 Beingness Again _______________
  • 305. PAB No. 146 Procedure CCH __________

  • HCOB 4 Aug 58 Correction of HCOB 25 / 7 / 58 _______________
  • 306. TAPE: 5810C18 LCC-1 Story of Dianetics and Scientology __________

  • HCOB 5 Aug 58 The Rock _______________
  • 307. HCOB 27 Oct 58 How to Read Profiles on OCA __________

  • HCOB 10 Aug 58 ACC Auxiliary Procedure _______________
  • 308. PAB No. 147 Communication Course __________

  • PAB No. 142 Auditing the PC on Clear Procedure _______________
  • 309. HCOB 13 Nov 58 "HCO was asked for a TR number." __________

  • HCOB 20 Aug 58 Out of Sessionness _______________
  • 310. PAB No. 148 Data on Case of Gordon Stanley __________

  • HCOB 20 Aug 58 Present Time Problem Running Of. _______________
  • 311. HCOB 25 Nov 58 "All persons who were run on Step 6..." __________

  • HCOB 28 Aug 58 Change Auditor‘s Code _______________
  • 312. HCOB 25 Nov 58 Techniques to be Used on HGC Preclears __________

  • Demonstrate in clay the difference between pc ”in session” and pc ”out of session” _______________
  • 313. HCOB 1 Dec 58 Permitted to Audit Engrams __________

  • PAB No. 143 A Pair of Processes _______________
  • 314. PAB No. 149 Dummy Auditing __________

  • HCOB 12 Sep 58 Past*var: Post Case Analysis Routine _______________
  • 315. HCOB 6 Dec 58 How to Run an Engram __________

  • HCOB 12 Sep 58 Havingness – New Commands _______________
  • 316. HCOB 7 Dec 58 Training Drill Changes __________

  • HCOB 15 Sep 58 More on Training Drill Two _______________
  • 317. PAB No. 150 Dummy Auditing __________

  • PAB No. 144 Psychosis, Neurosis & Psychiatrists _______________
  • 318. HCOB 17 Dec 58 Auditing ARC Breaks on Reg __________

  • HCOB 29 Sep 58 Vital Training Data _______________
  • 319. HCOB 17 Dec 58 Basic Postulate of Overt Act Motivator Sequence __________

  • PAB No. 145 More on Training Drill Two _______________
  • 320. HCOB 20 Dec 58 Processing a New Mother __________

  • HCOB 6 Oct 58 HGC Procedure _______________
  • 321. HCOB 22 Dec 58 New HGC Process ARC Break Straight Wire __________

  • HCOB 15 Oct 58 ACC Clear Procedure _______________
  • 322. HCOB 27 Dec 58 The First 1st Dynamic Process __________

  • PAB No. 146 Procedure CCH _______________
  • 323. HCOB 28 Dec 58 Short Sessioning __________

  • Tape 5810C18 LCC-1 Story of Dianetics and Scientology _______________
  • 324. HCOB 31 Dec 58 Omit "What Part of That Can" __________

  • HCOB 27 Oct 58 How to Read Profiles on OCA _______________
  • END OF PART ONE
  • PAB No. 147 Communication Course _______________
  • The student routes to Qual to attest to Part One of the Class V Checksheet.

  • HCOB 13 Nov 58 Training Instructors *var: TR 9 (b) and TR 9 (c) _______________
  • I attest that I have completed Part One of this checksheet, that I have used full study tech throughout, that I have no misunderstoods and know and can apply the materials.

  • PAB No. 148 Data on Case of Gordon Stanley _______________
  • STUDENT:___________________________ DATE:____________________

  • HCOB 25 Nov 58 Step (6?, 8?) _______________
  • I attest that the above named student has fully completed Part One of the Class V Checksheet, knows and can apply the materials, and has no misunderstoods.

  • HCOB 25 Nov 58 Techniques to be used on HGC Preclears _______________
  • SUPERVISOR:________________________ DATE:____________________

  • Book Have You Lived Before This Life _______________
  • The student attestation on completion of Part One has been received and logged.

  • HCOB 1 Dec 58 Permitted to Audit Engrams _______________
  • CERTS & AWARDS OFFICER:___________________ DATE:____________________

  • PAB No. 149 Dummy Auditing _______________
  • PART 2 – (1959-1961)

  • HCOB 6 Dec 58 How to run an Engram _______________
  • 1. PAB No. 151 Dummy Auditing __________

  • HCOB 7 Dec 58 Training Drill Change _______________
  • 2. HCOB 10 Jan 59 HGC Allowed Processes __________

  • PAB No. 150 Dummy Auditing _______________
  • 3. HCOB 11 Jan 59 An Amusingly Effective Process __________

  • HCOB 17 Dec 58 Auditing ARC Breaks on Registrar and Assistant Registrar _______________
  • 4. HCOB 12 Jan 59 Tone of Voice – Acknowledgement __________

  • HCOB 17 Dec 58 O/W Sequence _______________
  • 5. PAB No. 152 The Five Levels of Indoctrination __________

  • HCOB 29 Dec 58 Processing a New Mother _______________
  • 6. HCOB 20 Jan 59 ACC Preparatory Process Schedule __________

  • HCOB 22 Dec 58 New HGC Process ARC Break Straight Wire _______________
  • 7. HCOB 22 Jan 59 Not-is Straight Wire __________

  • HCOB 27 Dec 58 The First 1st Dynamic Process _______________
  • 8. HCOB 24 Jan 59 Scientology Axiom 58 __________

  • HCOB 28 Dec 58 Short Sessioning _______________
  • 9. TAPE: 5901C26 21 ACC-1 How a Process Works __________

  • HCOB 31 Dec 58 Confront _______________
  • 10. CLAY DEMO: The cycle of action of running a process on a pc. __________

  • HCOB 31 Dec 58 Omit ”What part of that can” *in some versions: ACC Clear Procedure Change _______________
  • 11. PAB No. 153 CCH __________

  • PAB No. 151 Dummy Auditing _______________
  • 12. HCOB 3 Feb 59 Flattening a Process __________

  • HCOB 6 Jan 59 Field Activities _______________
  • 13. HCOB 3 Feb 59 HGC Current Procedure __________

  • HCOB 10 Jan 59 HGC Allowed Processes _______________
  • 14. HCOB 4 Feb 59 Op Pro by Dup __________

  • HCOB 11 Jan 59 An Amusingly effective Process _______________
  • 15. HCOB 9 Feb 59 Auditor's Code No. 19 __________

  • HCOB 12 Jan 59 Tone of Voice - Acknowledgement _______________
  • 16. PAB No. 154 CCH Concluded __________

  • PAB No. 152 The Five Levels of Indoctrination _______________
  • 17. HCOB 16 Feb 59 HGC Processes __________

  • HCOB 20 Jan 59 ACC Preparatory Process Schedule
  • 18. HCOB 16 Feb 59 "Regarding HCOB of Feb 16, 59..." __________

  • HCOB 22 Jan 59 Not-is Straight Wire _______________
  • 19. HCOB 24 Feb 59 Technical Bulletin __________

  • HCOB 24 Jan 59 Scientology Axiom 58 _______________
  • 20. HCOB 24 Feb 59 Letter Designations on HCOBs __________

  • Tape. 590122 21 ACC-1 How a Process Works _______________
  • 21. HCOB 26 Feb 59 Engram Running on Old Dianetic Cases or Restarted Cases __________

  • Demonstrate in clay the cycle of action of running a process on a pc _______________
  • 22. HCOB 27 Feb 59 How to Select Selected Persons __________

  • PAB No. 153 C.C.H. _______________
  • 23. HCOB 28 Feb 59 ARC Breaks with Auditors __________

  • HCOB 3 Feb 59 Flattening a Process _______________
  • 24. HCOB 28 Feb 59 Clearing Commands __________

  • Demonstrate in clay When a process is flat, including the bank & pc phenomena _______________
  • 25. CLAY DEMO: What happens to pc and bank, when pc runs a wrongly understood command __________

  • HCOB 3 Feb 59 HGC Current Procedure _______________
  • 26. HCOB 28 Feb 59 Analysis of Cases __________

  • HCOB 4 Feb 59 Op Pro by Dup _______________
  • 27. PAB No. 155 Processes Used in 21st ACC __________

  • PAB No. 154 CCH Concluded _______________
  • 28. HCOB 1 Mar 59 Two Rules for Happy Living __________

  • HCOB 16 Feb 59 HGC Processes _______________
  • 29. HCOB 4 Mar 59 HGC Allowed Processes __________

  • HCOB 19 Feb 59 Auditors Code 19 _______________
  • 30. HCOB 6 Mar 59 How to Do a Diagnosis on Dynamic Straightwire __________

  • HCOB 24 Feb 59 Technical Bulletin _______________
  • 31. HCOB 6 Mar 59 Training Drills __________

  • HCOB 24 Feb 59 Letter Designations on HCOBs (OEC 1:234) _______________
  • 32. HCOB 10 Mar 59 Supplemental Data Sheet to HCOB 16/2/59 __________

  • HCOB 26 Feb 59 Identification _______________
  • 33. HCOB 13 Mar 59 "The following is a dispatch..." __________

  • HCOB 26 Feb 59 Engram Running on Old Dianetic Cases or Restarted Cases _______________
  • 34. PAB No. 156 Processes Used in 21st ACC __________

  • HCOB 27 Feb 59 How to Select Selected Persons _______________
  • 35. HCOB 17 Mar 59 An Insanity Questionaire __________

  • HCOB 28 Feb 59 ARC Breaks with Auditors _______________
  • 36. HCOB 17 Mar 59 Do It Yourself Therapy __________

  • HCOB 28 Feb 59 Clearing Commands _______________
  • 37. HCOB 24 Mar 59 HAS Co-Audit __________

  • Demonstrate in clay What happens to pc and bank, when pc runs a wrongly understood command _______________
  • 38. HCOB 25 Mar 59 HAS Co-Audit & Comm Course __________

  • HCOB 28 Feb 59 Analysis of Cases _______________
  • 39. PAB No. 157 Processes Used in 21st ACC __________

  • PAB No. 155 Processes used in 21st ACC _______________
  • 40. HCOB 15 Apr 59 Emotional Tone Scale Expanded __________

  • HCOB 1 Mar 59 Two Rules for Happy Living _______________
  • 41. PAB No. 158 Two Profiles __________

  • HCOB 4 Mar 59 HGC Allowed Processes _______________
  • 42. HCOB 17 Apr 59 Know to Mystery Straight Wire for Extreme Cases __________

  • HCOB 6 Mar 59 How to do a Diagnosis on Dynamic Straightwire _______________
  • 43. CLAY DEMO: Each level of the Know to Mystery Scale __________

  • HCOB 6 Mar 59 Training Drills _______________
  • 44. HCOB 22 Apr 59 Old and New Reality Scale __________

  • HCOB 10 Mar 59 Supplemental Data Sheet to HCOB 16 / 2 / 59
  • 45. CLAY DEMO: The levels of the old and new Reality Scale and how they correspond with each other. __________

  • HCOB 13 Mar 59 Muzzled Auditing _______________
  • 46. HCOB 23 Apr 59 Definitions __________

  • Demonstrate in clay What happens to pc and bank when the auditor puts comments, expressions and enturbulance into session _______________
  • 47. PAB No. 159 A "TR" on ARC Breaks __________

  • PAB No. 156 Processes used in 21st ACC _______________
  • 48. HCOB 3 May 59 Solution to Solutions __________

  • HCOB 17 Mar 59 An Insanity Questionnaire _______________
  • 49. HCOB 7 May 59 An Affinity Process __________

  • HCOB 17 Mar 59 Do it Yourself Therapy _______________
  • 50. HCOB 7 May 59 New Process __________

  • HCOB 24 Mar 59 HAS Co-Audit _______________
  • 51. PAB No. 160 Research Paper __________

  • HCOB 25 Mar 59 HAS Co-Audit & Comm Course _______________
  • NOTE: PABs from 160 up, contain HCOBs already on this checksheet.

  • PAB No. 157 Processes used in 21st ACC _______________
  • 52. HCOB 21 May 59 HGC allowed Processes and ACC Processes __________

  • HCOB 1 Apr 59 Academy Training 1959 _______________
  • 53. HCOB 26 May 59 "The following Article appeared ..." __________

  • HCOB 15 Apr 59 Emotional Tone Scale Expanded _______________
  • 54. BTB 28 May 59 Subject: Terminals __________

  • PAB No. 158 Two Profiles _______________
  • 55. CLAY DEMO: The definition of Terminal __________

  • HCOB 17 Apr 59 Know to Mystery Straight Wire for Extreme Cases _______________
  • 56. HCOB 5 Jun 59 Formula 10 __________

  • Demonstrate in clay Each level of the level of the Know to Mystery Scale _______________
  • 57. HCOB 10 Jun 59 Co-Audit Formula __________

  • HCOB 22 Apr 59 Old and New Reality Scale _______________
  • 58. HCOB 22 Jun 59 How to "Sell Scientology" __________

  • Demonstrate in clay Each level of the Reality Scale _______________
  • 59. HCOB 23 Jun 59 What is Scientology __________

  • HCOB 23 Apr 59 Definitions _______________
  • 60. DEMO: What Scientology is __________

  • PAB No. 159 A ”TR” on ARC Breaks _______________
  • 61. HCOB 3 Jul 59 General Information __________

  • HCOB 3 May 59 Solution to Solutions _______________
  • 62. HCOB 9 Jul 59 Definition of Scientology by LRH __________

  • HCOB 4 May 59 An Affinity Process _______________
  • 63. HCOB 18 Jul 59 Technically Speaking __________

  • HCOB 4 May 59 How To Write A Curriculum _______________
  • 64. HCOB 21 Jul 59 HGC Allowed Processes __________

  • HCOB 7 May 59 New Process _______________
  • 65. HCOB 22 Jul 59 Actual Working Definition of Psychology __________

  • HCOB 8 May 59 An Un-Doable Command _______________
  • 66. HCOB 28 Jul 59 Our Goals __________

  • PAB No. 160 Research Paper - NOTE PABs from 160 up, contain HCOBs already on this checkheet. _______________
  • 67. HCOB 7 Aug 59 The Handling of Communication Processes __________

  • HCOB 21 May 59 HGC Allowed Processes & ACC Processes _______________
  • 68. HCOB 19 Aug 59 HAS Co-Audit, Finding Terminals __________

  • HCOB 26 May 59 Article London City Press _______________
  • 69. HCOB 19 Aug 59 To a Roman Catholic __________

  • HCOB 28 May 59 Terminals _______________
  • 70. HCOB 27 Aug 59 Growth with Competence __________

  • HCOB 5 Jun 59 Formula 10 _______________
  • 71. HCOB 3 Sep 59 Why Victim Works as a Process __________

  • HCOB 10 Jun 59 Co-Audit Formula _______________
  • 72. DEMO: Why a person becomes a victim and how to handle this in processing. __________

  • HCOB 11 Jun 59 Location of Terminals on HAS Co-Audit _______________
  • 73. HCOB 25 Sep 59 HAS Co-Audit __________

  • HCOB 22 Jun 59 How to ”Sell Scientology” _______________
  • 74. HCOB 28 Sep 59 Technical Notes on Child Processing __________

  • HCOB 23 Jun 59 What is Scientology _______________
  • 75. HCOB 29 Sep 59 Universe Processes __________

  • HCOB 29 Jun 59 London HGC Rundown _______________
  • 76. HCOB 5 Oct 59 Universe Processes __________

  • 'HCOB 2 Jul 59 Correction to HCOB 29 / 6 / 59'' _______________
  • 77. HCOB 13 Oct 59 DEI Expanded Scale __________

  • HCOB 3 Jul 59 General Information _______________
  • 78. CLAY DEMO:

  • HCOB 9 Jul 59 Definition of Scientology by LRH _______________
  • A. The inverted DEI Scale and how each lower step justifies failure with the upper level. __________

  • HCOB 18 Jul 59 Technically Speaking _______________
  • B. The Expanded DEI Scale. __________

  • HCOB 18 Jul 59 Letter *in some versions: Income Tax Reform _______________
  • 79. HCOB 13 Oct 59 A Useful Process __________

  • HCOB 21 Jul 59 HGC Allowed Processes _______________
  • 80. HCOB 20 Oct 59 An Experimental Process __________

  • HCOB 22 Jul 59 Actual Working Definition of Psychology _______________
  • 81. DEMO: Why the Know to Mystery Recall Process would handle bad-off cases __________

  • HCOB 22 Jul 59 Amendment to Code of a Scientologist _______________
  • 82. HCOB 30 Oct 59 To Retain Co-Audit Pcs Interest in Case __________

  • HCOB 23 Jul 59 Field Activities _______________
  • 83. HCOB 31 Oct 59 Create Processes Dangers and Advantages __________

  • HCOB 27 Jul 59 HGC Processes - HASI _______________
  • 84. BTB 5 Nov 59R Scientology Games for Children __________

  • HCOB 28(?) Jul 59 Our Goals _______________
  • 85. HCOB 12 Nov 59 Acknowledgements in Auditing __________

  • HCOB 2 Aug 59 Communication Processes _______________
  • 86. HCOB 18 Nov 59 First Melbourne ACC Material __________

  • HCOB 5 Aug 59 Processing Gains by Mentally Retarded Child _______________
  • 87. BTB 26 Nov 59 The Interpretation of the APA & OCA __________

  • HCOB 5 Aug 59 HGC Processes _______________
  • 88. TAPE: 5911C26 1 MACC-27 The Constancy of Fundamentals of Dianetics & Scientology __________

  • HCOB 7 Aug 59 The Handling of Communication Processes _______________
  • 89. BTB 3 Dec 59R Use of APA & OCA in Determining Processes to Run __________

  • HCOB 19 Aug 59 HAS Co-Audit. Finding Terminals _______________
  • 90. HCOB 4 Dec 59 Allowed Processes 1st Melbourne ACC __________

  • HCOB 19 Aug 59 To a Roman Catholic _______________
  • 91. HCOB 15 Dec 59 Urgent Changes in All Co-Audit Courses __________

  • HCOB 27 Aug 59 Growth with Competence _______________
  • 92. HCOB 16 Dec 59 Important, Responsibility for O/W __________

  • HCOB 3 Sep 59 Why Victim Works as a Process _______________
  • 93. HCOB 23 Dec 59 Responsibility __________

  • Demonstrate in clay Why a Victim is acting as a Victim _______________
  • 94. CLAY DEMO: The cause of irresponsibility and how this is handled. __________

  • HCOB 7 Sep 59 Processing a New Mother _______________
  • 95. HCOB 31 Dec 59 Blow-Offs __________

  • HCOB 7 Sep 59 When is a Process Flat _______________
  • 96. CLAY DEMO: Why a person blows. __________

  • HCOB 8 Sep 59 Articles by Mario Kohly _______________
  • 97. HCOB 7 Jan 60 The Unmoving Case __________

  • HCOB 8 Sep 59 The Science of Ability _______________
  • 98. HCOB 8 Jan 60 OT Provedures for HCS/BScn Courses __________

  • HCOB 9 Sep 59 Some Observations on S22*var:622 _______________
  • 99. HCOB 14 Jan 60 The Black Case __________

  • HCOB 9 Sep 59 Late LRH Biography Data _______________
  • 100. HCOB 21 Jan 60 Justification __________

  • HCOB 12 Sep 59 Processing a New Mother _______________
  • 101. DEMO: The Mechanism of Justification __________

  • HCOB 21 Sep 59 Two Paper Tricks (Cancelled by HCOB 28 Jun 72) _______________
  • 102. HCOB 21 Jan 60 Responsibility __________

  • HCOB 21 Sep 59 Present Time Problem Processes _______________
  • 103. HCOB 24 Jan 60 OT Procedure __________

  • HCOB 21 Sep 59 Results in Auditing with S2 _______________
  • 104. HCOB 25 Jan 60 OT-3 Procedure HGC Allowed Processes __________

  • HCOB 23 Sep 59 How to Write an Auditors Report _______________
  • 105. HCOB 28 Jan 60 The Key to All Cases – Responsibility __________

  • HCOB 25 Sep 59 Present Time Problem Processes _______________
  • 106. DEMO: The anatomy of Responsibility __________

  • HCOB 25 Sep 59 HAS Co-Audit _______________
  • 107. HCOB 2 Feb 60 The Co-Audit Team __________

  • HCOB 26 Sep 59 Data on Clearing a Staff Member _______________
  • 108. HCOB 3 Feb 60 Security Check __________

  • HCOB 28 Sep 59 Technical Notes on Child Processing _______________
  • 109. HCOB 4 Feb 60 Theory of Responsibility Processing __________

  • HCOB 29 Sep 59 Universe Processes _______________
  • 110. HCOB 4 Feb 60 Overt Manifestations on a Low Toned Case __________

  • HCOB 5 Oct 59 Universe Processes _______________
  • 111. BTB 6 Feb 60 Effect Scale __________

  • HCOB 5 Oct 59 Game Condition and Auditing _______________
  • 112. CLAY DEMO: An Example of each level of the Effect Scale __________

  • HCOB 5 Oct 59 Addition to HCOB 7 / 9 / 59 _______________
  • 113. HCOB 8 Feb 60 Honest People Have Rights Too __________

  • HCOB 13 Oct 59 DEI Expanded Scale _______________
  • 114. HCOB 10 Feb 60 British E-Meter Operation __________

  • Demonstrate in clay Each level of the Expanded DEI Scale _______________
  • 115. HCOB 11 Feb 60 Create and Confront __________

  • HCOB 13 Oct 59 A Useful Process _______________
  • 116. HCOB 18 Feb 60 How to Run O/W and Responsibility __________

  • HCOB 16 Oct 59 Forbidden Terminals with Communication Process _______________
  • 117. HCOB 25 Feb 60 Scientology Can Have a Group Win __________

  • HCOB 20 Oct 59 An Experimental Process _______________
  • 118. HCOB 25 Feb 60 The Model Session __________

  • HCOB 26 Oct 59 List of Synonyms for ”Create” for use in New Creation Processes _______________
  • 119. HCOB 3 Mar 60 OT3 – A Procedure HGC Allowed Procedure __________

  • HCOB 26 Oct 59 Source Terminals Assessment _______________
  • 120. HCOB 9 Mar 60 Expansion of OT 3A Procedure __________

  • HCOB 29 Oct 59 Communication Process Includes Havingness _______________
  • 121. HCOB 17 Mar 60 Standardized Sessions __________

  • HCOB 30 Oct 59 To retain Co-Audit PCs Interest in Case _______________
  • 122. HCOB 24 Mar 60 Goals in Rudiments __________

  • HCOB 31 Oct 59 Create Processes. Dangers and Advantages _______________
  • 123. HCOB 30 Mar 60 Interrogation __________

  • HCOB 5 Nov 59 Rudiments of Formal Auditing _______________
  • 124. HCOB 31 Mar 60 The Present Time Problem __________

  • HCOB 5 Nov 59 Scientology Games for Children _______________
  • 125. CLAY DEMO:

  • HCOB 12 Nov 59 Acknowledgements in Auditing _______________
  • A. A PTP __________

  • HCOB 18 Nov 59 First Melbourne ACC Material _______________
  • B. Why a case makes no change if a PTP is not handled __________

  • HCOB 19 Nov 59 The Handling of ARC Breaks in Auditing _______________
  • 126. BTB 31 Mar 60 Electrode Improvement Tip __________

  • HCOB 26 Nov 59 The Interpretation of the APA and OCA _______________
  • 127. HCOB 7 Apr 60 A New Summary of Auditing __________

  • Tape 5911C26 1XACC*MACC-27. The constancy of Fundamentals of Dianetics and Scientology _______________
  • 128. HCOB 21 Apr 60 Pre-Session Processes __________

  • HCOB 3 Dec 59 Use of APA and OCA in Determining Processes to be run _______________
  • 129. HCOB 28 Apr 60 Books are Dissemination __________

  • HCOB 4 Dec 59*in some versions: 30 Nov 59 Allowed Processes 1st Melbourne ACC _______________
  • 130. HCOB 29 Apr 60 The Scientific Treatment of the Insane __________

  • HCOB 11 Dec 59 New Horizons in Scientology _______________
  • 131. HCOB 5 May 60 Help __________

  • HCOB 15 Dec 59 HAS Co-Audit _______________
  • 132. HCOB 10 May 60 Our Technical Programme __________

  • HCOB 15 Dec 59 Urgent Changes in All Co-Audit Courses _______________
  • 133. HCOB 12 May 60 Help Procesing __________

  • HCOB 16 Dec 59 Important, Responsibility for O/W _______________
  • 134. HCOB 19 May 60 How Help Becomes Betrayal __________

  • HCOB 18 Dec 59 HAS Co-Audit _______________
  • 135. CLAY DEMO:

  • HCOB 23 Dec 59 Responsibility _______________
  • A. Help __________

  • HCOB 31 Dec 59 Blow-Offs _______________
  • B. How help can turn into betrayal __________

  • Demonstrate in clay the reason for a Blow Off _______________
  • 136. HCOB 22 May 60 DeCertification – How You Should Support it __________

  • HCOB 3 Jan 60 A Third Dynamic for Scientology _______________
  • 137. HCOB 26 May 60 Security Checks __________

  • HCOB 7 Jan 60 The Unmoving Case _______________
  • 138. HCOB 27 May 60 Dear Scientologist __________

  • HCOB 8 Jan 60 Procedures for HQS/Bscn Courses _______________
  • 139. HCOB 28 May 60 By Their Actions __________

  • HCOB 14 Jan 60 The Black Case _______________
  • 140. BTB 30 May 60 Dynamic Assessment on Help __________

  • HCOB 21 Jan 60 Justification _______________
  • 141. HCOB 9 Jun 60 The Basic Assumption of Scientology versus Overts __________

  • Demonstrate in clay Justifications _______________
  • 142. HCOB 10 Jun 60 What We Expect of a Scientologist __________

  • HCOB 21 Jan 60 Responsibility _______________
  • 143. HCOB 10 Jun 60 HGC Preclear Assessment __________

  • Demonstrate in clay Responsibility _______________
  • 144. HCOB 16 Jun 60 Hints on Running Cases with Help __________

  • HCOB 24 Jan 60 OT Procedure _______________
  • 145. HCOB 23 Jun 60 Special Zone Plan __________

  • HCOB 25 Jan 60 OT-3 Procedure, HGC Allowed Processes _______________
  • 146. HCOB 30 Jun 60 Create Again __________

  • HCOB 28 Jan 60 The Key to all Cases - Responsibility _______________
  • 147. HCOB 6 Jul 60 Making Clears and Picking Up HGC Quality __________

  • HCOB 2 Feb 60 The Co-Audit Team _______________
  • 148. HCOB 7 Jul 60 The Assessment of Help __________

  • HCOB 3 Feb 60 Security Check _______________
  • 149. HCOB 14 Jul 60 Current Rundown Concept Help __________

  • HCOB 4 Feb 60 Theory of Responsibility Processing _______________
  • 150. HCOB 21 Jul 60 Some Help Terminals __________

  • HCOB 4 Feb 60 Overt Manifestations on a Low Toned Case _______________
  • 151. HCOB 27 Jul 60 Double Action Cycles __________

  • HCOB 5 Feb 60 Processing the Machine Case _______________
  • 152. HCOB 4 Aug 60 Regimen One __________

  • HCOB 6 Feb 60 Effect Scale _______________
  • 153. HCOB 11 Aug 60 The Laws of Assessment __________

  • BTB 6 Feb 60R Effect Scale _______________
  • 154. DEMO: The 3 laws of assessment __________

  • Demonstrate in clay each level of the Effect Scale _______________
  • 155. HCOB 18 Aug 60 Vital Information __________

  • HCOB 8 Feb 60 Honest People Have Rights Too _______________
  • 156. HCOB 25 Aug 60 Powerful Presession Additions __________

  • HCOB 10 Feb 60 Definition: The State of Release _______________
  • 157. HCOB 25 Aug 60 New Definition of Psychosis __________

  • HCOB 10 Feb 60 British E-Meter Operation _______________
  • 158. HCOB 26 Aug 60 Regimen Two __________

  • HCOB 11 Feb 60 Create and Confront _______________
  • 159. BTB 26 Aug 60 OCA Reliability Test __________

  • HCOB 15 Feb 60 Some Points to Remember _______________
  • 160. HCOB 1 Sep 60 Presession Two __________

  • HCOB 18 Feb 60 How to Run O/W and Responsibility _______________
  • 161. HCOB 8 Sep 60 The PreSessions of the 1st Saint Hill ACC __________

  • HCOB 25 Feb 60 Scientology can Have a Group Win _______________
  • 162. HCOB 15 Sep 60 The Tone Arm __________

  • HCOB 25 Feb 60 The Model Session _______________
  • 163. HCOB 19 Sep 60 ACC Lecture Tapes __________

  • HCOB 27 Feb 60 The Four Universes _______________
  • 164. HCOB 19 Sep 60 Captive Brains __________

  • HCOB 2 Mar 60 A Touch Assist _______________
  • 165. HCOB 22 Sep 60 Announcing New Technology __________

  • HCOB 3 Mar 60 OT3-A Procedure. HGC Allowed Procedure _______________
  • 166. HCOB 23 Sep 60 Order of Test of Havingness and Confront Commands __________

  • HCOB 4 Mar 60 A Marriage Co-Audit _______________
  • 167. HCOB 28 Sep 60 Tips on How to Crack an HGC Case __________

  • HCOB 7 Mar 60 Why Pin Time _______________
  • 168. HCOB 29 Sep 60 Havingness and Duplication __________

  • HCOB 9 Mar 60 Operation of British E-Meter _______________
  • 169. CLAY DEMO: The Purpose of Objective Havingness __________

  • HCOB 9 Mar 60 Expansion of OT 3A Procedure, Step 2 _______________
  • 170. HCOB 6 Oct 60 Thirty Six New PreSessions __________

  • HCOB 10 Mar 60 Some Points to Remember Addition _______________
  • 171. HCOB 10 Oct 60 Current News __________

  • HCOB 17 Mar 60 An Auditing Win _______________
  • 172. HCOB 13 Oct 60 Script of a Model Session __________

  • HCOB 17 Mar 60 Standardized Session _______________
  • 173. HCOB 18 Oct 60 Terminal Stable Data __________

  • HCOB 18 Mar 60 Some Points to Remember _______________
  • 174. HCOB 20 Oct 60 Theory 67 __________

  • HCOB 18 Mar 60 Creating Things _______________
  • 175. HCOB 27 Oct 60 Revised Case Entrance __________

  • HCOB 24 Mar 60 Goals in Rudiments _______________
  • 176. HCOB 3 Nov 60 Failed Help __________

  • HCOB 30 Mar 60 Interrogation _______________
  • 177. HCOB 10.Nov 60 Formula 13 __________

  • HCOB 31 Mar 60 The Present Time Problem _______________
  • 178. HCOB 11 Nov 60 Change on Model Session __________

  • HCOB 31 Mar 60 Electrode Improvement Tip _______________
  • 179. HCOB 17 Nov 60 Starting Cases __________

  • HCOB 1 Apr 60 Some Points of Theory _______________
  • 180. CLAY DEMO: “In Session” __________

  • HCOB 1 Apr 60 Route to Success in Scientology _______________
  • 181. HCOB 20 Nov 60 HAS Co-Audit Ended __________

  • HCOB 7 Apr 60 A New Summary of Auditing _______________
  • 182. HCOB 24 Nov 60 The Unmoving Case __________

  • HCOB 11 Apr 60(/61) ACC Tr *in some versions: New Training Schedule _______________
  • 183. HCOB 1 Dec 60 New Formulas __________

  • HCOB 18 Apr 60(/61) S.O.P Goals _______________
  • 184. HCOB 8 Dec 60 Clearing Routine __________

  • HCOB 7 Apr 60 II Checksheet for HGC _______________
  • 185. HCOB 15 Dec 60 PreSession 37 __________

  • HCOB 20 Apr 60 Processes _______________
  • 186. HCOB 22 Dec 60 HAS Co-Audit Resumed __________

  • HCOB 21 Apr 60 Pre-Session Processes _______________
  • 187. HCOB 29 Dec 60 The New PE and the New HAS Co-Audit __________

  • HCOB 22 Apr 60 Flattening Terminals _______________
  • 188. TAPE: 6012C31 AHMC-1 The Genus of Dianetics andScientology __________

  • HCOB 28 Apr 60 Books are Dissemination _______________
  • 189. TAPE: 6012C31 AHMC-2 The Things of Scientology __________

  • HCOB 29 Apr 60 The Scientific Treatment of the Insane _______________
  • 190. HCOB 5 Jan 61 O/W A Limited Theory __________

  • HCOB 30 Apr 60 ACC TRs _______________
  • 191. DEMO: The O/W cycle between beings (give a specific Example). __________

  • HCOB 3 May 60 Calling All Auditors _______________
  • 192. HCOB 12 Jan 61 New Help Data __________

  • HCOB 5 May 60 Help _______________
  • 193. HCOB 19 Jan 61 Additional HAS Processes __________

  • HCOB 6 May 60 Fifth Dynamic Research _______________
  • 194. HCOB 25 Jan 61 Handling of Rudiments __________

  • HCOB 7 May 60 Earmarks of a Hot Terminal _______________
  • 195. HCOB 26 Jan 61 The Ultimate Processes __________

  • HCOB 10 May 60 Our Technical Programme _______________
  • 196. BOOK: E-Meter Essentials __________

  • HCOB 10 May 60 Calling All Auditors _______________
  • 197. HCOB 2 Feb 61 UK Cases Different __________

  • HCOB 10 May 60 Scales _______________
  • 198. HCOB 9 Feb 61 New PreSession Data and Script Change __________

  • Demonstrate in clay the Identification and Havingness Scales _______________
  • 199. TAPE: 6102C14 3 SAACC-14 Havingness & Assessment on the Pre-Havingness Scale __________

  • HCOB 11 May 60 Calling All Auditors _______________
  • 200. HCOB 16 Feb 61 Formula 19 __________

  • HCOB 12 May 60 Help Processing _______________
  • 201. HCOB 23 Feb 61 PT Problem and Goals __________

  • HCOB 19 May 60 How Help Became Betrayal _______________
  • 202. HCOB 2 Mar 61 New Pre-Have Command __________

  • HCOB 22 May 60 DeCertification – How You Should Support It _______________
  • 203. HCOB 2 Mar 61 Formula 20 __________

  • HCOB 26 May 60 Calling All Auditors About Help _______________
  • 204. HCOB 9 Mar 61 New Assessment Scale __________

  • Demonstrate in clay Help _______________
  • 205. HCOB 9 Mar 61 Command Sheet Pre-Havingness Scale __________

  • HCOB 26 May 60 Security Checks _______________
  • 206. HCOB 21 Mar 61 Script of a Model Session __________

  • HCOB 27 May 60 II Dear Scientologist _______________
  • 207. HCOB 12 Apr 61 Training Drills __________

  • HCOB 28 May 60 By Their Actions _______________
  • 208. HCOB 17 Apr 61 Training Drills Modernized __________

  • HCOB 30 May 60 Dynamic Assessment on Help _______________
  • 209. HCOB 23 Apr 61 Change Processes __________

  • HCOB 2 Jun 60 Dynamic Assessment on Help _______________
  • 210. HCOB 27 Apr 61 Change Processes __________

  • HCOB 9 Jun 60 The Basic Assumptions of Scientology versus Overts _______________
  • 211. HCOB 30 Apr 61R Change Brackets and Commands __________

  • HCOB 10 Jun 60 What we expect of a Scientologist _______________
  • 212. DEMO:

  • HCOB 10 Jun 60 HGC Preclear Assessment _______________
  • A. Why resisted change is the basis of stuck points on the track. __________

  • HCOB 16 Jun 60 Hints on Running Cases with Help _______________
  • B. How change processes handle this __________

  • HCOB 16 Jun 60 Calling All Auditors About Help _______________
  • 213. HCOB 4 May 61 Process Levels Necessity for Training __________

  • HCOB 21 Jun 60 Religious Philosophy and Religious Practice _______________
  • 214. TAPE: 6105C07 SHSpec-1 E-Meter Talk and Demo __________

  • HCOB 23 Jun 60 Special Zone Plan _______________
  • 215. HCOB 11 May 61 E-Meter Horror __________

  • HCOB 23 Jun 60 Fifth Dynamic Research
  • 216. TAPE: 6105C12 SHSpec-2 Assessment __________

  • HCOB 30 Jun 60 Create Again _______________
  • 217. HCOB 19 May 61 Urgent Assessment Data __________

  • HCOB 5 Jul 60 Calling All Auditors About Help _______________
  • 218. TAPE: 6105C19 SHSpec-3 E-Meter __________

  • HCOB 6 Jul 60 Calling All Auditors About Help _______________
  • 219. HCOB 23 May 61 Pre-Have Scale Revised __________

  • HCOB 6 Jul 60 Making Clears and Picking up HGC Quality _______________
  • 220. CLAY DEMO: What Assessment is. __________

  • Demonstrate in clay an Auditor _______________
  • 221. TAPE: 6105C26 SHSpec-4 On Auditing __________

  • HCOB 7 Jul 60 The Assessment of Help _______________
  • 222. HCOB 29 May 61 Clarification of Change Processing __________

  • HCOB 14 Jul 60 Current Rundown. Concept Help _______________
  • 223. HCOB 1 Jun 61 Assessing __________

  • HCOB 15 Jul 60 Assessment Questionaire _______________
  • 224. TAPE: 6106C01 SHSpec-5 Flattening Process and E-Meter __________

  • HCOB 21 Jul 60 Some Help Terminals _______________
  • 225. TAPE: 6106C02 SHSpec-6 Flows, Pre-Have Scale, Primary Scale __________

  • HCOB 27 Jul 60 Double Action Cycles _______________
  • 226. HCOB 5 Jun 61 Processes Allowed __________

  • HCOB 3 Aug 60 Calling All Auditors _______________
  • 227. TAPE: 6106C05 SHSpec-7 Routine One, Two and Three __________

  • HCOB 4 Aug 60 Regimen One _______________
  • 228. TAPE: 6106C06 SHSpec-8 Routine One, Two and Three __________

  • HCOB 5 Aug 60 Sticking to the Rundown _______________
  • 229. HCOB 7 Jun 61 Academy Schedule, Clarification Of __________

  • HCOB 9 Aug 60 Epitaph _______________
  • 230. TAPE: 6106C07 SHSpec-9 Points in Assessing __________

  • HCOB 11 Aug 60 The Laws of Assessment _______________
  • 231. HCOB 8 Jun 61 E-Meter Watching __________

  • HCOB 18 Aug 60 Vital Information _______________
  • 232. TAPE: 6106C08 SHSpec-10 Q & A Period and Ending an Intensive __________

  • HCOB 25 Aug 60 Powerful Presession Additions _______________
  • 233. TAPE: 6106C09 SHSpec-11 Reading E-Meter Reactions __________

  • HCOB 25 Aug 60 New Definition of Psychosis _______________
  • 234. HCOB 12 Jun 61 The Rising Needle: Skip It __________

  • HCOB 26 Aug 60 Regimen Two _______________
  • 235. TAPE: 6106C12 SHSpec-12 E-Meter Actions, Errors in Auditing __________

  • HCOB 26 Aug 60 OCA Reliability Test _______________
  • 236. DEMO: Why you only use instant reads. __________

  • HCOB 1 Sep 60 PreSession Two _______________
  • 237. CLAY DEMO: What a fall, long fall, and BD are and what they mean. __________

  • HCOB 8 Sep 60 The PreSessions of the 1st Saint Hill ACC _______________
  • 238. TAPE: 6106C13 SHSpec-13 Seminar – Q & A Period __________

  • HCOB 15 Sep 60 The Tone Arm _______________
  • 239. TAPE: 6106C14 SHSpec-14 Seminar-Withholds __________

  • HCOB 19 Sep 60 ACC Lecture Tapes _______________
  • 240. TAPE: 6106C15 SHSpec-15X Not Know __________

  • HCOB 19 Sep 60 Captive Brains _______________
  • 241. HCOB 16 Jun 61 CCHs and Routine One __________

  • HCOB 19 Sep 60 Pre Sessions XI - XXXI _______________
  • 242. TAPE: 6106C16 SHSpec-16X Confront and Havingness Routine 1, 2 & 3 __________

  • HCOB 22 Sep 60 Announcing New Technology _______________
  • 243. HCOB 17 Jun 61 Primary Scale Amended __________

  • HCOB 22 Sep 60 Pre Sessions and Regimens _______________
  • 244. HCOB 19 Jun 61 Sec Check Whole Track __________

  • HCOB 23 Sep 60 Order of Test of Havingness and Confront Commands _______________
  • 245. TAPE: 6106C19 SHSpec-15 Q & A Period, Auditing Slowdowns __________

  • HCOB 28 Sep 60 Tips on how to Crack an HGC Case _______________
  • 246. TAPE: 6106C20 SHSpec-16 Sec Check Questions, Mutual Rudiments __________

  • HCOB 29 Sep 60 Havingness and Duplication _______________
  • 247. TAPE: 6106C21 SHSpec-17 Seminar at Saint Hill __________

  • HCOB 6 Oct 60 Thirty Six New Pre Sessions _______________
  • 248. TAPE: 6106C22 SHSpec-18 Running CCHs __________

  • HCOB 6 Oct 60 Current News _______________
  • 249. HCOB 23 Jun 61 Running CCHs __________

  • HCOB 10 Oct 60 Staff Theta Clearing Course _______________
  • 250. TAPE: 6106C23 SHSpec-19 Q & A Period – CCHs - Auditing __________

  • HCOB 13 Oct 60 Script of a Model Session _______________
  • 251. TAPE: 6106C26 SHSpec-20 Dealing with Attacks on Scientology __________

  • HCOB 18 Oct 60 Terminal Stable Data _______________
  • 252. HCOB 27 Jun 61 Routine One __________

  • HCOB 20 Oct 60 Theory 67 _______________
  • 253. TAPE: 6106C27 SHSpec-21 CCHs – Circuits __________

  • HCOB 20 Oct 60 Supplementary Bulletin _______________
  • 254. CLAY DEMO: How CCHs handle circuits __________

  • HCOB 27 Oct 60 Revised Case Entrance _______________
  • 255. TAPE: 6106C28 SHSpec-22 Raw Meat – Trouble Shooting Cases __________

  • HCOB 3 Nov 60 Failed Help _______________
  • 256. TAPE: 6106C29 SHSpec-23 Wrong Target – Sec Check __________

  • HCOB 10 Nov 60 Formula 13 _______________
  • 257. TAPE: 6106C30 SHSpec-24 Training on TRs – Talk on Auditing __________

  • HCOB 11 Nov 60 Change on Model Session _______________
  • 258. TAPE: 6107C03 SHSpec-26X Routine One A – Problems __________

  • HCOB 12 Nov 60 Clearing Routine _______________
  • 259. TAPE: 6107C04 SHSpec-27X Problems & Solutions __________

  • HCOB 17 Nov 60 Starting Cases _______________
  • 260. TAPE: 6107C05 SHSpec-25 Q & A Period – Procedures in Auditing __________

  • HCOB 18 Nov 60 Preclear Assessment Sheet _______________
  • 261. HCOB 6 Jul 61 Routine One A __________

  • HCOB 20 Nov 60 HAS Co-Audit Ended _______________
  • 262. TAPE: 6107C06 SHSpec-26 Routine One A – Problems __________

  • HCOB 21 Nov 60 Copy of a Letter from Mary Sue Hubbard to L. Ron Hubbard _______________
  • 263. HCOB 10 Jul 61 Metering Rudiments __________

  • HCOB 22 Nov 60 A look at the Basic Rundown _______________
  • 264. TAPE: 6107C11 SHSpec-27 Routine One A – Problems and Solutions __________

  • HCOB 24 Nov 60 The Unmoving Case _______________
  • 265. DEMO: How the Mechanism of solving problems make them persist. __________

  • HCOB 1 Dec 60 New Formulas _______________
  • 266. TAPE: 6107C12 SHSpec-28 Q & A Period __________

  • HCOB 8 Dec 60 Clearing Routine _______________
  • 267. HCOB 13 Jul 61 Change Processing and CCHs __________

  • HCOB 15 Dec 60 PreSession 37 _______________
  • 268. TAPE: 6107C14 SHSpec-29 Checking Ruds and Withholds __________

  • HCOB 19 Dec 60 PE Change _______________
  • 269.TAPE: 6107C18 SHSpec-30 Can’t Have – Create – Fundamentals of all Problems __________

  • HCOB 22 Dec 60 HAS Co-Audit Resumed _______________
  • 270. TAPE: 6107C19 SHSpec-31 Q & A Period: Auditor Effect on Meter __________

  • HCOB 22 Dec 60 O-W A Limited Theory _______________
  • 271. TAPE: 6107C20 SHSpec-32 Games Conditions __________

  • HCOB 23 Dec 60 The New PE and the New HAS Co-Audit _______________
  • 272. BTB 3 Aug 61 Getting a Process Started __________

  • Tape 6012C31 AHMC-1 The Genus of Dianetics and Scientology _______________
  • 273. TAPE: 6108C03 SHSpec-33 Creation and Goals __________

  • Tape 6012C31 AHMC-2 The Things of Scientology
  • 274. TAPE: 6108C04 SHSpec-34 Methodology of Auditing – Not Doingness and Occlusion __________

  • HCOB 5 Jan 61 O-W A Limited Theory _______________
  • 275. TAPE: 6108C08 SHSpec-35 Forgettingness __________

  • HCOB 12 Jan 61 New Help Data _______________
  • 276. HCOB 10 Aug 61 Information on Clears __________

  • HCOB 19 Jan 61 Additional HAS Processes _______________
  • 277. TAPE: 6108C11 SHSpec-38 Basics on Auditing Matter of Factness __________

  • HCOB 23 Jan 61 Addition to Script of a Model Session _______________
  • 278. TAPE: 6108C17 SHSpec-41 Rudiments – Valences __________

  • HCOB 25 Jan 61 Handling of Rudiments _______________
  • 279. TAPE: 6108C18 SHSpec-42 Control of Attention __________

  • Demonstrate in clay the purpose of Rudiments _______________
  • 280. TAPE: 6108C22 SHSpec-43 PTPs – Unknownnesses __________

  • HCOB 26 Jan 61 The Ultimate Processes _______________
  • 281. TAPE: 6108C23 SHSpec-44 Basics of Auditing __________

  • Book E-Meter Essentials _______________
  • 282. HCOB 24 Aug 61 Valences Key to Clearing __________

  • HCOB 28 Jan 61 New Assessment Scale _______________
  • 283. TAPE: 6108C24 SHSpec-45 Rudiments __________

  • HCOB 1 Feb 61 Security Checks _______________
  • 284. TAPE: 6108C29 SHSpec-46 Basics of Auditing __________

  • HCOB 2 Feb 61 Command Sheet. Pre-Havingness Scale _______________
  • 285. TAPE: 6108C30 SHSpec-47 Auditing Quality __________

  • HCOB 2 Feb 61 UK Cases Different _______________
  • 286. HCOB 31 Aug 61 Advances in Technology __________

  • HCOB 9 Feb 61 New Presession Data and Script Change _______________
  • 287. TAPE: 6108C31 SHSpec-48 What is Auditing __________

  • Tape 6102C14 3 SAACC-14 Fundamentals of Auditing _______________
  • 288. TAPE: 6109C05 SHSpec-49 Principles of Auditing __________

  • Demonstrate in clay what a process is _______________
  • 289. DEMO: The importance of an R-Factor __________

  • HCOB 16 Feb 61 Formula 19 _______________
  • 290. TAPE: 6109C06 SHSpec-50 Subjective Reality __________

  • HCOB 18 Feb 61 SOP Goals _______________
  • 291. HCOB 7 Sep 61 New Facts of Life __________

  • HCOB 20 Feb 61 Important Data on Goals SOP _______________
  • 292. TAPE: 6109C07 SHSpec-51 Reality in Auditing __________

  • HCOB 23 Feb 61 PT Problem and Goals _______________
  • 293. TAPE: 6109C12 SHSpec-52 Clearing Breakthrough __________

  • HCOB 2 Mar 61 New Pre-Have Command _______________
  • 294. TAPE: 6109C13 SHSpec-53 Sec Check and Withholds __________

  • HCOB 2 Mar 61 Use of SOP Goals Procedure _______________
  • 295. HCOB 14 Sep 61 New Rudiments Commands __________

  • HCOB 2 Mar 61 Formula 20 _______________
  • 296. TAPE: 6109C19 SHSpec-55 Q & A Period – Pre Have, Sec Checks, ARC Breaks Process __________

  • HCOB 9 Mar 61 New Assessment Scale _______________
  • 297. TAPE: 6109C20 SHSpec-56 Q & A Period – What Knowable to PC, Attention etc. __________

  • HCOB 9 Mar 61 Command Sheet. Pre-Havingness Scale _______________
  • 298. HCOB 21 Sep 61 Security Check Children __________

  • HCOB 9 Mar 61 Starting a Session _______________
  • 299. TAPE: 6109C21 SHSpec-57 Smoothness of Auditing __________

  • HCO PL 20 Mar 61 II Basic Staff Auditor’s Hat _______________
  • 300. TAPE: 6109C26 SHSpec-58 Teaching the Field – Sec Checks __________

  • HCOB 21 Mar 61 Script of a Model Session _______________
  • 301. TAPE: 6109C27 SHSpec-59 Q & A Period: States of Beingness __________

  • Demonstrate in clay the Communication Formula _______________
  • 302. HCOB 28 Sep 61 HCO WW Security Forms 7A & 7B __________

  • HCOB 23 Mar 61 SOP Goals _______________
  • 303. TAPE: 6109C28 SHSpec-60 Grades of Auditors __________

  • HCOB 31 Mar 61 SOP Goals Modified _______________
  • 304. TAPE: 6110C03 SHSpec-61 Prior Confusion __________

  • HCO PL 31 Mar 61 The Director of Processing’s Case Checking Hat _______________
  • 305. TAPE: 6110C04 SHSpec-62 Moral Codes, What is a Withhold __________

  • HCO PL 5 Apr 61 SOP Goals Goofs _______________
  • 306. HCOB 5 Oct 61 Clean Hands Make a Happy Life __________

  • HCOB 6 Apr 61 SOP Goals, Goals Assessments Problems Sorted Out _______________
  • 307. TAPE: 6110C05 SHSpec-63 Sec Checking – Types of Withholds __________

  • HCOB 6 Apr 61 II SOP Goals Repairing a Case _______________
  • 308. CLAY DEMO: Why a person has withholds __________

  • HCOB 7 Apr 61 Assessing for Goals and Terminals or elimination _______________
  • 309. HCOB 6 Oct 61 Training of Staff Auditors __________

  • HCOB 7 Apr 61 SOP Goals Modifications I
  • 310. HCOB 9 Oct 61 Rudiments, Change In __________


    311. TAPE: 6110C10 SHSpec-64 Problems Intensive __________

    1. HCO PL 7 Apr 61 Johannesburg Security Check _______________

    312. TAPE: 6110C11 SHSpec-65 Problems Intensive Assessment. __________

  • HCOB 11 Apr 61 SOP Goals, Errors _______________
  • 313. HCOB 12 Oct 61 Student Practice Sheet __________

  • HCOB 12 Apr 61 Training Drills _______________
  • 314. TAPE: 6110C12 SHSpec-66 Problems __________

  • HCOB 17 Apr 61 Training Drills Modernized _______________
  • 315. HCOB 17 Oct 61 Problems Intensive __________

  • Demonstrate in clay the purpose of each TR 0-4 _______________
  • 316. TAPE: 6110C17 SHSpec-67 Problems Intensive Procedures __________

  • HCOB 18 Apr 61 S.O.P Goals _______________
  • 317. TAPE: 6110C18 SHSpec-68 Valence – Circuits __________

  • HCOB 23 Apr 61 Change Processes _______________
  • 318. HCOB 19 Oct 61 Security Questions Must be Nulled __________

  • HCO PL 25 Apr 61 DofP Form, Check Type One _______________
  • 319. TAPE: 6110C19 SHSpec-69 Q & A Period – Flows __________

  • HCOB 27 Apr 61 Change Processes _______________
  • 320. TAPE: 6110C24 SHSpec-70 Clearing __________

  • HCOB 30 Apr 61 Change Brackets and Commands _______________
  • 321. HCOB 26 Oct 61 Safe Auditing Table __________

  • Book E-Meter Essentials _______________
  • 322. TAPE: 6110C26 SHSpec-72 Security Checking Auditing Errors __________

  • HCOB 4 May 61 Process Levels. Necessity for Training _______________
  • 323. TAPE: 6110C31 SHSpec-73 Rudiments __________

  • Demonstrate in clay ”Change” _______________
  • 324. TAPE: 6111C01 SHSpec-74 Formation of Commands __________

    I attest that I have completed Part 1 of this checksheet, that I have used full study tech throughout, that I have no misunderstood and know and can apply the materials:

    325. HCOB 2 Nov 61 The Prior Confusion __________

    STUDENT: ___________________________ DATE: _______________

    326. CLAY DEMO: Why all problems are preceded by a prior confusion and how to handle __________

    I attest that student has completed the requirements of Part 1 of this checksheet and does know and can apply the materials:

    327. HCOB 2 Nov 61 Rudiments and Clearing __________

    COURSE SUPERVISOR: ___________________ DATE: _______________

    328. TAPE: 6111C02 SHSpec-75 How to Security Check __________

    Student has passed a metered check for misunderstoods on these materials and has passed a written examination on the key materials 100 %:

    329. TAPE: 6111C08 SHSpec-77 Checking Case Reports __________

    STUDENT EXAMINER:____________________ DATE: ________________

    330. TAPE: 6111C09 SHSpec-78 Effective Auditing __________


    331. HCOB 9 Nov 61 The Problems Intensive, Use of the Prior Confusion __________

    PART – 2 (1961 – 1962)
    SHSBC started 13 May 61

    332. HCOB 16 Nov 61 Sec Checking, Generalities Won’t Do __________

    1. Tape 6105C07 SHSpec-1 E-Meter Talk and Demo _______________

    333. TAPE: 6111C16 SHSpec-81 Points in Assessing __________

  • HCOB 11 May 61 E-Meter Horror _______________
  • 334. TAPE: 6111C22 SHSpec-83 Reading the E-Meter __________

  • HCOB 11 May 61 Assessment by Elimination, SOP Goals _______________
  • 335. TAPE: 6111C23 SHSpec-84 Auxiliary Pre-Have 3D Scale __________

  • Tape 6105C12 SHSpec-2 Assessment _______________
  • 336. HCOB 23 Nov 61 Meter Reading __________

  • HCOB 13 May 61 Assessing for SOP Goals, Improved _______________
  • 337. HCOB 23 Nov 61 Auxiliary Pre-Have 3D Scale __________

  • HCOB 19 May 61 Urgent Assessment Data _______________
  • 338. TAPE: 6111C28 SHSpec-85 Havingness __________

  • Tape 6105C19 SHSpec-3 E-Meter _______________
  • 339. TAPE: 6111C29 SHSpec-86 E-Meter-Tips __________

  • HCO PL 22 May 61 The Only Valid Security Check _______________
  • 340. BTB 29 Nov 61 Student Processing Check and 2nd Dynamic Processing Check __________

  • HCOB 23 May 61 Pre-Have Scale Revised _______________
  • 341. HCOB 30 Noc 61 ARC Process 1961 __________

  • Demonstrate in Clay What Assessment is _______________
  • 342. TAPE: 6112C01 SHSpec-89 Sec Checks Necessary __________

  • HCOB 25 May 61 Releasing and Preparing a Case for SOP Goals _______________
  • 343. HCOB 7 Dec 61 Sec Checks Vital __________

  • Tape 6105C26 SHSpec-4 On Auditing _______________
  • 344. TAPE: 6112C12 SHSpec-91 Sec Checks in Processing __________

  • HCOB 29 May 61 Clarification of Change Processing _______________
  • 345. HCOB 13 Dec 61 Varying Sec Check Questions __________

  • HCOB 1 Jun 61 Assessing _______________
  • 346. TAPE: 6112C14 SHSpec-93 Anatomy of Problems __________

  • Tape 6106C01 SHSpec-5 Flattening a Process and E-Meter _______________
  • 347. HCOB 14 Dec 61 Rudiments Modernized __________

  • Tape 6106C02 SHSpec-6 Flows, Pre-Hav Scale, Primary _______________
  • 348. TAPE: 6112C20 SHSpec-95 Upgrading of Auditors __________

  • HCOB 5 Jun 61 Processes Allowed _______________
  • 349. HCOB 21 Dec 61 Model Session Script Revised __________

  • Tape 6106C05 SHSpec-7 Routine One, Two and Three _______________
  • 350. HCOB 28 Dec 61 E-Meter Electrodes __________

  • Tape 6106C06 SHSpec-8 Security Checks _______________
  • END OF PART 2
  • HCOB 7 Jun 61 Academy Schedule, Clarification Of _______________
  • The student routes to Qual to attest to Part 2 of the Class V Checksheet.

  • Tape 6106C07 SHSpec-9 Points in Assessing _______________
  • I attest that I have completed Part 2 of this Checksheet, that I have used full study tech throughout, that I have no Misunderstoods and know and can apply the materials:

  • HCOB 8 Jun 61 E-Meter Watching _______________
  • STUDENT:________________________________________ DATE:______________

  • Tape 6106C08 SHSpec-10 Q&A Period and Ending an Intensive _______________
  • I attest that student has completed the requirements of Part 2 of this checksheet and does know and can apply the materials:

  • Tape 6106C09 SHSpec-11 Reading E-Meter Reactions _______________
  • COURSE SUPERVISOR:______________________________ DATE:______________

  • HCOB 12 Jun 61 The Rising Needle: Skip it _______________
  • The student attestation on completion of Part Two has been received and logged:

  • Tape 6106C129 SHSpec-12 E-Meter Actions, Errors in Auditing _______________
  • CERTS & AWARDS OFFICER:_________________________ DATE:______________

  • Tape 6106C13 SHSpec-13 Seminar - Q&A Period _______________
  • PART 3 (1962)

  • Tape 6106C14 SHSpec-14 Seminar - Withholds _______________
  • 1. TAPE: 6201C10 SHSpec-98 Sec Checks – Withholds __________

  • Tape 6106C15 SHSpec-15X Not Know _______________
  • 2. TAPE: 6201C11 SHSpec-99 How to Audit __________

  • HCOB 16 Jun 61 CCHs and Routine One _______________
  • 3. HCOB 11 Jan 62 Security Checking, Twenty-Ten Theory __________

  • Tape 6106C16 SHSpec-16X Confront and Havingness Routine 1, 2 & 3 _______________
  • 4. CLAY DEMO: The Definition of Havingness __________

  • HCOB 17 Jun 61 Primary Scale Amended _______________
  • 5. TAPE: 6201C16 SHSpec-100 Nature of Withholds __________

  • HCOB 19 Jun 61 Sec Check Whole Track _______________
  • 6. TAPE: 6201C23 SHSpec-103 Basics of Auditing __________

  • Tape 6106C19 SHSpec-15 Q&A Period, Auditing Slowdowns _______________
  • 7. TAPE: 6201C24 SHSpec-104 Training-Duplication __________

  • Tape 6106C20 SHSpec-16 Sec Check Questions, Mutual Rudiments _______________
  • 8. HCOB 25 Jan 62 Flow Process __________

  • Tape 6106C21 SHSpec-17 Seminar at Saint Hill _______________
  • 9. TAPE: 6201C30 SHSpec-106 In-Sessioness __________

  • Tape 6106C22 SHSpec-18 Running CChs _______________
  • 10. TAPE: 6202C01 SHSpec-108 Flows __________

  • HCOB 23 Jun 61 Running CCHs _______________
  • 11. DRILL: Make a diagram of the 8 flows __________

  • Tape 6106C23 SHSpec-19 Q&A Period – CCHs Auditing _______________
  • 12. HCOB 1 Feb 62 Flows, Basic __________

  • Tape 6106C26 SHSpec-20 Dealing with Attacks on Scientology _______________
  • 13. TAPE: 6202C06 SHSpec-111 Withholds __________

  • HCOB 27 Jun 61 Routine One _______________
  • 14. TAPE: 6202C07 SHSpec-112 Missed Withholds __________

  • Tape 6106C27 SHSpec-21 CCHs - Circuits _______________
  • 15. CLAY DEMO: “Missed Withholds” __________

  • Demonstrate in clay ”a Circuit” _______________
  • 16. HCOB 8 Feb 62 Urgent Missed Withholds __________

  • Tape 6106C28 SHSpec-22 Raw Meat – Trouble Shooting Cases _______________
  • 17. HCOB 12 Feb 62 How to Clear Withholds and Missed Withholds __________

  • HCO PL 29 Jun 61 Scientology Students’ Security Check _______________
  • 18. CLAY DEMO: The exact system of pulling withholds __________

  • Tape 6106C29 SHSpec-23 Wrong Target – Sec Check _______________
  • 19. TAPE: 6202C13 SHSpec-110 Prep Clearing __________

  • Tape 6106C30 SHSpec-24 Training on TRs – Talk on Auditing _______________
  • 20. TAPE: 6202C14 SHSpec-117 Directing Attention __________

  • Tape 6107C03 SHSpec-26X Routine 1A - Problems _______________
  • 21. TAPE: 6202C15 SHSpec-118 Prepchecking __________

  • Tape 6107C04 SHSpec-27X Routine 1A - Problems and Solutions _______________
  • 22. HCOB 15 Feb 62 Co-Audit and Missed Withholds __________

  • Tape 6107C05 SHSpec-25 Q&A Period – Procedures in Auditing _______________
  • 23. TAPE: 6202C20 SHSpec-113 What is a Withhold __________

  • HCOB 6 Jul 61 Routine One A _______________
  • 24. TAPE: 6202C21 SHSpec-114 Use of Prepchecking __________

  • Tape 6107C06 SHSpec-26 Routine 1A – Problems and Confront *var. Problems _______________
  • 25. TAPE: 6202C22 SHSpec-119 Prepclearing and Rudiments __________

  • HCO PL 7 Jul 61 II HGC Auditor’s Sec Check _______________
  • 26. HCOB 22 Feb 62 Withholds, Missed and Partial __________

  • HCOB 10 Jul 61 Metering Rudiments _______________
  • 27. TAPE: 6202C27 SHSpec-115 Prepchecking __________

  • Tape 6107C11 SHSpec-27 Routine 1A – Problems and Security Check *var. Problems and Solutions _______________
  • 28. TAPE: 6202C27 SHSpec-116 Auditors Code __________

  • Demonstrate in clay ”problem” and ”solution” _______________
  • 29. TAPE: 6203C01 SHSpec-120 Model Session I __________

  • Tape 6107C12 SHSpec-28 Q&A Period – Anatomy of Maybe, Solutions _______________
  • 30. TAPE: 6203C01 SHSpec-121 Model Session II __________

  • HCOB 13 Jul 61 Change Processing and CCHs (see footnote Vol IV page 320) _______________
  • 31. HCOB 1 Mar 62 Prepchecking __________

  • Tape 6107C14 SHSpec-29 Checking Ruds and Withholds _______________
  • 32. HCOB 8 Mar 62 The Bad Auditor __________

  • HCOB 17 Jul 61 Withholds _______________
  • 33. HCOB 15 Mar 62 Suppressors __________

  • Tape 6107C18 SHSpec-30 Can‘t Have – Create – Fundamentals of all Problems _______________
  • 34. DEMO: The Suppressor mechanism in auditing and how it would affect the pc. __________

  • Tape 6107C19 SHSpec-31 Q&A Period: Auditor Effect on E-Meter _______________
  • 35. TAPE: 6203C19 SHSpec-122 The Bad Auditor __________

  • Tape 6107C20 SHSpec-32 Games Conditions _______________
  • 36. TAPE: 6203C19 SHSpec-123 Mechanics of Suppressions __________

  • HCOB 3 Aug 61 Getting a Process Started _______________
  • 37. TAPE: 6203C21 SHSpec-124 Prepchecking __________

  • Tape 6108C03 SHSpec-33 Creation and Goals _______________
  • 38. TAPE: 6203C21 SHSpec-125 Prepchecking __________

  • Tape 6108C04 SHSpec-34 Methodology of Auditing – Not Doingness and Occlusion _______________
  • 39. HCOB 21 Mar 62 Prepchecking Data, When to Do a What __________

  • Tape 6108C08 SHSpec-35 Forgettingness _______________
  • 40. TAPE: 6203C27 SHSpec-130 Prepchecking Data __________

  • HCOB 10 Aug 61 Information on Clears _______________
  • 41. TAPE: 6203C29 SHSpec-126 CCHs __________

  • Tape 6108C11 SHSpec-38 Basics of Auditing. Matter of Factness _______________
  • 42. TAPE: 6203C29 SHSpec-127 Q and A Period __________

  • Tape 6108C17 SHSpec-41 Rudiments - Valences _______________
  • 43. HCOB 29 Mar 62 CCHs Again __________

  • Tape 6108C18 SHSpec-42 Control of Attention _______________
  • 44. TAPE: 6204C03 SHSpec-131 The Overt-Motivator Sequence __________

  • Tape 6108C22 SHSpec-43 PTPs - Unknownnesses _______________
  • 45. TAPE: 6204C05 SHSpec-128 Sacredness of Cases – Self, Other and Pan Determined __________

  • Tape 6108C23 SHSpec-44 Basics of Auditing _______________
  • 46. TAPE: 6204C05 SHSpec-129 As-is-ness, People Who Can and Can’t As-Is __________

  • HCOB 24 Aug 61 Valences Key to Clearing _______________
  • 47. HCOB 5 Apr 62 CCHs Auditing Attitude __________

  • Tape 6108C24 SHSpec-45 Rudiments _______________
  • 48. HCOB 11 Apr 62 Determining What to Run __________

  • Tape 6108C29 SHSpec-46 Basics of Auditing _______________
  • 49. HCOB 12 Apr 62 CCHs Purpose __________

  • Tape 6108C30 SHSpec-47 Auditing Quality _______________
  • 50. CLAY DEMO: The Purpose of CCHs __________

  • HCOB 31 Aug 61 Advances in Technology _______________
  • 51. TAPE: 6204C17 SHSpec-132 Auditing __________

  • Tape 6108C31 SHSpec-48 What is Auditing _______________
  • 52. TAPE: 6204C17 SHSpec-133 How and Why Auditing Works __________

  • Demonstrate in clay ”auditing” _______________
  • 53. TAPE: 6204C19 SHSpec-134 Gross Auditing Errors __________

  • Tape 6109C05 SHSpec-49 Principles of Auditing _______________
  • 54. TAPE: 6204C19 SHSpec-135 Determining What to Run __________

  • Tape 6109C06 SHSpec-50 Subjective Reality _______________
  • 55. TAPE: 6204C26 SHSpec-138 Rundown on Prepchecking __________

  • Demonstrate in clay ”subjective” and ”objective” _______________
  • 56. HCOB 26 Apr 62 Recommended Processes HGC __________

  • HCOB 7 Sep 61 New Facts of Life _______________
  • 57. TAPE: 6205C01 SHSpec-140 Missed Withholds __________

  • Tape 6109C07 SHSpec-51 Reality in Auditing _______________
  • 58. TAPE: 6205C02 SHTVD-4A Prepchecking (Aud LRH) __________

  • Tape 6109C12 SHSpec-52 Clearing Breakthrough _______________
  • 59. TAPE: 6205C02 SHTVD-4B Prepchecking (Aud LRH) __________

  • HCO PL 12 Sep 61 Curriculum for Clearing Courses _______________
  • 60. TAPE: 6205C03 SHSpec-142 Craftmanship – Fundamentals __________

  • Tape 6108C13 SHSpec-53 Sec Check and Withholds _______________
  • 61. TAPE: 6205C03 SHSpec-143 Prepchecking __________

  • HCOB 14 Sep 61 New Rudiments Commands _______________
  • 62. HCOB 3 May 62 ARC Breaks Missed Withholds __________

  • Tape 6109C14 SHSpec-54 – Goals and Terminals Assessment _______________
  • 63. CLAY DEMO: The Source of all ARC Bks and why this is. __________

  • Tape 6109C19 SHSpec-55 Q&A Period – Pre Have, Sec Checks, ARC Breaks Process _______________
  • 64. HCOB 10 May 62 Prepchecking and Sec Checking __________

  • Tape 6109C20 SHSpec-56 Q&A Period – What Knowable to PC, Attention etc. _______________
  • 65. HCOB 14 May 62 Case Repair __________

  • HCOB 21 Sep 61 Security Check Children _______________
  • 66. TAPE: 6205C15 SHSpec-144 New Training Sections __________

  • Tape 6109C21 SHSpec-57 Smoothness of Auditing _______________
  • 67. TAPE: 6205C15 SHSpec-145 New TRs __________

  • Tape 6109C26 SHSpec-58 Teaching the Field - Sec Checks _______________
  • 68. TAPE: 6205C17 SHSpec-146 Auditing Errors __________

  • Tape 6109C27 SHSpec-59 Q&A Period: States of Beingness _______________
  • 69. TAPE: 6205C17 SHSpec-147 Prepchecking __________

  • HCOB 29 Sep 61 HCO WW Security Forms 7A & 7B _______________
  • 70. HCOB 21 May 62 Missed Withholds, Asking About __________

  • HCO PL 29 Sep 61 HGC Allowed Processes _______________
  • 71. TAPE: 6205C22 SHSpec-150 Administration of Courses __________

  • Tape 6109C28 SHSpec-60 Grades of Auditors _______________
  • 72. TAPE: 6205C22 SHSpec-151 Missed Withholds __________

  • Tape 6110C03 SHSpec-61 Prior Confusion _______________
  • 73. HCOB 22 May 62 Model Session Change __________

  • Tape 6110C04 SHSpec-62 Moral Codes. What is a Withhold _______________
  • 74. TAPE: 6205C23 SHTVD-6 Check on “What” same as (7202C26 LRH/MTS-4) Question & Havingness Probe __________

  • HCOB 5 Oct 61 Clean Hands Make A Happy Life _______________
  • 75. TAPE: 6205C23 SHTVD-7 Fish and Fumble – same as (7202C26 LRH/MTS-5) Checking Dirty Needles __________

  • Tape 6110C05 SHSpec-63 Sec Checking – Types of Withholds _______________
  • 76. HCOB 23 May 62 E-Meter Reads: Prepchecking How Meters get Invalidated __________

  • Demonstrate in clay withholds _______________
  • 77. TAPE: 6205C24 SHSpec-148 E-Meter Data – Instant Reads __________

  • HCOB 6 Oct 61 Training of Staff Auditors _______________
  • 78. TAPE: 6205C24 SHSpec-149 E-Meter Data – Instant Reads II __________

  • HCOB 9 Oct 61 Rudiments, Change in _______________
  • 79. CLAY DEMO:Why out TRs can obscure an instant read __________

  • HCO PL 10 Oct 61 Problems Intensives for Staff Clearing _______________
  • 80. HCOB 24 May 62 Q and A __________

  • Tape 6110C10 SHSpec-64 Problems Intensive _______________
  • 81. DEMO: The 3 Qs & As __________

  • Tape 6110C11 SHSpec-65 Problems Intensive Assessment _______________
  • 82. HCOB 25 May 62 E-Meter Instant Reads __________

  • HCOB 12 Oct 61 Student Practice Sheet _______________
  • 83. TAPE: 6205C29 SHSpec-152 Question and Answer Period __________

  • Tape 6110C12 SHSpec-66 Problems _______________
  • 84. TAPE: 6205C29 SHSpec-153 Security Check Prepchecking __________

  • HCOB 17 Oct 61 Problems Intensive _______________
  • 85. TAPE: 6205C30 SHTVD-8A Getting Rudiments In (Aud LRH) __________

  • Tape 6110C17 SHSpec-67 Problems Intensives Procedures _______________
  • 86. TAPE: 6205C30 SHTVD-8B Getting Rudiments In (Aud. LRH) __________

  • Tape 6110C18 SHSpec-68 Valence - Circuits _______________
  • 87. TAPE: 6205C31 SHSpec-154 Value of Rudiments __________

  • HCOB 19 Oct 61 Security Questions Must be Nulled _______________
  • 88. TAPE: 6205C31 SHSpec-155 Middle Rudiments __________

  • Tape 6110C19 SHSpec-69 Q & A Period - Flows _______________
  • 89. CLAY DEMO: What a Rudiment is and its purpose __________

  • HCO PL 23 Oct 61 HGC Pre-Processing Security Check _______________
  • 90. HCOB 8 Jun 62 Rudiments checking __________

  • Tape 6110C24 SHSpec-70 Clearing _______________
  • 91. HCOB 11 Jun 62 Prepchecking the Middle Rudiments __________BPL 8.1.72RA Revised

  • Tape 6110C25 SHSpec-71 Importance of Goals Terminals _______________
  • 18.1.75 - 20 -

  • HCOB 26 Oct 61 Safe Auditing Table _______________
  • 92. TAPE: 6206C12 SHSpec-161 Middle Rudiments __________

  • Tape 6110C26 SHSpec-72 Security Checking Auditing Errors _______________
  • 93. TAPE: 6206C14 SHSpec-156 Future Technology __________

  • Tape 6110C31 SHSpec-73 Rudiments _______________
  • 94. TAPE: 6206C14 SHSpec-157 Listing __________

  • Tape 6111C01 SHSpec-74 Formation of Commands _______________
  • 95. CLAY DEMO: What listing is __________

  • HCO PL 1 Nov 61 HCOWW Security Form 5A _______________
  • 96. HCOB 14 Jun 62 Checking Needle in Rudiments Checks __________

  • HCOB 2 Nov 61 The Prior Confusion _______________
  • 97. TAPE: 6206C19 SHSpec-159 Question and Answer Period __________

  • Demonstrate in clay The Prior Confusion _______________
  • 98. TAPE: 6206C21 SHSpec-162 Model Session Revised __________

  • HCOB 2 Nov 61 Rudiments and Clearing _______________
  • 99. TAPE: 6206C21 SHSpec-163 Question and Answer Period __________

  • HCOB 2 Nov 61 Training CCHs _______________
  • 100. HCOB 23 Jun 62 Model Session Revised __________

  • Tape 6111C02 SHSpec-75 How to Security Check _______________
  • 101. HCOB 24 Jun 62 Prepchecking __________

  • Tape 6111C07 SHSpec-76 Routine 3A _______________
  • 102. HCOB 25 Jun 62 E-Meter-Standards __________

  • HCOB 7 Nov 61 Routine 3A _______________
  • 103. TAPE: 6206C26 SHSpec-164 E-Meter Quality __________

  • Tape 6111C08 SHSpec-77 Checking Case Reports _______________
  • 104. TAPE: 6206C26 SHSpec-165 Prepchecking __________

  • Tape 6111C09 SHSpec-78 Effective Auditing _______________
  • 105. TAPE: 6206C28 SHSpec-166 Rudiments __________

  • HCOB 9 Nov 61 The Problems Intensive. Use of the Prior Confusion _______________
  • 106. TAPE: 6206C28 SHSpec-167 Question and Answer Period __________

  • HCO Info Ltr 14 Nov 61 Routine 3D _______________
  • 107. HCOB 28 Jun 62 Dirty Needles – How To Smooth Out Needles __________

  • Tape 6111C14 SHSpec-79 Routine 3D _______________
  • 108. DEMO: What causes a dirty needle __________

  • Tape 6111C15 SHSpec-80 Routine 3D Continued _______________
  • 109. BTB 29 Jun 62 How to Acknowledge __________

  • HCOB 16 Nov 61 Sec Checking. Generalities Won‘t Do _______________
  • 110. CLAY DEMO:

  • Tape 6111C16 SHSpec-81 Points in Assessing _______________
  • a. Why you acknowledge __________

  • HCO Info Ltr 20 Nov 61 Routine 3D Commands _______________
  • b. Underacknowledgement __________

  • Tape 6111C21 SHSpec-82 Running 3D _______________
  • c. Over-acknowledgement __________

  • Tape 6111C22 SHSpec-83 Reading the E Meter _______________
  • 111. HCOB 30 Jun 62 ARC Process __________

  • HCOB 23 Nov 61 Meter Reading _______________
  • 112. HCOB 2 Jul 62 Repetitive Rudiments, How to Get the Rudiments In __________

  • HCOB 23 Nov 61 Auxilliary Pre Have Scale _______________
  • 113. HCOB 3 Jul 62 Repetitive Prepchecking __________

  • Tape 6111C23 SHSpec-84 Auxilliary Pre-Have 3D Scale _______________
  • 114. HCOB 4 Jul 62 Bulletin Changes __________

  • HCO Cmd Sht 27 Nov 61 Routine 3D Command Sheet _______________
  • 115. HCOB 4 Jul 62 Coachless Training, Use of a Doll __________

  • HCO Cmd Sht 28 Nov 61 Routine 3D Improve Commands of 28 Nov 61 _______________
  • 116. TAPE: 6207C10 SHSpec-168 Repetitive Rudiments and Repetitive Prepchecking Part I __________

  • Tape 6111C28 SHSpec-85 Havingness _______________
  • 117. TAPE: 6207C10 SHSpec-169 Repetitive Rudiments and Repetitive Prepchecking Part II __________

  • Tape 6111C29 SHSpec-86 E-Meter Tips _______________
  • 118. TAPE: 6207C12 SHSpec-174 Meter Reading __________

  • HCO PL 29 Nov 61 Class of Auditors ______________
  • 119. TAPE: 6207C12 SHSpec-175 Meter Training __________

  • HCO Cmd Sht 30 Nov 61 Routine 3D Improve Commands of 30 Nov 61 _______________
  • 120. BTB 12 Jul 62 Motivatorish Cases __________

  • HCOB 30 Nov 61 ARC Process 1961 _______________
  • 121. CLAY DEMO: The Motivatorish Case and how it got in that condition __________

  • Tape 6111C30 SHSpec-87 Parts of 3D _______________
  • 122. TAPE: 6207C17 SHSpec-170 E-Meter Reads and ARC Breaks __________

  • HCOB 3 Dec 61 Running 3D Levels _______________
  • 123. TAPE: 6207C17 SHSpec-171 Anatomy of ARC Breaks __________

  • Tape 6112C05 SHSpec-88 Assessing 3D _______________
  • 124. CLAY DEMO: An ARC/B __________

  • Tape 6112C06 SHSpec-89 Sec Checks Necessary _______________
  • 125. TAPE: 6207C19 SHSpec-172 The E-Meter __________

  • HCO Cmd Sht 7 Dec 61 Command Sheet for Routine 3D _______________
  • 126. TAPE: 6207C19 SHSpec-173 Question and Answer Period __________

  • Tape 6112C07 SHSpec-90 Expectancy of 3D _______________
  • 127. HCOB 21 Jul 62 Urgent, Instant Reads __________BPL 8.1.72RA Revised

  • HCOB 7 Dec 61 Sec Checks Vital _______________
  • 18.1.75 - 21 -

  • Tape 6112C12 SHSpec-91 Sec Checks in Processing _______________
  • 128. CLAY DEMO: The definition of an instant read __________

  • Tape 6112C13 SHSpec-92 Assessing 3D _______________
  • 129. TAPE: 6207C26 SHSpec-179 Prepchecking __________

  • HCOB 13 Dec 61 Varying Sec Check Questions _______________
  • 130. HCOB 30 Jul 62 A Smooth 25 Hour Intensive __________

  • Tape 6112C14 SHSpec-93 Anatomy of Problems _______________
  • 131. HCOB 2 Aug 62 CCH Answers __________

  • HCOB 14 Dec 61 Rudiments Modernized _______________
  • 132. HCOB 7 Aug 62 Running CCHs __________

  • Tape 612C19 SHSpec-94 3D Packages 191261 _______________
  • 133. DEMO: How CCHs are run __________

  • Tape 6112C20 SHSpec-95 Upgrading of Auditors _______________
  • 134. TAPE: 6208C09 SHSpec-182 Clearing __________

  • Tape 6112C21 SHSpec-96 Probabilities of 3D _______________
  • 135. HCOB 10 Aug 62 How it Feels to Go Clear __________

  • HCOB 21 Dec 61 Model Session Script Revised _______________
  • 136. HCOB 13 Aug 62 Rock Slams and Dirty Needles __________

  • HCO Cmd Sht 26 Dec 61 Command Sheet Routine 3D _______________
  • 137. TAPE: 6208C14 SHSpec-184 Rock Slams & Dirty Needles __________

  • HCOB 28 Dec 61 E-Meter Electrodes _______________
  • 138. TAPE: 6208C14 SHSpec-185 World Clearing __________

  • HCOB 28 Dec 61 II 3-D Rules of Thumb _______________
  • 139. TAPE: 6208C21 SHSpec-188 Basics of Auditing __________

  • HCOB 29 Dec 61 Technical Data Changes _______________
  • 140. BTB 30 Aug 62 Missed Withhold Handling __________

  • BTB 4 Jan 62R Confessional Fundamentals *var. Confessional _______________
  • 141. HCOB 30 Aug 62 Order of Prepcheck Buttons __________

  • HCO PL 6 Jan 62 Laudatory Withholds _______________
  • 142. HCOB 2 Sep 62 Account of Congress Goal __________

  • HCO Info Ltr 9 Jan 62 3D Criss Cross
  • 143. BTB 6 Sep 62 CCHs More Information __________

  • Tape 6201C09 SHSpec-97 Twenty-Ten, 3D Criss Cross _______________
  • 144. ESSAY: Why the CCHs are motion processes __________

  • Tape 62 01C10 SHSpec-98 Sec Checks - Withholds _______________
  • 145. HCOB 12 Sep 62 Security Checks Again __________

  • Tape 62 01C11 SHSpec-99 How to Audit _______________
  • 146. TAPE: 6209C18 SHSpec-189 Directing PC’s Attention __________

  • HCOB 11 Jan 62 Security Checking, Twenty-Ten Theory _______________
  • 147. TAPE: 6209C20 SHSpec-191 Listing Lines __________

  • Tape 62 01C16 SHSpec-100 Nature of Withholds _______________
  • 148. TAPE: 6209C21 SHSpec-192 Geriatrics __________

  • HCO PL 17 Jan 62 Responsibility Again _______________
  • 149. TAPE: 6209C25 SHSpec-193 Current Trends __________

  • Tape 6201C17 SHSpec-101 Criss Cross and GPM Anatomy _______________
  • 150. HCOB 27 Sep 62 Problems Intensive Use __________

  • Tape 6201C18 SHSpec-102 How to do 3D Criss Cross _______________
  • 151. HCOB 2 Oct 62 When you need reassurance __________

  • HCO Info Ltr 22 Jan 62 3D Criss Cross, Method of Assessment _______________
  • 152. TAPE: 6210C03 SHTVD-15A Prepchecking a Goal Part 1 __________

  • Tape 62 01C23 SHSpec-103 Basics of Auditing _______________
  • 153. TAPE: 6210C03 SHTVD-15B Prepchecking a Goal Part 2 __________

  • Tape 62 01C24 SHSpec-104 Training - Duplication _______________
  • 154. TAPE: 6210C04 SHSpec-198 Modern Security Checking __________

  • Tape 6201C25 SHSpec-105 Whole Track _______________
  • 155. TAPE: 6210C09 SHSpec-200 Future Org Trends __________

  • HCOB 25 Jan 62 Flow Process _______________
  • 156. TAPE: 6210C09 SHSpec-201 Instructors Bug-Bear __________

  • Tape 6201C30 SHSpec-106 In-Sessionness _______________
  • 157. HCOB 13 Oct 62 Processes __________

  • Tape 6201C31 SHSpec-107 Usages of 3D Criss Cross _______________
  • 158. HCOB 17 Oct 62 Auditor Failure to Understand __________

  • Tape 62 02C01 SHSpec-108 Flows _______________
  • 159. HCOB 29 Oct 62 Pre-Clearing Intensive __________

  • Demonstrate in Clay Flows _______________
  • 160. TAPE: 6210C30 SHSpec-204 Pre-Have Scales and Lists __________

  • HCOB 1 Feb 62 Flows, Basic _______________
  • 161. TAPE: 6211C01 SHSpec-205 The Missed Missed Withhold __________

  • HCO Info Ltr 1 Feb 62 3D Criss Cross, Assessment Tips _______________
  • 162. CLAY DEMO: A missed missed withhold and its manifestations on pc __________

  • HCO Info Ltr 3 Feb 62 3DXX Flows Assessment _______________
  • 163. TAPE: 6211C01 SHSpec-207 The Road to Truth __________

  • Tape 62 02C06 SHSpec-111 Withholds _______________
  • 164. HCOB 7 Nov 62 Roll your own Pre-Hav __________

  • Tape 62 02C07 SHSpec-112 Missed Withholds _______________
  • 165. TAPE: 6211C13 SHSpec-210 The Difficult Case __________

  • Demonstrate in clay ”Missed Withholds” _______________
  • 166. TAPE: 6211C13 SHSpec-211 Entrance to Cases __________

  • Tape 6202C08 3D Criss Cross Assessment _______________
  • 167. TAPE: 6211C15 SHSpec-212 Terminals __________

  • HCOB 8 Feb 62 Urgent - Missed Withholds _______________
  • 168. TAPE: 6211C15 SHSpec-213 Clearing Technology __________

  • HCOB 12 Feb 62 How to Clear Withholds and Missed Withholds _______________
  • 169. TAPE: 6211C20 SHSpec-215 Fundamentals of Auditing __________

  • Tape 62 02C13 SHSpec-110 Prep Clearing _______________
  • 170. TAPE: 6211C22 SHSpec-216 Q & A Period Part I __________

  • HCO PL 13 Feb 62 3D Criss Cross Items _______________
  • 171. TAPE: 6211C22 SHSpec-217 Q & A Period Part II __________

  • Tape 62 02C14 SHSpec-117 Directing Attention _______________
  • 172. HCOB 23 Nov 62 Urgent – Routine Two-Twelve __________

  • Tape 62 02C15 SHSpec-118 Prepchecking _______________
  • 173. HCOB 24 Nov 62 Routine 2-12, List One __________

  • HCOB 15 Feb 62 Co-Audit and Missed Withholds _______________
  • 174. TAPE: 6211C27 SHSpec-218 Routine 2-12 __________

  • Tape 62 02C20 SHSpec-113 What is a Withhold _______________
  • 175. TAPE: 6211C27 SHSpec-219 Routine 2-12 __________

  • Tape 62 02C21 SHSpec-114 Use of Prepchecking _______________
  • 176. HCOB 28 Nov 62 R2-12, Practical Drills __________

  • Tape 62 02C22 SHSpec-119 Prepclearing and Rudiments _______________
  • 177. TAPE: 6211C29 SHSpec-220 R2-12 Theory and Practice Part I __________

  • HCOB 22 Feb 62 Withholds, Missed and Partial _______________
  • 178. TAPE: 6211C29 SHSpec-221 R2-12 Theory and Practice Part II __________

  • Tape 62 02C27 SHSpec-115 Prepchecking and Basics _______________
  • 179. HCOB 29 Nov 62 R2-12, List One – Issue II __________

  • Tape 62 02C27 SHSpec-116 Auditors Code _______________
  • 180. HCOB 4 Dec 62 Routine 2-12, List One – Issue III __________

  • Tape 62 03C01 SHSpec-120 Model Session I _______________
  • 181. HCOB 8 Dec 62 Training X Unit __________

  • Tape 62 03C01 SHSpec-121 Model Session II _______________
  • 182. HCOB 9 Dec 62 Routine 2-12 List One __________

  • HCOB 1 Mrz 62 Prepchecking _______________
  • 183. TAPE: 6212C11 SHSpec-222 R2-12 Data __________

  • HCOB 8 Mrz 62 The Bad “Auditor” _______________
  • 184. TAPE: 6212C11 SHSpec-223 Phantom RS __________

  • HCOB 15 Mrz 62 Suppressors _______________
  • 185. TAPE: 6212C13 SHSpec-224 R2-12 Data, Needle Behaviour __________

  • Tape 62 03C19 SHSpec-122 The Bad Auditor _______________
  • 186. TAPE: 6212C13 SHSpec-225 Repair of R2-12 Clean Needle __________

  • Tape 62 03C19 SHSpec-123 Mechanics of Suppression _______________
  • 187. HCOB 15 Dec 62 Urgent R2-12, The Fatal Error __________

  • Tape 6203C20 TV Demo; 3D Criss Cross Assessment, Part I _______________
  • 188. HCOB 30 Dec 62 Routine 2-12 and 2-10 __________

  • Tape 6203C20 TV Demo; 3D Criss Cross Assessment, Part II _______________
  • END OF PART III
  • Tape 62 03C21 SHSpec-124 Object of Prepchecking _______________
  • The student routes to Qual to attest to Part 3 of the Class V Checksheet.

  • Tape 62 03C21 SHSpec-125 Prepchecking, Zero Question _______________
  • I attest that I have completed Part 3 of this checksheet, That I have used full study tech throughout, that I have no Misunderstoods and know and can apply the materials.

  • HCOB 21 Mrz 62 Prepchecking Data - When to do a What _______________
  • STUDENT:_______________________________________ DATE:_______________

  • Tape 62 03C27 SHSpec-130 Prepchecking Data _______________
  • I attest that student has completed the requirements of Part 3 of this checksheet and does know and can apply the materials.

  • HCOB 29 Mrz 62 CCHs Again _______________
  • COURSE SUPERVISOR:_____________________________ DATE:_______________

  • Tape 62 03C29 SHSpec-126 CCHs _______________
  • The student attestation on completion of Part 3 has been Received and logged.

  • Tape 62 03C29 SHSpec-127 Q and A Period; CCHs, 3D Criss Cross _______________
  • CERTS & AWARDS OFFICER:________________________ DATE:_______________

  • Demonstrate in clay The purpose of each CCH _______________
  • PART – 4 (1963)

  • Tape 62 04C03 SHSpec-131 The Overt-Motivator Sequence _______________
  • 1. HCOB 1 Jan 63 Academy Curriculum __________

  • Tape 62 04C05 SHSpec-128 Sacredness of Cases – Self, Other and Pan-Determinism*var. Determined _______________
  • 2. HCOB 3 Jan 63 Routine 2. Important __________

  • Tape 62 04C05 SHSpec-129 As-is-ness, People who can and can‘t As-is _______________
  • 3. TAPE: 6301C08 SHSpec-226 R2-10 and R2-12 __________

  • HCOB 5 Apr 62 CCHs Auditing Attitude _______________
  • 4. TAPE: 6301C08 SHSpec-227 Case Repair __________

  • HCOB 11 Apr 62 Determining What to Run _______________
  • 5. TAPE: 6301C10 SHSpec-228 R2-12 __________

  • HCOB 12 Apr 62 CCHs, Purpose _______________
  • 6. TAPE: 6301C10 SHSpec-229 How to Audit __________

  • Tape 62 04C17 SHSpec-132 Auditing _______________
  • 7. BTB 14 Jan 63 Rings Causing Rock Slams __________

  • Tape 62 04C17 SHSpec-133 How and Why Auditing Works _______________
  • 8. TAPE: 6301C15 SHSpec-230 R2-12 Dead Horses __________

  • Tape 62 04C19 SHSpec-134 Gross Auditing Errors _______________
  • 9. TAPE: 6301C15 SHSpec-231 Nevers __________

  • Tape 62 04C19 SHSpec-135 Determining What to Run _______________
  • 10. CLAY DEMO: An incomplete list, an over listed list, a dead horse, and their effects on the pc __________

  • Tape 6204C24 Rundown on 3D Criss Cross, Part I _______________
  • 11. TAPE: 6301C15 SHSpec-233 TR 0 Lecture __________

  • Tape 6204C24 Rundown on 3D Criss Cross, Part II _______________
  • 12. HCOB 27 Jan 63 Urgent Routine 2 Simplified __________

  • Tape 6204C25 TV Demo; Checking Line Plots _______________
  • 13. CLAY DEMO: The signs of a correct item found __________

  • Tape 62 04C26 SHSpec-138 Rundown on Prepchecking, Professional Attitude _______________
  • 14. TAPE: 6302C13 SHTVD-16-237 X-Unit, Rud & Hav __________

  • Tape 62 04C26 Rundown on Routine 3; Routine 3A Criss Cross _______________
  • 15. TAPE: 6302C13 SHSpec-238 Discussion by LRH of Tape 237 __________

  • HCOB 26 Apr 62 Recommended Processes for HGC _______________
  • 16. TAPE: 6302C19 SHSpec-240 Rundown on Processes __________

  • Tape 62 05C01 SHSpec-140 ARC Breaks and Missed Withholds _______________
  • 17. TAPE: 6302C20 SHSpec-241 Talk on TV Demo – Finding RRs __________

  • HCO Info Ltr 29 Apr 62 Routine 3G (Experimental) _______________
  • 18. HCOB 20 Feb 63 Routine 2 and Routine 3 Model Session __________

  • Tape 62 05C01 Routine 3G; Experimental Preview of a Clearing Process _______________
  • 19. TAPE: 6302C21 SHSpec-242 R2 and R3 Current Auditing Rundown __________

  • Tape 62 05C02 SHTVD-4A Prepchecking (Aud: LRH) _______________
  • 20. HCOB 4 Mar 63 Urgent. Routine 2-10, 2-12, 2-12A __________

  • Tape 62 05C02 SHTVD-4B Prepchecking (Aud: LRH) _______________
  • 21. TAPE: 6303C07 SHSpec-247 When faced with the unusual do the usual __________

  • Tape 62 05C03 SHSpec-142 Craftsmanship-Fundamentals _______________
  • 22. HCOB 8 Mar 63 Use of the Big Middle Rudiments __________

  • Tape 62 05C03 SHSpec-143 Prepchecking _______________
  • 23. HCOB 10 Mar 63 Urgent. Routine 2-10, 2-12, 2-12A __________

  • HCO PL 3 May 62 Practical Auditing Skills _______________
  • 24. HCOB 14 Mar 63 Urgent. Routine 2-Routine 3, ARC/Breaks Handling of __________

  • HCOB 3 May 62R ARC Breaks Missed Withholds _______________
  • 25. HCOB 18 Mar 63 R2-R3. Important Data. Don’t Force the PC __________

  • HCOB 10 May 62 Prepchecking and Sec Checking _______________
  • 26. TAPE: 6303C20 SHTVD-18 Rudiments & Havingness Session & Short Lecture (Aud: LRH) __________

  • HCO Info Ltr 10 May 62 Routine 3GA (Experimental) _______________
  • 27. HCOB 23 Mar 63 Clear and OT __________

  • HCOB 14 May 62 Case Repair _______________
  • 28. TAPE: 6303C26 SHSpec-252 Case Repair __________

  • HCO PL 14 May 62 Training Sections _______________
  • 29. TAPE: 6303C27 SHTVD-19-254 Sec Checking With a Talk by LRH __________

  • HCO PL 14 May 62 II Training _______________
  • 30. HCOB 8 Apr 63 Urgent. Listung and Nulling __________

  • Tape 62 05C15 SHSpec-144 New Training Sections _______________
  • 31. TAPE: 6304C18 SHSpec-258 Directive Listing __________

  • Tape 62 05C15 SHSpec-145 New TRs _______________
  • 32. HCOB 25 Apr 63 Meter Reading TRs __________

  • Tape 6205C16 TV Demo; Patching Up 3D Criss Cross Cases _______________
  • 33. TAPE: 6304C30 SHSpec-261 Directive Listing __________

  • Tape 62 05C17 SHSpec-146 Auditing Errors _______________
  • 34. HCOB 15 May 63 The Time Track and Engram Running by Chains __________

  • Tape 62 05C17 SHSpec-147 Prepchecking and its Purposes _______________
  • 35. CLAY DEMO: The rule “the Time Track obeys the auditor; the Time Track does not obey the preclear.” __________

  • HCOB 21 May 62 Missed Withholds, Asking About _______________
  • 36. DRILL: Mock up a movie projector and reel of film and do the drill on page one of the above bulletin. __________

  • Tape 62 05C22 SHSpec-150 Administration of Courses _______________
  • 37. TAPE: 6305C16 SHSpec-265 The Time Track __________

  • Tape 62 05C22 SHSpec-151 Missed Withholds _______________
  • 38. TAPE: 6305C23 SHSpec-268 State of OT __________

  • HCOB 22 May 62 Model Session Change _______________
  • 39. HCOB 27 May 63 Cause of ARC Breaks __________

  • Tape 62 05C23 SHTV D-6 Check on ”What” question and Havingness Probe _______________
  • 40. CLAY DEMO:

  • Tape 62 05C23 SHTV D-7 Fish and Fumble-Checking Dirty Needles _______________
  • a. The rule “All ARC Breaks are caused by by-passed charge” (give specific example) __________

  • HCOB 23 May 62 E-Meter Reads: Prepchecking How Meters get invalidated _______________
  • b. The rule “To turn off an ARC break find and indicate the correct by-passed charge” (give specific example) __________

  • Tape 62 05C24 SHSpec-148 E-Meter Data-Instant Reads _______________
  • 41. TAPE: 6305C28 SHSpec-269 Handling ARC Breaks __________

  • Tape 62 05C24 SHSpec-149 E-Meter Data-Instant Reads II _______________
  • 42. TAPE: 6305C29 SHSpec-270 Programming Cases __________

  • Demonstrate in clay why out TRs can obscure an instant read _______________
  • 43. TAPE: 6305C30 SHSpec-271 Programming Cases Part II __________

  • HCOB 24 May 62 Q and A _______________
  • 44. HCOB 8 Jun 63 The Time Track and Engram Running by Chains Bulletin II __________

  • HCOB 25 May 62 E-Meter - Instant Reads _______________
  • 45. CLAY DEMO: The State of Case Scale __________

  • HCO PL 26 May 62 Training Drills Must Be Correct _______________
  • 46. TAPE: 6306C11 SHSpec-272 Engram Chain Running __________

  • Tape 62 05C29 SHSpec-152 Q & A Period; Goals Assessment, Havingness _______________
  • 47. TAPE: 6306C12 SHSpec-273 ARC Straightwire __________

  • Tape 62 05C29 SHSpec-153 Security Check Prepchecking _______________
  • 48. TAPE: 6306C13 SHSpec-274 Levels of Case __________

  • Tape 62 05C30 SHTVD-8A Getting Rudiments in (Aud.: LRH) _______________
  • 49. TAPE: 6306C18 SHSpec-275 Beingness __________

  • Tape 62 05C30 SHTVD-8A Getting Rudiments in _______________
  • 50. TAPE: 6306C19 SHSpec-276 Summary of Modern Auditing __________

  • Tape 62 05C31 SHSpec-154 Value of Rudiments _______________
  • 51. TAPE: 6306C20 SHSpec-277 History of Psychotherapy __________

  • Tape 62 05C31 SHSpec-155 Middle Rudiments _______________
  • 52. HCOB 24 Jun 63 Routine 3R, Engram Running by Chains __________

  • Demonstrate in clay What a Rudiment is and its purpose _______________
  • 53. TAPE: 6306C25 SHSpec-278 Routine 2H __________

  • HCO PL 1 Jun 62 Auditing – Rudiments Check Sheet _______________
  • 54. HCOB 25 Jun 63 Routine 2H, ARC Breaks by Assessment __________

  • HCOB 8 Jun 62 Rudiments Checking _______________
  • 55. TAPE: 6306C26 SHTVD-22-279 Listing Assessment for Engram Running Part I __________

  • HCOB 11 Jun 62 Prepchecking the Middle Rudiments _______________
  • 56. TAPE: 6306C27 SHTVD-23-280 Listing Assessment for Engram Running Part II __________

  • Tape 6206C12 How to Do a Goals Assessment _______________
  • 57. HCOB 1 Jul 63 Routine 3R, Preliminary Step __________

  • Tape 6206C12 SHSpec-161 More on Middle Rudiments *var. Middle Rudiments _______________
  • 58. HCOB 5 Jul 63 CCHs Rewritten __________

  • Tape 6206C12 How to Do a Goals Assessment _______________
  • 59. HCOB 5 Jul 63 All Routines, ARC Break Assessments __________

  • Tape 6206C13 TV Demo; Checking Out a Goal, Part I _______________
  • 60. TAPE: 6307C09 SHSPec-281 The Free Being __________

  • Tape 6206C13 TV Demo; Checking Out a Goal, Part II _______________
  • 61. HCOB 9 Jul 63 A Technical Summary. The Required Skills of Processing and Why __________

  • Tape 62 06C14 SHSpec-156 Future Technology _______________
  • 62. TAPE: 6307C10 SHSpec-282 Auditing Skills of R3R __________

  • Tape 62 06C14 SHSpec-157 Listing _______________
  • 63. TAPE: 6307C11 SHSpec-283 ARC Breaks __________

  • Demonstrate in clay what listing is _______________
  • 64. TAPE: 6307C16 SHSpec-285 Tips on Running R3R __________

  • HCOB 14 Jun 62 Checking Needle in Rudiments Checks _______________
  • 65. TAPE: 6307C17 SHSpec-286 Dating __________

  • HCOB 14 Jun 62 Class IIc TRs _______________
  • 66. TAPE: 6307C18 SHSpec-287 Errors in Time __________BPL 8.1.72RA Revised

  • Tape 6206C19 Do's and Don'ts of R3 _______________
  • 18.1.75 - 25 -

  • Tape 62 06C19 SHSpec-159 Q and A Period; GPMs, Release _______________
  • 67. HCOB 21 Jul 63 Co-Audit: ARC Break Process __________

  • Tape 6206C20 TV Demo; New Model Session _______________
  • 68. HCOB 22 Jul 63 Org Technical HGC Processes and Training __________

  • HCOB 23 Jun 62 Model Session Revised _______________
  • 69. CLAY DEMO: The 5 basic auditing skills __________

  • Tape 62 06C21 SHSpec-162 Model Session Revised _______________
  • 70. HCOB 22 Jul 63 You Can Be Right __________

  • Tape 62 06C21 SHSpec-163 Q and A Period; TR 4 Model Session _______________
  • 71. HCOB 23 Jul 63 Auditing Rundown, Missed Withholds __________

  • HCOB 24 Jun 62 Prepchecking _______________
  • 72. TAPE: 6307C24 SHSpec-289 ARC Breaks and the Comm Cycle __________

  • HCOB 25 Jun 62 E-Meter Standards _______________
  • 73. CLAY DEMO: What happens to the pc and bank when the Auditor cuts the comm cycle of the PC. __________

  • Tape 62 06C26 SHSpec-164 E-Meter Quality _______________
  • 74. TAPE: 6307C25 SHSpec-290 Comm Cycle in Auditing __________

  • Tape 62 06C26 SHSpec-165 Prepchecking and the Time Track _______________
  • 75. CLAY DEMO: A fractured comm cycle. __________

  • Tape 62 06C28 SHSpec-166 Rudiments _______________
  • 76. CLAY DEMO: The 5 points which indicate a process is flat, showing the pc and bank __________

  • Tape 62 06C28 SHSpec-167 Q and A Period; CCHs, Nulling Goals _______________
  • 77. BTB 26 Jul 63R Training Technology __________

  • HCOB 28 Jun 62 Dirty Needles, How to smooth out needles _______________
  • 78. HCOB 28 Jul 63 Time and the Tone Arm __________

  • HCOB 29 Jun 62 Batteries and the Mark IV E-Meter _______________
  • 79. HCOB 29 Jul 63 Scientology Review __________

  • HCOB 29 Jun 62 How to Acknowledge _______________
  • 80. HCOB 4 Aug 63 All Routines, E-Meter Errors, Comm Cycle Error __________

  • HCOB 30 Jun 62 ARC Process _______________
  • 81. CLAY DEMO: The rule “Tone Arm action of any kind without any significance of what’s behind it will take a pc to OT eventally”. __________

  • HCOB 2 Jul 62 Repetitive Rudiments. How to get the Rudiments in _______________
  • 82. TAPE: 6308C06 SHSpec-291 Auditing Comm Cycles __________

  • HCOB 3 Jul 62 Repetitive Prepchecking _______________
  • 83. CLAY DEMO: The auditing comm cycle __________

  • HCOB 3 Jul 62 Acknowledgements _______________
  • 84. TAPE: 6308C07 SHSpec-292 R2H Fundamentals __________

  • HCOB 4 Jul 62 Bulletin Changes _______________
  • 85. TAPE: 6308C08 SHSpec-293 R2H Assessment __________

  • HCOB 4 Jul 62 Coachless Training. Use of a Doll _______________
  • 86. HCOB 9 Aug 63 Definition of Release __________

  • Tape 62 07C10 SHSpec-168 Repetitive Rudiments and Repetitive Prepchecking. Part I _______________
  • 87. HCOB 11 Aug 63 ARC Break Assessments __________

  • Tape 62 07C10 SHSpec-169 Repetitive Rudiments and Repetitive Prepchecking. Part II _______________
  • 88. HCOB 14 Aug 63 Lecture Graphs __________

  • Tape 62 07C12 SHSpec-174 Meter Reading _______________
  • 89. TAPE: 6308C14 SHSpec-294 Auditing Tips __________

  • Tape 62 07C12 SHSpec-175 Meter Training _______________
  • 90. TAPE: 6308C15 SHSpec-295 The Tone Arm __________

  • BTB 12 Jul 62 Motivatorish Cases _______________
  • 91. CLAY DEMO: What the Tone Arm registers. __________

  • Demonstrate in clay a Motivator _______________
  • 92. HCOB 19 Aug 63 How to do an ARC Break Assessment __________

  • HCO PL 14 Jul 62 Auditing Allowed _______________
  • 93. TAPE: 6308C20 SHSpec-296 The Itsa Line __________

  • HCO PL 15 Jul 62 Goals Prepcheck Form – Routine 3GA _______________
  • 94. CLAY DEMO: The Itsa Line __________

  • Tape 62 07C17 SHSpec-170 E-Meter Reads and ARC Breaks _______________
  • 95. HCOB 20 Aug 63 R3R-R3N The Preclears Postulate __________

  • Tape 62 07C17 SHSpec-171 Anatomy of ARC Breaks _______________
  • 96. TAPE: 6308C21 SHSpec-297 The Itsa Line (Cont’d) __________

  • Demonstrate in clay an ARC/B _______________
  • 97. TAPE: 6308C22 SHSpec-298 Project 80 __________

  • HCO PL 17 Jul 62 Routine 3GA – HCO WW R-3GA Form 1 – Listing Prepcheck _______________
  • 98. HCOB 22 Aug 63 Project 80, The Itsa Line and Tone Arm __________

  • Tape 62 07C19 SHSpec-172 The E-Meter _______________
  • 99. TAPE: 6308C27 SHSpec-299 Rightness & Wrongness __________

  • Tape 62 07C19 SHSpec-173 Q and A Period; Goals Lists, Field Auditors _______________
  • 100. TAPE: 6308C29 SHSpec-300 The TA and the Service Facsimile __________

  • HCOB 21 Jul 62 Urgent. Instant Reads _______________
  • 101. TAPE: 6308C29 SHSpec-301 The Service Facsimile __________

  • Demonstrate in clay an instant read _______________
  • 102. HCOB 1 Sep 63 Routind 3SC __________

  • Tape 6207C24 Routine 3GA, Part I _______________
  • 103. TAPE: 6309C04 SHSpec-302 How to Find a Service Facsimile __________

  • Tape 6207C24 Routine 3GA, Part II _______________
  • 104. TAPE: 6309C08 SHSpec-320A R3SC __________BPL 8.1.72RA Revised

  • Tape 6207C26 Routine 3GA Data _______________
  • 18.1.75 - 26 -

  • Tape 62 07C26 SHSpec-179 Prepchecking with Mid Rud Buttons _______________
  • 105. CLAY DEMO: The definition of a Service Facsimile __________

  • HCOB 30 Jul 62 A Smooth 25 Hour Intensive _______________
  • 106. TAPE: 6309C05 SHSpec-303 Service Fac Assessment __________

  • HCOB 1 Aug 62 Routine 3GA Goals – Nulling by Mid Ruds ­_______________
  • 107. HCOB 6 Sep 63 Instructing in Scientology Auditing __________

  • HCOB 2 Aug 62 CCH Answers _______________
  • 108. HCOB 9 Sep 63 Repetitive Rudiments and Repetitive Prepchecking __________

  • Tape 6208C07 Routine 3GA Data on Goals, Part I _______________
  • 109. TAPE: 6309C10 SHSpec-304 Destumulation of a Case __________

  • Tape 6208C07 Routine 3GA Data on Goals, Part II _______________
  • 110. CLAY DEMO: Destimulation __________

  • HCOB 7 Aug 62 Running CCH‘s _______________
  • 111. TAPE: 6309C11 SHSpec-306 Service Facs and GPMs __________

  • Tape 6208C08 TV Demo; Routine 3GA, Nulling Goals _______________
  • 112. TAPE: 6309C12 SHSpec-305 Service Facs __________

  • Tape 62 08C09 SHSpec-182 Clearing _______________
  • 113. BTB 12 Sep 63R CCHs Data __________

  • Tape 6208C09 Goals Listing _______________
  • 114. TAPE: 6309C17 SHSpec-307 What You Are Auditing __________

  • HCOB 10 Aug 62 How it feels to go Clear _______________
  • 115. TAPE: 6309C18 SHSpec-308 St.Hill Service Fac Handling __________

  • HCOB 13 Aug 62 Rock Slams and Dirty Needles _______________
  • 116. HCOB 22 Sep 63 Prepcheck Buttons __________

  • HCOB 13 Aug 62 Missed Withhold Handling _______________
  • 117. HCOB 23 Sep 63 Tape Coverage of New Technology __________

  • HCOB 13 Aug 62 Order of Prepcheck Buttons _______________
  • 118. TAPE: 6309C25 SHSpec-310 Summary II Scientology __________

  • Tape 62 08C14 SHSpec-184 Rock Slams and Dirty Needles _______________
  • 119. HCOB 25 Sep 63 Adequate Tone Arm Action __________

  • Tape 62 08C14 SHSpec-185 World Clearing Program _______________
  • 120. TAPE: 6309C26 SHSpec-311 Summary III About Level IV Auditing __________

  • Tape 6208C15 TV Demo; 3GA Dynamic Assessment _______________
  • 121. HCOB 1 Oct 63 How to Get Tone Arm Action __________

  • Tape 6208C16 3GA Dynamic Assessment _______________
  • 122. DEMO: The rule “The less active the TA the more over-restimulation is present (though restim can also be absent)” __________

  • HCOB 21 Aug 62 3GA Line Wording _______________
  • 123. HCOB 2 Oct 63 Experimental Process Withdrawn __________

  • Tape 6208C21 Finding Goals by Dynamic Assessment _______________
  • 124. HCOB 8 Oct 63 How to Get TA. Analysing Auditing __________

  • Tape 62 08C21 SHSpec-188 Basics of Auditing _______________
  • 125. TAPE: 6310C15 SHSpec-312 Essentials of Auditing __________

  • HCOB 22 Aug 62 3GA Dynamic Assessment by Rock Slam _______________
  • 126. TAPE: 6310C16 SHSpec-313 The Itsa Maker Line __________

  • Tape 6208C22 TV Demo; Dynamic and Item Assessment _______________
  • 127. HCOB 16 Oct 63 R3SC Slow Assessment __________

  • HCOB 30 Aug 62 Order of Prepcheck Buttons _______________
  • 128. TAPE: 6310C17 SHSpec-314 Levels of Auditing __________

  • HCOB 31 Aug 62 3GA Expanded Line Wording _______________
  • 129. BTB 17 Oct 63R R2C Slow Assessment by Dynamics Directions for Use Of __________

  • HCOB 31 Aug 62 3GA Dynamic Assessment by Rock Slam _______________
  • 130. BTB 17 Oct 63 R2C Slow Assessment by Dynamics __________

  • h HCOB 1 Sep 62 3GA Dynamic Assessment by Rock Slam _______________
  • 131. TAPE: 6310C22 SHSpec-316 The Integration of Auditing __________

  • HCOB 2 Sep 62 Account of Congress Goal _______________
  • 132. BTB 31 Oct 63R R2C Slow Assessment by Dynamics __________

  • HCOB 3 Sep 62 3GA Dynamic Assessment by Rock Slam _______________
  • 133. TAPE: 6311C05 SHSpec-321 Three Zones of Auditing __________

  • BTB 6 Sep 62 CCH‘s More Information _______________
  • 134. CLAY DEMO: Basic Auditing, technique and case analysis. __________

  • HCOB 8 Sep 62 3GA To Be Goals Line Listing _______________
  • 135. TAPE: 6311C07 SHSpec-322 Relationship of Training to OT __________

  • HCOB 12 Sep 62 Security Checks Again _______________
  • 136. HCOB 25 Nov 63 Dirty Needles __________

  • HCO PL 12 Sep 62 III Authorized Processes _______________
  • 137. DEMO: How a dirty needle is caused by the Auditor __________

  • Tape 62 09C18 SHSpec-189 Directing PCs Attention _______________
  • 138. HCOB 26 Nov 63 Basic Auditing, Technique, Case Analysis __________

  • Tape 6209C18 3GA Dynamic Assessment by Rock Slam _______________
  • 139. TAPE: 6311C27 SHTVD-25 SHSpec-330 Auditing Demo and Comments by LRH __________

  • HCOB 19 Sep 62 3GA Tips on Dynamic Assessment _______________
  • 140. TAPE: 6311C28 SHSpec-324 Seven Classifications __________

  • Tape 6209C19 TV Demo; Tiger Drill _______________
  • 141. TAPE: 6312C03 SHSpec-325 Certifications and Classifications __________

  • Tape 62 09C20 SHSpec-191 Listing Lines _______________
  • 142. TAPE: 6312C04 SHTVD-24-326 Basic Auditing __________

  • Tape 62 09C20 SHSpec-192 Geriatrics _______________
  • 143. TAPE: 6312C05 SHSpec-327 Basic Auditing __________

  • HCOB 23 Sep 62 A 40-Line List on a Doingness Goal _______________
  • 144. TAPE: 6312C10 SHSpec-328 Scientology 0 __________

  • Tape 62 09C25 SHSpec-193 Current Trends _______________
  • 145. TAPE: 6312C12 SHSpec-329 Summary of OT Processes __________

  • HCOB 27 Sep 62 Problems Intensive Use _______________
  • 146. HCOB 14 Dec 63 Case Analysis Health Research __________

  • Tape 6209C25 3GA Assessment _______________
  • 147. HCOB 28 Dec 63 Indicators Part One: Good Indicators __________

  • Tape 6209C27 3GA Listing, Part I _______________
  • 148. CLAY DEMO: “Indicators”. __________

  • Tape 6209C27 3GA Listing, Part II _______________
  • 149. TAPE: 6312C31 SHSpec-1 Indicators __________

  • HCOB 27 Sep 62 Dream Come True (Cancelled, see HCOB 2 Oct 62)
  • END OF PART 4
  • HCO PL 27 Sep 62 Valid Processes _______________
  • The student is routed to Qual to attest to Part 4 of the Class V Checksheet.

  • HCOB 1 Oct 62 3GA Listing by Tiger Buttons _______________
  • I attest that I have completed Part 4 of this Checksheet, that I have used full study tech throughout, that I have no misunderstoods and know and can apply the materials:

  • HCOB 2 Oct 62 When You Need Reassurance _______________
  • STUDENT:_____________________________ DATE:_______________

  • Tape 6210C02 3GA Listing by Tiger Buttons, Part I _______________
  • I attest that student has completed the requirements of Part 4 of this Checksheet and does know and can apply the materials:

  • Tape 6210C02 3GA Listing by Tiger Buttons, Part II _______________
  • COURSE SUPERVISOR:_____________________________DATE:_______________

  • HCOB 3 Oct 62 Tiger Drilling _______________
  • The Student attestation on completion of Part 4 has been Received and logged.

  • Tape 6210C03 SHTVD-15A Prepchecking a Goal. Part I _______________
  • CERTS & AWARDS OFFICER:________________________DATE:_______________

  • Tape 6210C03 SHTVD-15B Prepchecking a Goal. Part II _______________
  • PART 5 – (1964 – 1965)

  • Tape 6210C04 SHSpec-198 Modern Security Checking _______________
  • 1. TAPE: 6401C07 SHSpec-2 Good Indicators __________

  • Tape 6210C04 Making a Goal Fire _______________
  • 2. TAPE: 6401C09 SHSpec-3 Bad Indicators __________

  • HCOB 6 Oct 62 What an Auditor is _______________
  • 3. CLAY DEMO: “Good Indicators” & “Bad Indicators” __________

  • HCO PL 8 Oct 62 HGC Clearing _______________
  • 4. HCOB 21 Jan 64 Meter Level Warning __________

  • Tape 6210C09 SHSpec-200 Future Org Trends _______________
  • 5. BOOK: The Book of Case Remedies __________

  • Tape 6210C09 SHSpec-201 Instructors Bug-Bear _______________
  • 6. TAPE: 6402C04 SHSpec-4 Auditor Self Criticism __________

  • Tape 6210C11 3GA Goals Finding, Part I _______________
  • 7. TAPE: 6402C06 SHSpec-5 Comm Cycle in Auditing __________

  • Tape 6210C11 3GA Goals Finding, Part II _______________
  • 8. TAPE: 6402C25 SHSpec-6 What Auditing Is and What It Isn’t __________

  • HCOB 13 Oct 62 Processes _______________
  • 9. CLAY DEMO: The difference between destimulation and erasure. __________

  • HCOB 15 Oct 62 Goal Finder’s Model Session _______________
  • 10. HCOB 1 Mar 64 Meter Reads, Size Of __________

  • HCOB 16 Oct 62 Routine 3GA – Listing _______________
  • 11. DEMO: Why you only accept big reads at Level V & VI __________

  • HCOB 17 Oct 62 Auditor Failure to Understand _______________
  • 12. TAPE: 6403C03 SHSpec-7 Auditing and Assessment __________

  • HCOB 18 Oct 62 3GA Listing by Prehav _______________
  • 13. HCOB 4 Mar 64 Class II Model Session __________

  • HCO PL 19 Oct 62 R3GA, HCO WW Form G3, Revised, Fast Goals Check _______________
  • 14. TAPE: 6403C05 SHSpec-8 Case Analysis – Healing __________

  • Tape 6210C23 3GA Criss Cross _______________
  • 15. TAPE: 6403C10 SHSpec-9 Summary of Lower Levels __________

  • Tape 6210C23 3GA Criss Cross; Following the Rock Slam _______________
  • 16. HCOB 15 Mar 64 Overwhelming the PC __________

  • Tape 6210C25 3GA Criss Cross Data _______________
  • 17. HCOB 15 Mar 64 Everything Reading __________

  • Tape 6210C25 3GA Criss Cross, Secondary Prehav Scale _______________
  • 18. TAPE: 6403C17 SHSpec-11 The Road to Perfection __________

  • HCOB 29 Oct 62 Pre-Clearing Intensive _______________
  • 19. TAPE: 6403C19 SHSpec-12 Flattening a Process __________

  • Tape 6210C30 SHSpec-204 Pre-Hav Scales and Lists _______________
  • 20. CLAY DEMO: Why a process is flattened __________

  • Tape 6210C30 Listing Goals _______________
  • 21. TAPE: 6403C24 SHSpec-13 International City __________

  • Tape 6211C01 SHSpec-206 The Missed Missed Withhold _______________
  • 22. HCOB 7 Apr 64 All Levels Q & A __________

  • Demonstrate in clay a missed missed Withhold and it‘s manifestation(?) on p.c. _______________
  • 23. CLAY DEMO: The new definition of Q & A __________

  • Tape 6211C01 SHSpec-207 The Road to Truth _______________
  • 24. HCOB 10 Apr 64 All Levels Auditing Skills __________

  • HCOB 7 Nov 62 Roll your own Pre-Hav _______________
  • 25. TAPE: 6404C10 SHSpec 14 How to Manage a Course __________

  • Tape 6211C13 SHSpec-210 The Difficult Case _______________
  • 26. TAPE: 6404C14 SHSpec-15 The Classification- Gradation-Programme __________

  • Tape 6211C15 SHSpec-211 Entrance to Cases _______________
  • 27. TAPE: 6404C16 SHSpec-16 Auditing by Lists __________

  • Tape 6211C15 SHSpec-212 Terminals _______________
  • 28. HCOB 20 Apr 64 Model Session Level III-IV __________

  • Tape 6211C15 SHSpec-213 Clearing Technology _______________
  • 29. TAPE: 6404C21 SHSpec-17 Problems and Solutions __________

  • Tape 6211C20 Layout of the GPM _______________
  • 30. TAPE: 6404C28 SHSpec-18 Wisdom as an Auditor __________

  • Tape 6211C20 SHSpec-215 Fundamentals of Auditing _______________
  • 31. TAPE: 6404C30 SHSpec-19 Effectiveness of Processing __________

  • Tape 6211C22 SHSpec-216 Q and A Period; Tiger Drilling, Clears _______________
  • 32. TAPE: 6405C19 SHSpec-20 The Preclear and Getting Auditing to Work __________

  • Tape 6211C22 SHSpec-217 Q and A Period; District Offices, Co-audits _______________
  • 33. HCOB 19 May 64 Class II Model Session __________

  • HCOB 23 Nov 62 Urgent. Routine Two-Twelve _______________
  • 34. TAPE: 6406C09 SHSpec-22 Cycle of Action. Its Inter- pretation on the E-Meter __________

  • HCOB 24 Nov 62 Routine 2-12. List One _______________
  • 35. TAPE: 6406C16 SHSpec-23 Communication, Overts and Responsibility __________

  • Tape 6211C27 SHSpec-218 Routine 2-12 _______________
  • 36. CLAY DEMO: What happens to a pc’s Communication and responsibility when he has overts __________

  • Tape 6211C27 SHSpec-219 Routine 2-12 _______________
  • 37. TAPE: 6406C18 SHSpec-24 Studying Introduction __________

  • HCOB 28 Nov 62 R2-12. Practical Drills _______________
  • 38. HCOB 29 Jun 64 Central Org & Field Auditor Targets __________

  • Tape 6211C29 SHSpec-220 R 2-12 Theory and Practice. Part I _______________
  • 39. TAPE: 6406C30 SHSpec-25 Cause Level, OT and the Public __________

  • Tape 6211C29 SHSpec-221 R 2-12 Theory and Practice. Part II _______________
  • 40. HCOB 30 Jun 64 Field Auditor Targets __________

  • HCOB 29 Nov 62 R 2-12. List One – Issue Two _______________
  • 41. TAPE: 6407C02 SHSpec-26 O/W Modernized and Reviewed __________

  • HCOB 4 Dec 62 Routine 2-12. List One – Issue III _______________
  • 42. TAPE: 6407C07 SHSpec-27 Dissemination __________

  • HCOB 8 Dec 62 Training X Unit _______________
  • 43. HCOB 7 Jul 64 Justifications __________

  • HCOB 9 Dec 62 Routine 2-12. List One _______________
  • 44. HCOB 8 Jul 64 More Justifications __________

  • Tape 6212C11 SHSpec-222 R2-12 Data _______________
  • 45. TAPE: 6407C09 SHSpec-28 Studying, Data Assimilation __________

  • Tape 6212C11 SHSpec-223 Phantom RS _______________
  • 46. HCOB 10 Jul 64 Overts – Order of Effectiveness in Processing __________

  • Tape 6212C13 SHSpec-224 R2-12 Data. Needle Behaviour _______________
  • 47. CLAY DEMO: The overt-motivator sequence __________

  • Tape 6212C13 SHSpec-225 Repair of R2-12 Clean Needle _______________
  • 48. HCOB 12 Jul 54 More on O/Ws __________

  • HCOB 15 Dec 62 Urgent R2-12. The Fatal Error _______________
  • 49. TAPE: 6407C15 SHSpec-30 Organizational Operation __________

  • HCOB 30 Dec 62 Routines 2-12 and 2-10 _______________
  • 50. HCOB 24 Jul 64 TA Counters, Use Of __________

    I attest that I have completed Part 2 of this checksheet, that I have used full study tech throughout, that I have no misunderstood and know and can apply the materials:

    51. TAPE: 6407C28 SHSpec-31 Campaign to Handle Psychosomatic Ills __________

    STUDENT: ___________________________ DATE: _______________

    52. HCOB 29 Jul 64 Good Indicators at Lower Levels __________

    I attest that student has completed the requirements of Part 1 of this checksheet and does know and can apply the materials:

    53. TAPE: 6407C30 SHSpec-32 Psychosomatic – Its Meaning in Scientology __________

    COURSE SUPERVISOR: ___________________ DATE: _______________

    54. TAPE: 6408C04 SHSpec-33 A Summary of Study __________

    Student has passed a metered check for misunderstoods on these materials and has passed a written examination on the key materials 100 %:

    55. TAPE: 6408C06 SHSpec-34 Study – Gradients and Nomenclature __________

    STUDENT EXAMINER:____________________ DATE: ________________

    56. TAPE: 6408C11 SHSpec-35 Evaluation of Information __________


    57. TAPE: 6408C13 SHSpec-36 Study and Education __________

    PART – 3 (1963 - 1964)

    58. HCOB 14 Aug 64 Prepcheck Buttons __________

    1. HCOB 1 Jan 63 Academy Curriculum _______________

    59. HCOB 14 Aug 64 Model Session Levels III to VI __________

  • HCOB 3 Jan 63 Routine 2. Important _______________
  • 60. HCOB 17 Aug 64 Clay Table Work in Training and Processing __________

  • Tape 6301C08 SHSpec-225 R2- 10 and R2 - 12 _______________
  • 61. HCOB 24 Aug 64 Session Must-Nots __________

  • Tape 6301C08 SHSpec-227 Case Repair _______________
  • 62. CLAY DEMO: The session must-nots. __________

  • Tape 6301C10 SHSpec-228 R2 - 12 _______________
  • 63. TAPE: 6409C01 SHSpec-37 The PE Course __________

  • Tape 6301C10 SHSpec-229 How to Audit _______________
  • 64. TAPE: 6409C03 SHSpec-38 Clearing – What It Is __________

  • HCOB 14 Jan 63 Rings Causing Rock Slams _______________
  • 65. HCOB 7 Sep 64 PTPs, Overts and ARC Bs __________

  • HCOB 14 Jan 63 Definition of Release (Cancelled by HCOB 9.8.63) _______________
  • 66. HCOB 7 Sep 64 Clay Table Levels __________

  • Tape 6301C15 SHSpec-230 R 2-12 Dead Horses _______________
  • 67. HCOB 8 Sep 64 Overts, What Lies Behind Them __________

  • Tape 6301C15 SHSpec-231 R 2-12 Nevers _______________
  • 68. CLAY DEMO: The cycle of an overt. __________

  • Tape 6301C16 TR 0 Demonstration _______________
  • 69. HCOB 9 Sep 64 Clay Table Healing __________

  • Tape 6301C16 SHSpec-233 TR 0 Lecture _______________
  • 70. HCOB 9 Sep 64 Clay Table Clearing __________

  • Demonstrate in Clay An incomplete list, an overlisted list, a dead horse and their effects on the pc _______________
  • 71. HCOB 12 Sep 64 Clay Table, More Goofs __________

  • HCOB 27 Jan 63 Urgent Routine 2. Simplified _______________
  • 72. TAPE: 6409C15 SHSpec-39 Scientology and Tradition __________

  • HCOB 1 Feb 63 Routine 3 Urgent-Urgent-Urgent _______________
  • 73. TAPE: 6409C22 SHSpec-40 A Review of Study __________

  • Tape 6302C06 Instructors Conference _______________
  • 74. CLAY DEMO: Why a student gives up studying __________

  • Tape 630207 R-3 MX, Part I _______________
  • 75. HCOB 27 Sep 64 Clay Table Clearing __________

  • Tape 630207 R-3 MX, Part II _______________
  • 76. TAPE: 6409C29 SHSpec-41 Gradients __________

  • HCOB 11 Feb 63 Current Auditing _______________
  • 77. TAPE: 6410C13 SHSpec-42 Cycles of Action __________

  • Tape 630212 Routine 3M _______________
  • 78. HCOB 17 Oct 64 Getting the PC Sessionable __________

  • Tape 6302C13 SHTVD-16-237 X-Unit, Rud & Hav _______________
  • 79. DEMO: The action of educating the pc. __________

  • Tape 6302C13 SHSpec-238 Discussion by LRH of Tape 237 _______________
  • 80. HCOB 17 Oct 64 Clearing – Why It Works __________

  • Tape 630214 Routine 3M Data _______________
  • 81. HCOB 17 Oct 64 Clay Table Data __________

  • HCOB 15 Feb 63 R2-R3 Listing Rules _______________
  • 82. TAPE: 6410C20 SHSpec-43 Levels – The Reason for them __________

  • Tape 6302C19 SHSpec-240 Rundown on Processes _______________
  • 83. TAPE: 6410C27 SHSpec-44 The Failed Case __________

  • Tape 6302C20 SHSpec-241 Talk on TV Demo - Finding RR‘s _______________
  • 84. HCOB 1 Nov 64 More Clay Table Clearing Goofs __________

  • Tape 6302C20 Talk on TV Demo; Finding RRs _______________
  • 85. TAPE: 6411C03 SHSpec-45 Programmes __________

  • HCOB 20 Feb 63 Routine 2 and Routine 3 Model Session _______________
  • 86. HCOB 6 Nov 64 Styles of Auditing __________

  • HCO PL 21 Feb 63 Goals Check _______________
  • 87. DEMO: Each style of Auditing __________

  • Tape 6302C21 SHSpec-242 R2 and R3 Current Auditing Rundown _______________
  • 88. TAPE: 6411C10 SHSpec-46 PTPs, Overts & ARC Breaks __________

  • HCOB 22 Feb 63 Routine 3N Rundown by Steps _______________
  • 89. CLAY DEMO: An overt, a PTP, an ARC/B and their effects on a case if not handled. __________

  • HCOB 25 Feb 63 R2-R3 _______________
  • 90. HCOB 16 Nov 64 Clay Table Label Goofs __________

  • Tape 6302C26 R3M; Current Rundown by Steps _______________
  • 91. TAPE: 6411C17 SHSpec-47 Styles of Auditing __________

  • Tape 6302C27 TV Demo; Case Repair _______________
  • 92. HCOB 10 Dec 64 Listen Style Auditing __________

  • Tape 6302C28 Goals Problems Mass _______________
  • 93. HCOB 11 Dec 64 Scientology “0” Processes __________

  • HCOB 4 Mar 63 Urgent. Routine 2-10, 2-12, 2-12A _______________
  • 94. TAPE: 6412C15 SHSpec-49 Communication – a Gradient on Duplication __________

  • Tape 6303C05 R2 and R3; Urgent Data _______________
  • 95. HCOB 26 Dec 64 Scientolgy “0A” Process __________

  • HCOB 6 Mar 63 Correction to HCOB of February 22, 1963 _______________
  • 96. TAPE: 6503C02 SHSpec-53 Technology and Hidden Standards __________

  • Tape 6303C07 SHSpec-247 When faced with the Unusual do the Usual _______________
  • 97. CLAY DEMO: A hidden standard __________

  • HCOB 8 Mar 63 Use of the Big Middle Rudiments _______________
  • 98. BTB 4 Mar 65R Level “0” Materials __________

  • HCOB 9 Mar 63 Routine 2 and 3M _______________
  • 99. HCOB 5 Mar 65 Book of Case Remedies, Application of Tech __________

  • HCOB 10 Mar 63 Urgent. Routine 2-10, 2-12, 2-12A _______________
  • 100. TAPE: 6503C09 SHSpec-54 The New Organization Structure __________

  • HCOB 13 Mar 63 II The End of a GPM _______________
  • 101. HCOB 10 Mar 65 Words, Misunderstood Goofs __________

  • HCOB 14 Mar 63 Urgent. Routine 2 - Routine 3, ARC Breaks Handling of _______________
  • 102. CLAY DEMO: What happens when a person gets a misunderstood word. __________

  • HCOB 17 Mar 63 R2-R3 Corrections _______________
  • 103. TAPE: 6503C16 SHSpec-55 The Progress and Future of Scientology __________

  • HCOB 18 Mar 63 R2-R3. Important Data. Don‘t Force the PC _______________
  • 104. HCOB 23 Mar 65 Level “0” Materials __________

  • Tape 6303C19 R3M; How to Find Goals _______________
  • 105. HCOB 29 Mar 65 All Levels – ARC Breaks __________

  • Tape 6303C20 SHTVD-18 Rudiments and Havingness Session and Short Lecture (Aud.: LRH) _______________
  • 106. TAPE: 6503C30 SHSpec-56 ARC Breaks and Generalities __________

  • Tape 6303C21 R2G Series _______________
  • 107. CLAY DEMO: A generality and what that has to do with an ARC Break __________

  • HCOB 23 Mar 63 Clear & OT _______________
  • 108. HCOB 2 Apr 65 The Road to Clear __________

  • Tape 6303C26 SHSpec-252 Case Repair _______________
  • 109. HCOB 4 Apr 65 ARC Breaks and Missed Withholds __________

  • Tape 6303C27 SHTVD-19-254 Sec Checking with Comments by LRH _______________
  • 110. DEMO: The full handling of a “withholdy pc that ARC Breaks a lot.” __________

  • Tape 6303C28 The GPM _______________
  • 111. HCOB 5 Apr 65 A Conditions Test Process __________

  • HCOB 29 Mar 63 Summary of Security Checking _______________
  • 112. HCOB 7 Apr 65 Premature Acknowledgements __________

  • HCOB 30 Mar 63 Routine 3M Simplyfied _______________
  • 113. DEMO: Premature Acknowledgements and its effects __________

  • Tape 6304C02 GPM Items _______________
  • 114. TAPE: 6504C13 SHSpec-58 The Lowest Levels __________

  • Tape 6304C04 Anatomy of the GPM _______________
  • 115. HCOB 18 Apr 65 How to Apply Processing __________

  • HCOB 6 Apr 63 R3M2 What You Are Trying To Do In Clearing _______________
  • 116. TAPE: 6504C27 SHSpec-59 Awareness Levels __________

  • HCOB 8 Apr 63 Urgent. Listing and Nulling _______________
  • 117. HCOB 27 Apr 65 Clay Table Healing Goof __________

  • HCOB 8 Apr 63 Routine 3M2 Corrected Line Plots _______________
  • 118. HCOB 5 May 65 More on Application of Scientology to Children __________

  • Tape 6304C16 Top of the GPM _______________
  • 119. TAPE: 6505C11 SHSpec-60 ARC Breaks and PTPs, The Differentiation __________

  • HCOB 17 Apr 63 R3-M2 Re-Do Goals Found On This Pattern _______________
  • 120. CLAY DEMO: What would happen if you ran a pc on an ARC Brk when it’s actually a PTP __________

  • HCOB 18 Apr 63 Routine 3M2 Directive Listing _______________
  • 121. TAPE: 6505C18 SHSpec-61 Organization and Ethics __________

  • Tape 6304C18 SHSpec-258 Directive Listing _______________
  • 122. TAPE: 6505C25 SHSpec-62 The Five Conditions __________

  • Tape 6304C20 PAC-1 Clearing; What Clearing Is _______________
  • 123. HCOB 4 Jun 65 Class II Model Session __________

  • Tape 6304C20 PAC-2 Clearing; Basic Purpose _______________
  • 124. TAPE: 6506C08 SHSpec-63 Handling the PTS __________

  • HCOB 23 Apr 63 Routine 3M2 Handling The GPM _______________
  • 125. HCOB 18 Jun 65 Clear and OT Behaviour __________

  • Tape 6304C23 Goals _______________
  • 126. HCOB 28 Jun 65 Releases, Different Kinds __________

  • HCOB 24 Apr 63 Routine 3M2 Tips _______________
  • 127. TAPE: 6506C29 SHSpec-64 The Well-Rounded Auditor __________

  • Tape 6304C25 Finding Goals _______________
  • 128. HCOB 30 Jun 65 Release, Rehabilitation Of __________

  • HCOB 25 Apr 63 Meter Reading TR‘s _______________
  • 129. HCOB 12 Jul 65 States of BeingAttained by Processing__________

  • HCOB 28 Apr 63 Routine 3 An Actual Line Plot _______________
  • 130. HCOB 21 Jul 65 Release Rehabilitation __________

  • HCOB 29 Apr 63 Routine 3 Directive Listing – Listing Liabilities _______________
  • 131. DEMO:

  • Tape 6304C30 SHSpec-261 Directive Listing (Pattern of the GPM) _______________
  • a. The definition of release __________

  • HCOB 30 Apr 63 Routine 3 _______________
  • b. 1965 Rehab Procedure __________

  • Tape 6305C02 Running the GPM _______________
  • 132. TAPE: 6507C27 SHSpec-65 Stages of Release __________

  • HCOB 4 May 63 Routine 3 An Actual Line Plot No. 2 _______________
  • 133. HCOB 2 Aug 65 Release Goofs __________

  • HCOB 5 May 63 Routine 3, R3 Stable Data _______________
  • 134. HCOB 3 Aug 65 Auditing Goofs–Blowdown Interruption __________

  • HCOB 8 May 63 The Nature Of Formation of the GPM _______________
  • 135. HCOB 5 Aug 65 Release Stages __________

  • HCOB 11 May 63 Routine 3 Heaven _______________
  • 136. HCOB 6 Aug 65 Qualifications Technical Actions __________

  • HCOB 12 May 63 Routine 3 RI Form _______________
  • 137. HCOB 19 Aug 65 Model Session Revised __________

  • HCOB 13 May 63 Routine 3 Routine 3N Directive Listing with New Routine 3 Model Session _______________
  • 138. HCOB 23 Aug 65 Abbreviations and Symbols of Dianetics and Scientology __________

  • Tape 6305C14 Implant GPMs _______________
  • 139. TAPE: 6509C09 SHSpec-66 Classification and Gradation __________

  • HCOB 15 May 63 The Time Track and Engram Running by Chains _______________
  • 140. TAPE: 6509C21 SHSpec-67 Out Tech __________

  • Tape 6305C15 TV Demo; Blocking Out and Dating Incidents _______________
  • 141. HCOB 21 Sep 65 Qual Tech Actions __________

  • Tape 6305C16 SHSpec-265 The Time Track _______________
  • 142. CLAY DEMO: The five GAEs __________

  • HCOB 20 May 63 Routine 3N Proper Programming _______________
  • 143. HCOB 22 Sep 65 Release Gradation – New Levels of Release __________

  • Tape 6305C21 The Helatrobus Implants _______________
  • 144. HCOB 27 Sep 65 Release Gradation – Additional Data __________

  • HCOB 21 May 63 Inquisitive TR _______________
  • 145. HCOB 29 Sep 65 Cyclical and Non-Cyclical Process Conclusions __________

  • Tape 6305C22 TV Demo; Engram Running – Helatrobus Implant Goal _______________
  • 146. DEMO: How to end a cyclical and non-cyclical process. __________

  • Tape 6305C23 SHSpec-268 State of OT _______________
  • 147. HCOB 29 Sep 65 The Continuing Overt Act __________

  • HCOB 26 May 63 Routine 3 Line Plot _______________
  • 148. HCOB 31 Sep 65 Out Tech and How to Get It In __________

  • HCOB 26 May 63 Line Plot First Series Corrected _______________
  • 149. BOOK: A New Slant on Life __________

  • HCOB 27 May 63 Cause of ARC Breaks _______________
  • 150. HCOB 1 Oct 65 Mutter TR __________

  • Tape 6305C28 SHSpec-269 Handling ARC Breaks _______________
  • 151. TAPE: 6510C14 SHSpec-68 Briefing to Review Auditors __________

  • Tape 6305C29 SHSpec-270 Programming Cases _______________
  • 152. CLAY DEMO: The purpose of S & D __________

  • Tape 6305C30 SHSpec-271 Programming Cases, Part II _______________
  • 153. BTB 21 Oct 65R Release Rehabilitation __________

  • HCOB 1 Jun 63 Routine 2 New Processes _______________
  • 154. DEMO: The procedure for rehabbing a Grade __________

  • HCOB 4 Jun 63 Checking out the Joburg _______________
  • 155. HCOB 5 Nov 65 Five Way Bracket on Help __________

  • HCOB 8 Jun 63 The Time Track and Engram Running by Chains. Bulletin II _______________
  • 156. HCOB 5 Nov 65 Lecture Graphs __________

  • Tape 6306C11 SHSpec-272 Engram Chain Running _______________
  • 157. HCOB 7 Nov 65 Release Rehab Error __________

  • Tape 6306C12 SHSpec-273 ARC Straightwire _______________
  • 158. HCOB 8 Nov 65 Suppressives and Hidden Standards __________

  • Tape 6306C13 SHSpec-274 Levels of Case _______________
  • 159. CLAY DEMO: Why finding a suppressive on a pc’s case will lead you to a chronic problem on the case. __________

  • HCOB 13 Jun 63 New Training Drills _______________
  • 160. HCOB 14 Nov 65 Clearing Commands __________

  • Tape 6306C18 SHSpec-275 Beingnesses _______________
  • 161. HCOB 16 Nov 65 E-Meter Sensitivity Setting __________

  • Tape 6306C19 SHSpec-276 Summary of Modern Auditing _______________
  • 162. HCOB 16 Nov 65 Commands for Upper Indoc __________

  • Tape 6306C20 SHSpec-277 History of Psychotherapy _______________
  • 163. HCOB 19 Nov 65 Problems Processes __________

  • HCOB 24 Jun 63 Routine 3R Engram Running by Chains _______________
  • 164. HCOB 24 Nov 65 Search and Discovery __________

  • Tape 6306C25 SHSpec-278 Routine 2H (Modern Processes) _______________
  • 165. DEMO: The 3 Types of PTS __________

  • HCOB 25 Jun 63 Routine 2H. ARC Breaks by Assessment _______________
  • 166. HCOB 1 Dec 65 CCHs __________

  • Tape 6306C26 SHSTVD-22-279 Listing Assessment for Engram Running Part I _______________
  • 167. HCOB 6 Dec 65 Low TA Cases __________

  • Tape 6306C27 SHSTVD-23-280 Listing Assessment for Engram Running Part II _______________
  • 168. CLAY DEMO: The purpose of each CCH __________

  • HCOB 1 Jul 63 Routine 3R. Preliminary Step _______________
  • 169. HCOB 27 Dec 65 Vitamins __________

  • HCOB 5 Jul 63 CCHs Rewritten _______________
  • END OF PART 5
  • HCOB 5 Jul 63 All Routines. ARC Break Assessments _______________
  • The student is routed to Qual to attest to Part 5 of the Class V Checksheet. I attest that I have completed Part 5 of this Checksheet, That I have used full study tech throughout, that I have no Misunderstoods and know and can apply the materials:

  • Tape 6307C09 SHSpec-281 The Free Being _______________
  • STUDENT:______________________________ DATE:_______________

  • HCOB 9 Jul 63 A Technical Summary. The required skills of processing and Why _______________
  • I attest that student has completed the requirements of Part 5 of this Checksheet and does know and can apply the

  • Tape 6307C10 SHSpec-282 Auditing Skills of R3R _______________
  • Materials:

  • Tape 6307C10 SHSpec-284A Preliminary Steps R3R. Part I _______________
  • COURSE SUPERVISOR:_____________________________ DATE:_______________

  • Tape 6307C10 SHSpec-284B Preliminary Steps R3R. Part II _______________
  • The student attestation on completion of Part 5 has been Received and logged.

  • Tape 6307C11 SHSpec-283 ARC Breaks _______________
  • CERTS & AWARDS OFFICER:________________________ DATE:_______________

  • HCOB 11 Jul 63 Auditing Rundown. Missed Withholds _______________
  • PART 6 – (1966-1970)

  • Tape 6307C16 SHSpec-285 Tips on Running R3R _______________
  • 1. BOOK: The Book Introducing the E-Meter (1966) __________

  • Tape 6307C17 SHSpec-286 Dating _______________
  • 2. HCOB 19 Jan 66 Danger Conditions, Technical Data for Review Auditors __________

  • Tape 6307C18 SHSpec-287 Errors in Time _______________
  • 3. HCOB 21 Jan 66 S & D Errors __________

  • HCOB 21 Jul 63 Co-Audit. ARC Break Process _______________
  • 4. HCOB 28 Jan 66 S & D Data, How a Suppressive Becomes One __________

  • HCOB 22 Jul 63 Org Technical. HGC Processes and Training _______________
  • 5. HCOB 5 Feb 66 S & D Warning __________

  • HCOB 22 Jul 63 You can be Right _______________
  • 6. HCOB 5 Feb 66 Letting the PC Itsa __________

  • Tape 6307C23 Between Lives Implants _______________
  • 7. HCOB 5 Feb 66 S & D Data __________

  • HCOB 23 Jul 63 Auditing Rundown. Missed Withholds _______________
  • 8. HCOB 9 Feb 66 Release Grades __________

  • Tape 6307C24 SHSpec-289 ARC Breaks and the Comm Cycle _______________
  • 9. HCOB 11 Feb 66 Free Needles, How to Get them on a PC __________

  • Demonstrate in clay What happens to the pc and bank when auditor cuts the comm cycle from the pc _______________
  • 10. DEMO: What the Auditor requirements are to get free needles on PCs. __________

  • Tape 6307C25 SHSpec-290 Comm Cycle in Auditing _______________
  • 11. HCOB 12 Feb 66 The Dangerous Auditor __________

  • Demonstrate in clay A fractured comm cycle _______________
  • 12. DEMO: The actions and omissions of a Dangerous Auditor __________

  • HCOB 26 Jul 63 Training Technology _______________
  • 13. HCOB 21 Feb 66 Definition Processes __________

  • HCOB 28 Jul 63 Time and the Tone Arm _______________
  • 14. HCOB 3 Apr 66 Dianetic Auditing Courses __________

  • HCOB 29 Jul 63 Scientology Review _______________
  • 15. HCOB 10 Jun 66 S & D Commands __________

  • HCOB 29 Jul 63 SHSBC Training Drills. Checking for a Clean Needle _______________
  • 16. HCOB 19 Jun 66 S & D – The Missed Item __________

  • HCOB 4 Aug 63 All Routines. E-Meter Errors. Communication Cycle Error _______________
  • 17. CLAY DEMO: What happens to a pc and bank when an item is missed on a Listing Process. __________

  • Tape 6308C06 SHSpec-291 Auditing Comm Cycles _______________
  • 18. TAPE: 6607C19 SHSpec-69 About Rhodesia __________

  • Demonstrate in clay The auditing comm cycle _______________
  • 19. HCOB 20 Jul 66 Type Two PTS __________

  • Tape 6308C07 SHSpec-292 R 2H Fundamentals _______________
  • 20. TAPE: 6607C21 SHSpec-70 Dianetic Auditing __________

  • Tape 6308C08 SHSpec-293 R 2H Assessment _______________
  • 21. TAPE: 6607C26 SHSpec-71 The Classification Chart and Auditing __________

  • HCOB 9 Aug 63 Definition of Release _______________
  • 22. CLAY DEMO: Why Grades 0-IV are in the sequence they are in. __________

  • Demonstrate in clay The five points which indicate a process is flat per tape 6307C25, showing the pc and bank _______________
  • 23. TAPE: 6607C28 SHSpec-72 Dianetic Auditing and the Mind __________

  • HCOB 11 Aug 63 ARC Break Assessments _______________
  • 24. TAPE: 6608C02 SHSpec-73 Suppressives and GAEs __________

  • HCOB 14 Aug 63 Lecture Graphs _______________
  • 25. TAPE: 6608C04 SHSpec-74 Dianetics, Scientology and Society __________

  • Tape 6308C14 SHSpec-294 Auditing Tips _______________
  • 26. HCOB 10 Aug 66 Errors of Students __________

  • Tape 6308C15 SHSpec-295 The Tone Arm _______________
  • 27. TAPE: 6608C16 SHSpec-75 Releases and Clears __________

  • Demonstrate in clay What the Tone Arm registers _______________
  • 28. TAPE: 6608C18 SHSpec-76 Study and Intention __________

  • HCOB 19 Aug 63 How to do an ARC Break Assessment _______________
  • 29. CLAY DEMO: Intention __________

  • Tape 6308C20 SHSpec-296 The Itsa Line _______________
  • 30. HCOB 22 Aug 66 Floating Needles, Listing Processes __________

  • Demonstrate in clay The itsa line _______________
  • 31. HCOB 23 Aug 66 Service Facsimile __________

  • HCOB 20 Aug 63 R3R- R3N. The Preclears Postulates _______________
  • 32. TAPE: 6608C25 SHSpec-78 The Anti-Social Personality __________

  • Tape 6308C21 SHSpec-297 The Itsa Line (Cont‘d) _______________
  • 33. TAPE: 6609C01 SHSpec-79 Gradients and ARC __________

  • Tape 6308C22 SHSpec-298 Project 80 _______________
  • 34. TAPE: 6609C03 SHSpec-80 States of Identity __________

  • HCOB 22 Aug 63 Project 80. The Itsa Line and Tone Arm _______________
  • 35. HCOB 20 Sep 66 Minus Scale Releases __________

  • Tape 6308C27 SHSpec-299 Rightness and Wrongness _______________
  • 36. HCOB 21 Sep 66 ARC Break Needle __________

  • Tape 6308C28 SHSpec-300 The TA and the Service Facsimile _______________
  • 37. CLAY DEMO: An ARC Brk Needle, the pc and the bank. __________

  • Tape 6308C29 SHSpec-301 The Service Facsimile _______________
  • 38. HCOB 27 Sep 66 The Anti-Social Personality, The Anti-Scientologist __________

  • HCOB 1 Sep 63 Routine 3SC _______________
  • 39. DEMO: The difference between the antisocial and social personalities __________

  • Tape 6309C04 SHSpec-302 How to find a Service Facsimile _______________
  • 40. TAPE: 6611C01 SHSpec-81 Government and Organization __________

  • Tape 6309C03 SHSpec-302A R3SC _______________
  • 41. HCOB 18 Nov 66 Rehab on Self Analysis __________

  • Demonstrate in clay A Service Facsimile _______________
  • 42. TAPE: 6611C29 SHSpec-82 OT and Clear Defined __________

  • HCOB 4 Sep 63 Assessment TR _______________
  • 43. HCOB 30 Nov 66 Assessment for Service Facsimiles __________

  • HCOB 4 Sep 63 Assessment _______________
  • 44. TAPE: 6612C06 SHSpec-83 Scientology Definitions II __________

  • Demonstrate in clay Assessment by Blowdown _______________
  • 45. TAPE: 6612C13 SHSpec-84 Scientology Definitions III __________

  • Tape 6309C05 SHSpec-303 Service Fac Assessment _______________
  • 46. HCOB 2 Jan 67 Dating – Forbidden Words __________

  • HCOB 6 Sep 63 Instructing in Scientology Auditing, Instructor’s Task; DofP’s Case Handling _______________
  • 47. HCOB 2 Jan 67 Sub-Zero Releases Examiner’s Safeguard __________

  • HCOB 9 Sep 63 Repetitive Rudiments and Repetitive Prepchecking _______________
  • 48. HCOB 22 Mar 67 Important Admin Know How Alter-Is and Degraded Beings __________

  • Tape 6309C10 SHSpec-304 Destimulation of a Case _______________
  • 49. HCOB 18 Apr 67 Religious Philosophy and Religious Practice __________

  • Demonstrate in clay Destimulation _______________
  • 50. HCOB 30 Jun 67 Evidences of an Abberated Area __________

  • Tape 6309C11 SHSpec-306 Service Facs and GPMs _______________
  • 51. HCOB 19 Aug 67 The Supreme Test __________

  • Tape 6309C12 SHSpec-305 Service Facs _______________
  • 52. HCOB 13 Sep 67 Remedy B __________

  • HCOB 12 Sep 63 CCHs Data _______________
  • 53. HCOB 18 Sep 67 Scales __________

  • Tape 6309C17 SHSpec-307 What you Are Auditing _______________
  • 54. HCOB 11 Oct 67 Clay Table Training __________

  • Tape 6309C18 SHSpec-308 St. Hill Service Fac Handling _______________
  • 55. HCOB 9 Nov 67 Review Auditors – Book of Case Remedies Revision of Remedy A, Remedy B and S & Ds __________

  • Tape 6309C19 Routine 4M TA _______________
  • 56. HCOB 28 Nov 67 “The Key S & D Question is ...” __________

  • HCOB 22 Sep 63 Prepcheck Buttons _______________
  • 57. HCOB 27 Dec 67 List Handling __________

  • HCOB 23 Sep 63 Tape Coverage of New Technology _______________
  • 58. HCOB 9 Jan 68 Money Process __________

  • Tape 6309C24 Summary I _______________
  • 59. BOOK: Introduction to Scientology Ethics (1968) __________

  • Tape 6309C25 SHSpec-310 Summary II Scientology 0 _______________
  • 60. HCOB 13 Jan 68 S & Ds __________

  • HCOB 25 Sep 63 Listing and Nulling for Locks not RI‘s (removed per LRH Despatch 67) _______________
  • 61. HCOB 16 Jan 68 Starting of Preclears __________

  • HCOB 25 Sep 63 Adequate Tone Arm Action _______________
  • 62. HCOB 19 Jan 68 S & Ds __________

  • Tape 6309C26 SHSpec-311 Summary III About Level IV Auditing _______________
  • 63. HCOB 12 Mar 68 Mistakes, Anatomy Of __________

  • HCOB 1 Oct 63 Training Cycles _______________
  • 64. HCOB 18 Apr 68 Needle Reactions Above Grade IV __________

  • HCOB 1 Oct 63 How to Get Tone Arm Action _______________
  • 65. HCOB 7 May 68 Upper Indoc TRs __________

  • HCOB 2 Oct 63 Experimental Process Withdrawn _______________
  • 66. HCOB 20 May 68 Overt-Motivator Sequence __________

  • HCOB 8 Oct 63 How to Get T.A. Analysing Auditing _______________
  • 67. HCOB 24 May 68 Coaching __________

  • Tape 6310C15 SHSpec-312 Essentials of Auditing _______________
  • 68. HCOB 6 Jun 68 Sec Checking Info __________

  • Tape 6310C16 The Itsa Maker Line _______________
  • 69. HCOB 1 Aug 68 The Laws of Listing and Nulling __________

  • Demonstrate in clay The itsa maker line _______________
  • 70. CLAY DEMO: Each Law of L & N __________

  • HCOB 16 Oct 63 R3SC Slow Assessment _______________
  • 71. EXERCISE: Learn each law verbatim __________

  • Tape 6310C17 SHSpec-314 Levels of Auditing (Level IV Auditing) _______________
  • 72. HCOB 5 Aug 68 Level II Change of Commands Overt-Motivator Sequence __________

  • HCOB 17 Oct 63 R2C Slow Assessment by Dynamics, Directions for use of HCO Tech Form _______________
  • 73. HCOB 6 Aug 68 R3H __________

  • HCOB 17 Oct 63 R2C Slow Assessment by Dynamics _______________
  • 74. BTB 14 Aug 68R Remedy B Environment and “New Style” __________

  • Tape 6310C21 Attack and GPMs _______________
  • 75. HCOB 26 Aug 68 Quals – Rehab and Correction __________

  • Tape 6310C22 SHSpec-316 The Integration of Auditing _______________
  • 76. HCOB 28 Aug 68 Out Tech __________

  • Tape 6310C23 Auditing the GPM _______________
  • 77. HCOB 28 Aug 68 Drugs __________

  • Tape 6310C29 Routine 4 _______________
  • 78. HCOB 29 Aug 68 Drug Data __________

  • Tape 6310C30 R4 Case Assembly _______________
  • 79. HCOB 31 Aug 68 “It is a High Crime for a Case Supervisor...” __________

  • Tape 6310C31 R4M2 Programing _______________
  • 80. HCOB 19 Sep 68 “Old lists are not to be copied ...” __________

  • HCOB 31 Oct 63 R2C Slow Assessment by Dynamics _______________
  • 81. HCOB 20 Sep 68 Glee __________

  • Tape 6311C05 SHSpec-321 Three Zones of Auditing _______________
  • 82. HCOB 20 Sep 68 Review, Ordering People To __________

  • Demonstrate in clay Basic auditing, technique and case analysis _______________
  • 83. HCOB 23 Sep 68 Drugs and Trippers __________

  • Tape 6311C07 SHSpec-322 Relationship of Training to OT _______________
  • 84. HCOB 23 Sep 68 New Rudiments __________

  • HCOB 25 Nov 63 Dirty Needles _______________
  • 85. HCOB 25 Sep 68 “A listing questions used...” __________

  • HCOB 26 Nov 63 Basic Auditing, Technique, Case Analysis _______________
  • 86. HCOB 27 Sep 68 ARC Straight Wire __________

  • Tape 6311C26 R4 Auditing _______________
  • 87. DEMO: Why ARC always precedes an ARC Break __________

  • Tape 6311C27 SHTVD-25 SHSpec-330 Auditing Demo and Comments by LRH _______________
  • 88. HCOB 30 Sep 68 Lists __________

  • Tape 6311C28 SHSpec-324 Seven Classifications _______________
  • 89. HCOB 4 Oct 68 Ruds __________

  • Tape 6312C03 SHSpec-325 Certifications and Classifications _______________
  • 90. HCOB 8 Oct 68 Case Supervisor – Folder Handling __________

  • Tape 6312C04 SHTVD-24-326 Basic Auditing _______________
  • 91. HCOB 14 Oct 68 “You must NEVER NEVER NEVER...” __________

  • Tape 6312C05 SHSpec-327 Basic Auditing _______________
  • 92. HCOB 14 Oct 68 “The definition of Recall...” __________

  • Tape 6312C10 SHSpec-328 Scientology 0 _______________
  • 92a.HCOPL 14 Oct 68 Auditor’s Code __________

  • Tape 6312C12 SHSpec-329 Summary of OT Processes _______________
  • 93. HCOB 18 Oct 68 “The correct order in which Sub-Zeros....” __________

  • HCOB 14 Dec 63 Case Analysis. Health Research _______________
  • 94. HCOB 21 Oct 68 Floating Needle __________

  • HCOB 28 Dec 63 Indicators. Part one: Good Indicators _______________
  • 94a.HCOPL 2 Nov 68 Auditor’s Code __________

  • Demonstrate in clay ”Indicators” _______________
  • 95. HCOB 9 Nov 68 Clearing Commands – All Levels __________

  • Tape 6312C31 SHSpec-1 Indicators _______________
  • 96. BTB 18 Nov 68R Model Session __________

  • Tape 6401C07 SHSpec -2 Good Indicators (at Lower Levels) _______________
  • 97. BTB 6 Dec 68 Release, Rehabilitation Of __________

  • Tape 6401C09 SHSpec-3 Bad Indicators _______________
  • 98. HCOB 15 Dec 68RC L4BR __________

  • Demonstrate in clay ”Good indicators”, ”Bad indicators” _______________
  • 99. HCOB 26 Dec 68 The Third Party Law __________

  • HCOB 17 Jan 64 R2C Slow Assessment by Dynamics Directions _______________
  • 100. HCOB 8 Jan 69 Drugs and Insanity __________

  • HCOB 21 Jan 64 Meter Level Warning _______________
  • 101. HCOB 3 Feb 69 Triple Grade Flows __________

  • Book. The Book of Case Remedies _______________
  • 102. BTB 9 Feb 69R Research Notes __________

  • Tape 6402C04 SHSpec-4 Auditor Self Criticism _______________
  • 103. HCOB 3 Mar 69 Case Gain – Completing Levels __________

  • Tape 6402C06 SHSpec-5 Comm Cycle in Auditing _______________
  • 104. BTB 14 Mar 69R “It is ok....” __________

  • Tape 6402C25 SHSpec-6 What Auditing is and What it isn‘t _______________
  • 105. HCOB 17 Mar 69 Politics __________

  • Demonstrate in clay The cycles of action that occur in the giving of an auditor question, receiving it‘s answer, and the acknowledgement _______________
  • 106. BTB 15 Apr 69 PTP Rudiment __________

  • HCOB 1 Mar 64 Meter Reads, Size of _______________
  • 107. BTB 24 Apr 69R PC Assessment Sheet __________

  • Tape 6403C03 SHSpec-7 Auditing and Assessment _______________
  • 108. BTB 26 Apr 69 Bad Indicators __________

  • HCOB 4 Mar 64 Class Two Model Session _______________
  • 109. HCOB 7 May 69 Summary of How to Write an Auditor’s Report __________

  • Tape 6403C05 SHSpec-8 Case Analysis - Healing _______________
  • 110. HCOB 11 May 69 Meter Trim Check __________

  • Tape 6403C10 SHSpec-9 Summary of Lower Levels – Clearing at Level IV _______________
  • 111. HCOB 6 Jun 69 Prediction and Consequences __________

  • HCOB 15 Mar 64 Overwhelming the PC _______________
  • 112. BTB 7 Jun 69 How to Make a Person Sober __________

  • HCOB 15 Mar 64 Everything Reading _______________
  • 113. BTB 4 Jul 69 Auditing of OT III Preclears __________

  • Tape 6403C17 SHSpec-11 The Road to Perfection (Lower Levels of Auditing) _______________
  • 114. BTB 10 Jul 69R Exteriorization Remedy __________

  • Tape 6403C19 SHSpec-12 Flattening a Process _______________
  • 115. HCOB 29 Jul 69 The “Art” of Case Supervision __________

  • Demonstrate in clay Why a process is flattened _______________
  • 116. HCOB 15 Aug 69 Flying Ruds __________

  • Tape 6403C24 SHSpec-13 International City _______________
  • 117. HCOB 16 Aug 69 Handling Illness in Scientology __________

  • HCOB 7 Apr 64 All Levels. Q&A _______________
  • 118. HCOB 15 Nov 69 Case Supervision, How it Goes Non-Standard __________

  • HCOB 7 Apr 64 Truth and Reality _______________
  • 119. HCOB 23 Nov 69R Student Rescue Intensive __________

  • HCOB 10 Apr 64 All Levels Auditing Skills _______________
  • 120. BOOK: Scientology 08 __________

  • Tape 6404C10 SHSpec-14 How to Manage a Course _______________
  • 121. DEMO: The Levels of the “Emotional Tone Scale”. __________

  • Tape 6404C14 SHSpec-15 The Classification- Gradation Programme _______________
  • 122. CLAY DEMO: The Levels of the “Scale of Identification”. __________

  • Tape 6404C16 SHSpec-16 Auditing by Lists _______________
  • 123. CLAY DEMO: The Levels of the “Havingness Scale”. __________

  • Demonstrate in clay Auditing by list _______________
  • 124. CLAY DEMO: The Levels of the “Responsibility Scale”.__________

  • HCOB 20 Apr 64 Model Session Level III - VI _______________
  • 125. CLAY DEMO: Each Level of the “Scale of Confront”. __________

  • Tape 6404C21 SHSpec-17 Problems and Solutions _______________
  • 126. HCOB 31 Jan 70 Withholds, Other Peoples __________

  • HCOB 23 Apr 64 Auditing by Lists _______________
  • 127. DEMO: How to handle a pc who gives off other people’s withholds __________

  • Tape 6404C28 SHSpec-18 Wisdom as an Auditor _______________
  • 128. HCOB 4 Feb 70 PC Application for Major Actions __________

  • Tape 6404C30 SHSpec-19 Effectiveness of Processing _______________
  • 129. HCOB 20 Feb 70 Floating Needles and End Phenomena __________

  • Tape 6405C19 SHSpec-20 The Preclear and getting Auditing to Work _______________
  • 130. HCOB 27 Mar 70 Green Form __________

  • HCOB 19 May 64 Class II Model Session _______________
  • 131. HCOB 29 Mar 70 Auditing and Ethics __________

  • Tape 6406C09 SHSpec-22 Cycle of Action. Its Interpretation on the E-Meter _______________
  • 132. HCOB 1 Apr 70 Ethics Program No. 1 Case Actions __________

  • Tape 6406C16 SHSpec-23 Communication, Overts and Responsibility _______________
  • 133. HCOB 8 Apr 70 More on Prepchecks __________

  • Demonstrate in clay What happens to pc‘s communication and responsibility when he has overts _______________
  • 134. HCOB 11 Apr 70 Auditing Past Exterior __________

  • Tape 6406C18 SHSpec-24 Studying Introduction _______________
  • 135. HCOB 21 Apr 70 2 Way Comm C/Ses __________

  • HCOB 29 Jun 64 Central Org & Field Auditor Targets _______________
  • 136. HCOB 6 May 70 Blows – Auditing Past Exterior __________

  • Tape 6406C30 SHSpec-25 Cause Level, OT and the Public _______________
  • 137. HCOB 27 May 70 Unreading Questions and Items __________

  • HCOB 30 Jun 64 Field Auditor Targets _______________
  • 138. CLAY DEMO: Why you don’t run unreading questions or items. __________

  • Tape 6407C02 SHSpec-26 O/W Modernized and Reviewed _______________
  • 139. HCOB 28 May 70 Correction Lists, Use Of __________

  • Tape 6407C07 SHSpec-27 Dissemination _______________
  • 140. HCOB 30 May 70 Interiorization Intensive 2 Way Comm __________

  • HCOB 7 Jul 64 Justifications _______________
  • 141. HCOB 2 Jun 70 Floating Needles __________

  • HCOB 8 Jul 64 More Justifications _______________
  • 142. HCOB 5 Jun 70 Triple Grades __________

  • Tape 6407C09 SHSpec-28 Studying. Data Assimilation _______________
  • 143. HCOB 8 Jun 70 Low TA Handling __________

  • HCOB 10 Jul 64 Overts- Order of effectiveness in Processing _______________
  • 144. HCOB 12 Jun 70 C/S Series 2 Programming of Cases __________

  • Demonstrate in clay The overt-motivator sequence _______________
  • 145. HCOB 13 Jun 70 C/S Series 3 Session Priorities __________

  • HCOB 12 Jul 64 More on O/Ws _______________
  • 146. HCOB 13 Jun 70 Hubbard Consultant Study Stress Analysis __________

  • Tape 6407C14 Track and Bank Anatomy _______________
  • 147. HCOB 14 Jun 70 C/S Series 4 The Return Program __________

  • Tape 6407C15 SHSpec-30 Organizational Operation _______________
  • 148. HCOB 15 Jun 70 C/S Series 5 Repair Example __________

  • HCOB 24 Jul 64 TA Counters, Use of _______________
  • 149. HCOB 16 Jun 70 C/S Series 6 What the C/S is Doing __________

  • Tape 6407C26 SHSpec-31 Campaign to handle Psychosomatic Ills _______________
  • 150. BTB 17 Jun 70R Triple Rudiments __________

  • HCOB 29 Jul 64 Good Indicators at Lower Levels _______________
  • 151. HCOB 19 Jun 70 C/S Series 7 C/S Q & A __________

  • Tape 6407C30 SHSpec-32 Psychosomatic- It‘s meaning in Scientology _______________
  • 152. HCOB 19 Jun 70 C/S Series 8 Chart of Human Evaluation __________

  • Tape 6408C04 SHSpec-33 A Summary of Study _______________
  • 153. BTB 20 Jun 70 Summary Report __________

  • Tape 6408C06 SHSpec-34 Study- Gradients and Nomenclature _______________
  • 154. TAPE: 7006C21 Spec Lect Expanded Grades and Training __________

  • Demonstrate in clay A gradient and nomenclature _______________
  • 155. HCOB 21 Jun 70 C/S Series 9 Superficial Actions __________

  • Tape 6408C11 SHSpec-35 Evaluation of Information _______________
  • 156. HCOB 24 Jun 70 C/S Series 10 Repairing a Repair __________

  • Tape 6408C13 SHSpec-36 Study and Education _______________
  • 157. BTB 25 Jun 70R Fishing a Cognition __________

  • HCOB 14 Aug 64 Prepcheck Buttons _______________
  • 158. HCOB 25 Jun 70 C/S Series 11 “The following HCOBs....” __________

  • HCOB 14 Aug 64 Model Session Levels III to VI _______________
  • 159. HCOB 25 Jun 70 C/S Series 12 Glossary of C/S Terms __________

  • HCOB 17 Aug 64 Clay Table Work in Training and Processing _______________
  • 160. HCOB 30 Jun 70R C/S Series 13R VIII Actions __________

  • HCOB 24 Aug 64 Session Must-Nots _______________
  • 161. HCOB 3 Jul 70 C/S Series 14 C/Sing 2 Way Comm __________

  • Tape 6409C01 SHSpec-37 The B. S. Course (The PE Course) _______________
  • 162. BTB 10 Jul 70 2 Way Comm A Class III Action __________

  • Tape 6409C03 SHSpec-38 Clearing- What it is _______________
  • 163. HCOB 24 Jul 70 Data Series __________

  • HCOB 7 Sep 64 PTPs Overts and ARC/B‘s _______________
  • 164. BTB 31 Jul 70R Hubbard Consultant Listen and2 Way Comm Drills __________

  • HCOB 7 Sep 64 Clay Table Levels _______________
  • 165. HCOB 16 Aug 70 C/S Series 15 Getting the F/N to Examiner __________

  • HCOB 8 Sep 64 Overts, What lies behind them _______________
  • 166. BTB 20 Aug 70R Two Complete Differences: Assessment, Listing & Nulling __________

  • Demonstrate in clay The cycle of an overt _______________
  • 167. DEMO: The difference between Assessment and L & N __________

  • HCOB 9 Sep 64 Clay Table Healing _______________
  • 168. HCOB 20 Aug 70 Exteriorization Rundown Musts __________

  • HCOB 9 Sep 64 Clay Table Clearing _______________
  • 169. HCOB 21 Aug 70 C/S Series 16 Session Grading __________

  • HCOB 12 Sep 64 Clay Table, More Goofs _______________
  • 170. HCOB 26 Aug 70 C/S Series 17 Incomplete Cases __________

  • Tape 6409C15 SHSpec-39 Scientology and Tradition _______________
  • 171. BTB 6 Sep 70R Model Consultation for Hubbard Consultant __________

  • Tape 6409C22 SHSpec-40 A Review of Study _______________
  • 172. HCOB 11 Sep 70 C/S Series 18 Chronic Somatic __________

  • Demonstrate in clay Why a student gives up studying _______________
  • 173. HCOB 21 Sep 70 Study Series 1 Study Definitions __________

  • HCOB 27 Sep 64 Clay Table Clearing _______________
  • 174. BTB 4 Oct 70 Case Supervisor Signature __________

  • Tape 6409C29 SHSpec-41 Gradients _______________
  • 175. HCOB 6 Oct 70 C/S Series 19 Folder Error Summaries __________

  • Tape 6410C13 SHSpec-42 Cycles of Action _______________
  • 176. HCOB 8 Oct 70 C/S Series 20 Persistent F/N __________

  • HCOB 17 Oct 64 Getting the PC Sessionable _______________
  • 177. HCOB 13 Oct 70 Course Supervisor Corrections __________

  • HCOB 17 Oct 64 Clearing, Why it Works _______________
  • 178. HCOB 18 Oct 70 Auditors Stats on F/N VGIs __________

  • HCOB 17 Oct 64 Clay Table Data _______________
  • 179. BTB 22 Oct 70 Reading Questions __________

  • Tape 6410C20 SHSpec-43 Levels- The Reason for them _______________
  • 180. BTB 22 Oct 70 “No Overts” Cases __________

  • Tape 6410C27 SHSpec-44 The Failed Case _______________
  • 181. BTB 26 Oct 70R Further Remedy for PCs Unable to Go Backtrack __________

  • HCOB 1 Nov 64 More Clay Table Clearing Goofs _______________
  • 182. HCOB 26 Oct 70 Obnosis and the Tone Scale __________

  • Tape 6411C03 SHSpec-45 Programmes _______________
  • 183. HCOB 10 Nov 70 C/S Series 21 C/S Responsibility for Training __________

  • Tape 6411C04 Comments on Clay Table TV-Demo _______________
  • 184. HCOB 28 Nov 70 C/S Series 22 Psychosis __________

  • HCOB 6 Nov 64 Styles of Auditing _______________
  • 185. HCOB 10 Dec 70 Clay Table Work in Training __________

  • Tape 6411C10 SHSpec-46 PTP‘s, Overts and ARC Breaks _______________
  • 186. HCOB 23 Dec 70 Fast Courses __________

  • Demonstrate in clay An overt, a PTP, an ARC/B and their effects on a case if not handled _______________
  • END OF PART 6
  • HCOB 12 Nov 64 Definition Processes _______________
  • The student is routed to Qual to attest to Part 6 of the Class V Checksheet.

  • HCOB 16 Nov 64 Clay Table Label Goofs _______________
  • I attest that I have completed Part 6 of this Checksheet, that I have used full study tech throughout, that I have no misunderstoods and know and can apply the materials:

  • Tape 6411C17 SHSpec-47 Styles of Auditing _______________
  • STUDENT:_________________________________________DATE:_____________

  • HCOB 10 Dec 64 Listen Style Auditing _______________
  • I attest that student has completed the requirements of Part 6 of this checksheet and does know and can apply the Materials:

  • HCOB 11 Dec 64 Scientology ”0” Processes _______________
  • COURSE SUPERVISOR:_______________________________DATE:_____________

  • Tape 6412C15 SHSpec-49 Communication - A Gradient on Duplication _______________
  • The student attestation on completion of Part 6 has been Received and logged.

  • HCOB 26 Dec 64 Scientology ”0A” Process _______________
  • CERTS & AWARDS OFFICER:__________________________DATE:_____________

    I attest that I have completed Part 3 of this checksheet, that I have used full study tech throughout, that I have no misunderstood and know and can apply the materials:

    PART 7 – (1971-1974)

    STUDENT: ___________________________ DATE: _______________

    1. HCOB 2 Jan 71 Illegal Auditing __________

    I attest that student has completed the requirements of Part 1 of this checksheet and does know and can apply the materials:

    2. HCOB 4 Jan 71 Exteriorization and High TA __________

    COURSE SUPERVISOR: ___________________ DATE: _______________

    3. CLAY DEMO: The definition of exteriorization. __________

    Student has passed a metered check for misunderstoods on these materials and has passed a written examination on the key materials 100 %:

    4. CLAY DEMO: The definition of interiorization. __________

    STUDENT EXAMINER: ____________________ DATE: ________________

    5. CLAY DEMO: Why an Int/Ext must be done in one session. __________


    6. BTB 6 Jan 71R Starrate Checkouts for Int Rundown __________

    PART – 4 (1965 – 1966)

    7. BTB 8 Jna 71R Auditing C/S-1 __________

    1. Tape 6503C 02 SHSpec–53 Technology and Hidden Standards _______________

    8. HCOB 13 Jan 71 Exteriorization __________

  • Demonstrate in clay a hidden standard _______________
  • 9. BTB 7 Feb 71 Admin TRs __________

  • HCOB 4 Mar 65 Level ”0” Materials _______________
  • 10. HCOB 10 Feb 71 Tech Volume and 2 Way Comm __________

  • HCOB 5 Mar 65 Book of Case Remedies, Application of Tech _______________
  • 11. HCOB 28 Feb 71 C/S Series 24 Metering Reading Items __________

  • Tape 6503C 09 SHSpec–54 The New Organization Structure _______________
  • 12. DEMO:

  • HCOB 10 Mar 65 Words, Misunderstood Goofs _______________
  • a. What is a read. __________

  • Demonstrate in clay what happens when a person gets a misunderstood word _______________
  • b. The valid time to note down reads __________

  • Tape 6503C 16 SHSpec–55 The Progress and Future of Scientology _______________
  • 13. HCOB 5 Mar 71 C/S Series 25 The Fantastic New HGC Line __________

  • HCOB 23 Mar 65 Level ”0” Materials _______________
  • 14. HCOB 6 Mar 71 C/S Series 26 New Uses for the Green Form __________

  • HCOB 29 Mar 65 All Levels – ARC Breaks _______________
  • 15. HCOB 6 Mar 71 C/S Series 27 Long C/Ses __________

  • Tape 6503C 30 SHSpec–56 ARC Breaks and Generalities _______________
  • 16. HCOB 7 Mar 71 C/S Series 28RA-1 Use of Reissued 13.1.75 Quadruple Dianetics __________

  • Demonstrate in clay a generality and what that has to do with an ARC/B _______________
  • 17. HCOB 8 Mar 71 C/S Series 29 Case Actions, Off Line __________

  • Book The Book of E-Meter Drills _______________
  • 18. HCOB 14 Mar 71R F/N Everything __________

  • Drill to a pass each drill in the book of E-Meter Drills _______________
  • 19. CLAY DEMO: The consequences of not F/Ning a reading item. __________

  • HCOB 2 Apr 65 The Road to Clear _______________
  • 20. BTB 14 Mar 71R Talking the TA Down __________

  • HCOB 4 Apr 65 ARC Breaks and Missed Withholds _______________
  • 21. HCOB 19 Mar 71 L1C __________

  • HCOB 5 Apr 65 A Conditions Test Process _______________
  • 22. HCOB 19 Mar 71 C/S Series 30 C/Sing Auditor-C/Ses __________

  • Tape 6504C 06 SHSpec–57 Org Board and Livingness _______________
  • 23. HCOB 31 Mar 71 C/S Series 31 Programming and Misprogramming __________

  • HCOB 7 Apr 65 Premature Acknowledgements _______________
  • 24. HCOB 5 Apr 71 C/S Series 33RA-1 Triple and Reissued 13.1.75 Quad Reruns __________

  • Tape 6504C 13 SHSpec–58 The Lowest Levels _______________
  • 25. DEMO: What will happen if you don’t run all flows of an item or Grade. __________

  • HCOB 18 Apr 65 How to Apply Processing _______________
  • 26. HCOB 6 Apr 71 C/S Series 34 Non-F/N Cases __________

  • Tape 6504C 27 SHSpec–59 Awareness Levels _______________
  • 27. HCOB 11 Apr 71RA L3RD __________

  • HCOB 27 Apr 65 Clay Table Healing Goof _______________
  • 28. BTB 17 Apr 71R HGC Morale and Auditor Competence __________

  • HCOB 5 May 65 More on the Application of Scientology to Children _______________
  • 29. HCOB 21 Apr 71 C/S Series 36RB-1 Quadruple Reissued 13.1.75 Dianetics Dangers Of __________

  • Tape 6505C 11 SHSpec–60 ARC Breaks and PTP‘s, The Differentiation _______________
  • 30. HCOB 26 Apr 71 TRs and Cognitions __________

  • Demonstrate in clay what happens to pc and bank if you audit over an ARC/B and PTP _______________
  • 31. HCOB 28 Apr 71 Okays to Audit in HGCs __________

  • Tape 6505C 18 SHSpec–61 Organization and Ethics _______________
  • 32. HCOB 30 Apr 71 Auditing Comm Cycle __________

  • HCOB 22 May 65 Auditing by Lists _______________
  • 33. DEMO: The auditing comm cycle __________

  • Tape 6505C 25 SHSpec–62 The Five Conditions _______________
  • 34. BOOK: Basic Scientology Picture Book __________

  • HCOB 4 Jun 65 Class II Model Session _______________
  • 35. HCOB 13 May 71 Student Grasp of Materials __________

  • Tape 6506C 08 SHSpec–63 Handling the PTS _______________
  • 36. BTB 22 May 71R Revised TR-8 Clarification __________

  • Demonstrate in clay a P.T.S. _______________
  • 37. HCOB 23 May 71R Basic Auditing Series 1R The Magic of the Communication Cycle __________

  • HCOB 14 Jun 65 Summary Report _______________
  • 38. HCOB 23 May 71R Basic Auditing Series 2R The 2 Parts of Auditing __________

  • HCOB 18 Jun 65 Clear and OT Behaviour _______________
  • 39. BTB 23 May 71 Basic Auditing Series 3 The 3 Important Comm Lines __________

  • HCOB 28 Jun 65 Releases, Different Kinds _______________
  • 40. CLAY DEMO: Why the “Itsa Maker Line” must not be neglected by the Auditor __________

  • Tape 6506C 29 SHSpec–64 The Well-Rounded Auditor _______________
  • 41. HCOB 23 May 71R Basic Auditing Series 4R Comm Cycles Within the Auditing Cycle __________

  • HCOB 30 Jun 65 Release, Rehabilitation of _______________
  • 42. HCOB 23 May 71 Basic Auditing Series 5 The Comm Cycle in Auditing __________

  • HCOB 3 Jul 65 Model Session Revised _______________
  • 43. HCOB 23 May 71 Basic Auditing Series 6 Auditor Failure to Understand __________

  • HCOB 12 Jul 65 States of Being Attained by Processing _______________
  • 44. HCOB 23 May 71 Basic Auditing Series 7 Premature Acknowledgements __________

  • HCOB 21 Jul 65 Release Rehabilitation _______________
  • 45. HCOB 23 May 71 Basic Auditing Series 8 Letting the PC Itsa __________

  • Tape 6507C 27 SHSpec–65 Stages of Release _______________
  • 46. HCOB 23 May 71 Basic Auditing Series 9 Comm Cycle Additives __________

  • Demonstrate in clay ”Release” _______________
  • 47. HCOB 23 May 71R Basic Auditing Series 10R Recogni- tion of Rightness of the Being __________

  • HCOB 27 Jul 65 Auditing by Lists _______________
  • 48. HCOB 23 May 71 Basic Auditing series 11 Metering __________

  • HCOB 2 Aug 65 Release Goofs _______________
  • 49. HCOB 26 May 71 C/S Series 38 TRs Course and Auditing __________

  • HCOB 5 Aug 65 Auditing Goofs – Blowdown Interruption _______________
  • 50. HCOB 31 May 71R C/S Series 39R Standard 12 ½ Hr Intensive Programs __________

  • HCOB 5 Aug 65 Release Stages _______________
  • 51. HCOB 2 Jun 71 Study Series 2 Confronting __________

  • HCOB 6 Aug 65 Qualifications Technical Actions _______________
  • 52. HCOB 2 Jun 71 Urgent (Overrun Don’t Use) __________

  • HCOB 19 Aug 65 Model Session Revised _______________
  • 53. HCOB 7 Jun 71 C/S Series 40 Low TAs __________

  • HCOB 23 Aug 65 Abbreviations and Symbols of Dianetics and Scientology _______________
  • 54. HCOB 9 Jun 71 C/S Series 41 C/S Tips – Lists __________

  • HCOB 30 Aug 65 Release Stages _______________
  • 55. HCOB 9 Jun 71 C/S Series 42 C/S Rules – Complete Cycles __________

  • HCOB 30 Aug 65 Art (?) _______________
  • 56. HCOB 9 Jun 71 C/S Series 43 C/S Rules – Trouble for the PC __________

  • Tape 6509C 09 SHSpec–66 Classification and Gradation _______________
  • 57. HCOB 10 Jun 71 C/S Series 44R C/S Rules – Program- ming from Prepared Lists __________

  • HCOB 13 Sep 65 Out Tech and how to get it in _______________
  • 58. DEMO: The sequence of handling reads on a prepared list __________

  • Tape 6509C 21 SHSpec–67 Out Tech _______________
  • 59. BTB 16 Jun 71RA Rapid TR-2 __________

  • HCOB 21 Sep 65 Qual Tech Actions _______________
  • 60. BTB 16 Jun 71R Advanced E-Meter Drills __________

  • Demonstrate in clay the five GAE‘s _______________
  • 61. BTB 16 Jun 71RA The Ideal Session Start Drill __________

  • HCOB 22 Sep 65 Release Gradation – New Levels of Release _______________
  • 62. HCOB 19 Jun 71 C/S Series 45 C/S Rules __________

  • HCOB 27 Sep 65 Release Gradation – Additional Data _______________
  • 63. HCOB 19 Jun 71 C/S Series 46 Declares __________

  • HCOB 29 Sep 65 Cyclical and Non-Cyclical Process Conclusions _______________
  • 64. HCOB 20 Jun 71 C/S Series 47 The Supreme Test of a C/S __________

  • HCOB 29 Sep 65 The Continuing Overt Act _______________
  • 65. HCOB 30 Jun 71R Expanded GF 40 RB __________

  • Book A New Slant of Life _______________
  • 66. HCOB 3 Jul 71 Scn III Auditing by Lists Rev. __________

  • HCOB 1 Oct 65 Mutter TR _______________
  • 67. HCOB 5 Jul 71R C/S Series 49R Assists __________

  • Tape 6510C 14 SHSpec–68 Briefing to Review Auditors _______________
  • 68. BTB 7 Jul 71R Resistive Cases – Drug Handling __________

  • Demonstrate in clay the purpose of an S & D _______________
  • 69. HCOB 15 Jul 71 C/S Series 60 C/S Case Gain __________

  • HCOB 21 Oct 65 Release Rehabilitation _______________
  • 70. HCOB 15 Jul 71 C/S Series 48R Drug Handling __________

  • HCOB 5 Nov 65 Five Way Bracket on Help _______________
  • 71. EXERCISE: Look up the word “drug” in the dictionary and fully clear all meanings __________

  • HCOB 5 Nov 65 Lecture Graphs _______________
  • 72. DEMO: Why the Drug RD is done before the Health Form. __________

  • HCOB 7 Nov 65 Release Rehab Error _______________
  • 73. HCOB 17 Jul 71 C/S Series 50 Out of Valence __________

  • HCOB 8 Nov 65 Suppressives and Hidden Standards _______________
  • 74. HCOB 19 Jul 71 C/S Series 52 Internes __________

  • HCOB 14 Nov 65 Clearing Commands _______________
  • 75. BTB 22 Jul 71 Study Series 3 Confronting, Addition __________

    646 HCOB 16 Nov 65 E-Meter Sensitivity Setting _______________

    76. HCOB 23 Jul 71 Assists – A Flag Expertise Subject __________

    1. HCOB 16 Nov 65 Commands for Upper Indoc _______________

    77. HCOB 28 Jul 71 C/S Series 54 Dianetics Beginning a PC On __________

  • HCOB 19 Nov 65 Problems Processes _______________
  • 78. HCOB 4 Aug 71R Post Purpose Clearing __________

  • HCOB 24 Nov 65 Search and Discovery _______________
  • 79. HCOB 8 Aug 71 C/S Series 55 The Ivory Tower __________

  • HCOB 26 Nov 65 Info on Rehabilitation _______________
  • 80. HCOB 16 Aug 71 Training Drills Modernized __________

  • HCOB 1 Dec 65 CCH‚s _______________
  • 81. HCOB 20 Aug 71 Classification and Gradation Chart – Abbreviations Explained __________

  • HCOB 6 Dec 65 Low TA Cases _______________
  • 82. HCOB 23 Aug 71 C/S Series 11 Auditors Rights __________

  • HCOB 10 Dec 65 E-Meter Drill Coaching _______________
  • 83. DRILL: Learn verbatim: the signs of ruds going out in session, what each indicates and the correct handling of each. __________

  • HCOB 27 Dec 65 Vitamins _______________
  • 84. HCOB 24 Aug 71 Assists Addition __________

  • Book The Book Introducing the E-Meter _______________
  • 85. HCOB 25 Aug 71 C/S Series 56 How to Get Results in an HGC. __________

  • HCOB 19 Jan 66 Danger Conditions. Technical Data for Review Auditors _______________
  • 86. HCOB 1 Sep 71 C/S Series 57 A C/S as a Training Officer __________

  • HCOB 21 Jan 66 S & D Errors _______________
  • 87. HCOB 7 Sep 71 C/S Series 58 Programming Cases Backwards __________

  • HCOB 28 Jan 66 S & D Data. How a Suppressive Becomes one _______________
  • 88. HCOB 8 Sep 71 Birth Control Pills __________

  • HCOB 5 Feb 66 S & D Warning _______________
  • 89. HCOB 14 Sep 71 C/S Series 59 Dianetic List Errors __________

  • HCOB 5 Feb 66 Letting the PC Itsa _______________
  • 90. HCOB 14 Sep 71 Post Purpose Clearing C/S Form 1R __________

  • HCOB 5 Feb 66 S & D Data (Doesnt seem to ??? ref HCOB indesces) _______________
  • 91. HCOB 15 Sep 71 C/S Series 60 The Worst Tangle __________

  • HCOB 9 Feb 66 Release Grades _______________
  • 92. HCOB 22 Sep 71 C/S Series 61 The Three Golden Rules of the C/S __________

  • HCOB 11 Feb 66 Free Needles, How to get them on a PC _______________
  • 93. HCOB 24 Sep 71 Interiorization Rundown __________

  • HCOB 12 Feb 66 The Dangerous Auditor _______________
  • 94. HCOB 25 Sep 71RA Tone Scale in Fall __________

  • HCOB 21 Feb 66 Definition Processes _______________
  • 95. HCOB 28 Sep 71 C/S Series 62 Know Before You Go __________

  • HCOB 3 Apr 66 Dianetic Auditing Course _______________
  • 96. DEMO: The ways to get data about a pc. __________

  • HCOB 10 Jun 66 S & D Commands _______________
  • 97. BTB 30 Sep 71R TRs in Auditor Training and Cramming __________

  • HCOB 10 Jun 66 S & D The Missed Item _______________
  • 98. HCOB 1 Oct 71 C/S Series 63 C/Sing for New Auditors or Veterans __________

  • Demonstrate in clay what happens to pc and bank when an item is missed on a Listing Process _______________
  • 99. HCOB 5 Oct 71 C/S Series 64 F/Ning Auditors __________

  • Tape 6607C 19 SHSpec–69 About Rhodesia _______________
  • 100. HCOB 6 Oct 71 C/S Series 65 Auditing of Staff and Public __________

  • HCOB 20 Jul 66 Type Two PTS _______________
  • 101. BTB 16 Oct 71 Forcing a PC __________

  • Tape 6607C 21 SHSpec–70 Dianetic Auditing _______________
  • 102. HCOB 21 Oct 71 Assists in Scientology __________

  • Tape 6607C 26 SHSpec–71 The Classification Chart and Auditing _______________
  • 103. HCOB 22 Oct 71 Exteriorization __________

  • Demonstrate in clay why Grade 0 – IV are in the sequence they are in _______________
  • 104. BTB 24 Oct 71R Op Pro by Dup End Phenomena __________

  • HCOB 27 Jul 66 Meter Trim Check _______________
  • 105. HCOB 24 Oct 71 False TA __________

  • Tape 6607C 28 SHSpec–72 Dianetic Auditing and the Mind _______________
  • 106. HCOB 25 Oct 71 Drug Drying Out __________

  • Tape 6608C 02 SHSpec–73 Suppressives and GAEs _______________
  • 107. BTB 25 Oct 71R The Special Drug Rundown – Note __________

  • Tape 6608C 04 SHSpec–74 Dianetics, Scientology and Society _______________
  • 108. HCOB 29 Oct 71R Int RD Correction List Revised __________

  • HCOB 10 Aug 66 Errors of Students _______________
  • 109. HCOB 30 Oct 71 Triple Grades vs Expanded __________

  • Tape 6608C 16 SHSpec–75 Releases and Clears _______________
  • 110. BTB 31 Oct 71 C/S Series 44R Addition The Sequence of Programs __________

  • HCOB 16 Aug 66 List L4 S&D _______________
  • 111. HCOB 3 Nov 71 C/S Series 66 Auditors Worksheets __________

  • Tape 6608C 18 SHSpec–76 Study and Intention _______________
  • 112. HCOB 12 Nov 71R False TA Addition __________

  • Demonstrate in clay intention _______________
  • 113. HCOB 20 Nov 71 HAS Specialist and Establishment Officer Auditing Program __________

  • HCOB 22 Aug 66 Floating Needles, Listing Processes _______________
  • 114. HCOB 25 Nov 71 Resistive Cases Former Therapy __________

  • Tape 6608C 23 SHSpec–77 Organization _______________
  • 115. CLAY DEMO: Why the “former therapy” case is considered a resistive case. __________

  • HCOB 23 Aug 66 Service Facsimile _______________
  • 116. BTB 26 Nov 71 Out of Valence 220H __________

  • HCOB 23 Aug 66 Clear Test _______________
  • 117. BTB 30 Nov 71R C/S Series 67 The Code of a C/S __________

  • Tape 6608C 25 SHSpec–78 The Antisocial Personality _______________
  • 118. BTB 1 Dec 71RA Triple Ruds Long Duration __________

  • Tape 6609C 01 SHSpec–79 Gradients and ARC _______________
  • 119. BTB 1 Dec 71 Rising Scale Processing __________

  • Tape 6609C 08 SHSpec–80 States of Identity _______________
  • 120.BTB 1 Dec 71R Effort Processing __________

  • HCOB 20 Sep 66 Minus Scale Releases _______________
  • 121. BTB 4 Dec 71R R-1C __________

  • HCOB 21 Sep 66 ARC Break Needle _______________
  • 122. BTB 4 Dec 71 R-1C Assessment by Dynamics __________

  • Demonstrate in clay an ARC/B needle, the bank and the PC _______________
  • 123. HCOB 5 Dec 71 End Phenomena __________

  • HCOB 27 Sep 66 The Anti-Social Personality The Anti-Scientologist _______________
  • 124. DRILL: How to check if a pc has made the EP of a process __________

  • Tape 6611C 01 SHSpec–81 Government and Organization _______________
  • 125. BTB 8 Dec 71 C/S Series 68 The C/S and Cramming Cycles __________

  • HCOB 18 Nov 66 Rehab on Self Analysis _______________
  • 126. HCOB 9 Dec 71R PTS Rundown __________

  • Tape 6611C 29 SHSpec–82 OT and Clear Defined _______________
  • 127. CLAY DEMO: The EP of the PTS Rundown __________

  • HCOB 30 Nov 66 Assessment for Service Facsimiles _______________
  • 128. BTB 12 Dec 71R C/S Series 69R Mandatory C/Sing Checklist __________

  • Tape 6612C 06 SHSpec–83 Scientology Definitions II _______________
  • 129. BTB 12 Dec 71R C/S Series 70 How to Write up A Cramming Order __________

  • Tape 6612C 13 SHSpec–84 Scientology Definitions III _______________
  • 130. HCOB 16 Dec 71RA C/S Series 35RA Interiorization Errors __________

    I attest that I have completed Part 4 of this checksheet, that I have used full study tech throughout, that I have no misunderstoods and know and can apply the materials:

    131. HCOB 17 Dec 71R C/S Series 23RA Interiorization Summary __________

    STUDENT: ___________________________ DATE: _______________

    132. HCOB 19 Dec 71 C/S Series 71 D of P Operates by OCAs __________

    I attest that student has completed the requirements of Part 1 of this checksheet and does know and can apply the materials:

    133. HCOB 20 Dec 71 C/S Series 72 Use of Correction Lists __________

    COURSE SUPERVISOR: ___________________ DATE: _______________

    134. CLAY DEMO: The importance of using correction lists __________

    Student has passed a metered check for misunderstoods on these materials and has passed a written examination on the key materials 100 %:

    135. HCOB 23 Dec 71 C/S Series 73 The No-Interference Area __________

    STUDENT EXAMINER:____________________ DATE: ________________

    136. BTB 30 Dec 71 Interiorization Rundown Commands __________

    CERTS AND AWARDS: Logs Completion of Class V Checksheet

    137. HCOB 1 Jan 72RA L1X Hi-Lo TA List Revised __________

    C&A: ________________________DATE: ____________________

    138. HCOB 3 Jan 72 C/S Series 69 Addition C/Sing Checklist __________

    END OF CLASS V CHECKSHEET

    139. BTB 4 Jan 72RA 0-IV Expanded Grade Processes – Triples Part A – ARC Straightwire __________

    (Student now commences the Class VI Checksheet)

    140. BTB 5 Jan 72R 0-IV Expanded Grade Processes – Triples Part B – Grade 0 Processes __________

    Training and Sercices
    for
    L. RON HUBBARD
    FOUNDER

    141. BTB 6 Jan 72R 0-IV Expanded Grade Processes – Triples Part C – Grade I Processes __________

    LRH: BL:nt

    142. BTB 8 Jan 72R 0-IV Expanded Grade Processes – Triples Part E – Grade III Processes _________

    143. BTB 9 Jan 72R 0-IV Expanded Grade Processes – Triples Part F – Grade IV Processes __________

    144. HCOB 20 Jan 72 PTS RD Addition __________

    145. HCOB 3 Feb 72 R6EW – OT III No Interference Area __________

    146. HCOB 4 Feb 72 Study Correction List Revised __________

    147. HCOB 15 Feb 72 False TA Addition 2 __________

    148. BTB 15 Feb 72 An Optional Int RD Step __________

    149. HCOB 16 Feb 72 C/S Series 74 Talking the TA Down Modified __________

    150. HCOB 18 Feb 72 False TA Addition 3 __________

    151. HCOB 19 Feb 72R Dating/Locating __________

    152. HCOB 24 Feb 72 C/S Series 71A Word Clearing OCAs __________

    153. TAPE: 7202C26 LRH/MTS 1 CCH Steps 1-4 Demo __________

    154. TAPE: 7202C26 LRH/MTS 2 Demo of an Assist __________

    155. TAPE: 7202C26 LRH/MTS 3 Patching Up Two 3DXX Cases__________

    156. HCOB 29 Feb 72R False TA Checklist __________

    157. BTB 22 Mar 72R Disagreement Remedy __________

    158. BTB 25 Mar 72R Urgent-Important LX3, Handling Of __________

    159. HCOB 27 Mar 72 Student Correction List Issue I Study Correction List 1 __________

    160. HCOB 27 Mar 72 Course Supervisor Correction List Issue II Study Correction List 2 __________

    161. HCOB 27 Mar 72RA Auditor Correction List Auditor Issue III Recovery Study Correction List 3RA __________

    162. HCOB 27 Mar 72 Case Supervisor Correction List Issue IV Study Correction List 4 __________

    163. HCOB 27 Mar 72R Executive Correction List Issue V Study Correction List 5 __________

    164. HCOB 30 Mar 72 The Primary Correction Rundown Revised __________

    165. HCOB 3 Apr 72 Primary Rundown Note __________

    166. HCOB 4 Apr 72 Primary Rundown (Revised) __________

    167. BTB 7 Apr 72R Touch Assists Correct Ones __________

    168. DEMO: The purpose of a touch assist. __________

    169. BTB 10 Apr 72R Prepchecks __________

    170. DEMO: When to end off a prepcheck. __________

    171. HCOB 16 Apr 72 PTS RD Correction List __________

    172. HCOB 17 Apr 72 C/S Series 76 C/Sing a PTS Rundown __________

    173. HCOB 19 Apr 72 C/S Series 77 “Quickie” Defined __________

    174. HCOB 20 Apr 72 C/S Series 78 Product Purpose and Why and WC Error Correction __________

    175. HCOB 24 Apr.72 C/S Series 79 PTS Interviews __________

    176. HCOB 26 Apr 72 Study Series 8 The Glib Student __________

    177. BTB 2 May 72R Clearing Commands __________

    178. HCOB 7 May 72 Expanded Gita __________

    179. HCOB 10 May 72 Robotism __________

    180. DEMO: What Robotism is and how to handle. ­­­­__________BPL 8.1.72RA Revised

    18.1.75 - 42 -

    181. HCOB 3 Jun 72R PTS Rundown, Final Step __________

    182. HCOB 10 Jun 72 Bypassed Charge __________

    183. CLAY DEMO: What by-passed charge is. __________

    184. BTB 10 Jun 72R The L3RD Rundown __________

    185. BTB 10 Jun 72 Refer to: HCO PL 3 May 72 “Ethics and Executives” __________

    186. HCOB 15 Jun 72 C/S Series 80 Dog PCs __________

    187. HCOB 16 Jun 72 C/S Series 81 Auditors Rights Modified __________

    188. DEMO: Why it’s out ethics to “pick and choose” your pcs. __________

    189. HCOB 20 Jul 72 Primary Correction Rundown Handling __________

    190. HCOB 20 Jul 72 Distractive and Additive Questions and Orders __________

    191. HCOB 10 Aug 72 C/S Series 82 Dianetic HCOB Interest __________

    192. BTB 11 Aug 72RA C/S Series 83 RA Correction Lists __________

    193. HCOB 13 Aug 72R Fast Flow Training __________

    194. HCOB 16 Aug 72 C/S Series 84 Flubless C/Sing __________

    195. BTB 16 Aug 72-1 C/S Series 84-1 Flubless C/Sing in Missions __________

    196. BTB 13 Sep 72 C/S Series 85 Catastrophes From and Repair of “No Interest” Items __________

    197. BTB 20 Sep 72 TR Training Under LRH __________

    198. BTB 2 Nov 72R Auditor Admin Series 1R The Auditor Admin Series For Use By All Auditors __________

    199. CLAY DEMO: The end product of applying the Auditor Admin Series __________

    200. BTB 3 Nov 72R Auditor Admin Series 3R The PC Folder and Its Contents __________

    201. BTB 4 Nov 72 Auditor Admin Series 4 The Folder __________

    202. HCOB 5 Nov 72 Auditor Admin Series 5 Case Progress Sheet __________

    203. BTB 5 Nov 72R Auditor Admin Series 6R The Yellow Sheet __________

    204. BTB 5 Nov 72R Auditor Admin Series 7R The Folder Summary __________

    205. BTB 5 Nov 72 Auditor Admin Series 8 OCA Graphs __________

    206. BTB 6 Nov 72R Auditor Admin Series 9R The Program Sheet __________

    207. BTB 6 Nov 72R Auditor Admin Series 10R The Auditor’s C/S __________

    208. BTB 6 Nov 72RA Auditor Admin Series 11RA The Exam Report __________

    209. BTB 6 Nov 72R Auditor Admin Series 12R The Summary Report Form __________

    210. BTB 6 Nov 72R Auditor Admin Series 13R The Auditor Report Form __________

    211. BTB 6 Nov 72R Auditor Admin Series 14R The Worksheets __________

    212. BTB 7 Nov 72R Auditor Admin Series 16R Correction Lists __________

    213. BTB 7 Nov 72R Auditor Admin Series 18R L & N Lists __________

    214. HCOB 7 Nov 72 Auditor Admin Series 20 Miscellaneous Reports __________

    215. BTB 8 Nov 72R Auditor Admin Series 22R Folder Error Summaries __________

    216. BTB 8 Nov 72RA Auditor Admin Series 23RA Invoice Form and Routing Form __________

    217. HCOB 15 Nov 72 Students Who Succeed __________

    218. BTB 3 Dec 72 Student Comm Lag on Checkouts __________

    219. BTB 28 Dec 72RA C/S Series 81-1RA Auditors Rights Addition Revised __________

    220. HCOB 4 Jan 73 Study Series 9 Confront __________

    221. BTB 20 Jan 73RB C/S Series 86RB The Red Tag Line __________

    222. BTB 24 Jan 73 Examiner and False TA __________

    223. BTB 13 Mar 73R Handling Int/Ext __________

    224. HCOB 5 Apr 73 Axiom 28 Amended __________

    225. BTB 7 Apr 73 Gradients in TRs __________

    226. BTB 1 Jul 73 Money Assist __________

    227. BTB 7 Jul 73R Handling Flubbed Products __________

    228. HCOB 11 Jul 73 Assist Summary __________

    229. HCOB 21 Jul 73 Recovering Students and PCs __________

    230. BTB 24 Jul 73 Pregnancy and Auditing __________

    231. HCOB 30 Jul 73 Scientology Current State of the Subject and Materials __________

    232. HCOB 2 Aug 73 Pep __________

    233. HCOB 10 Aug 73 PTS Handling __________

    234. DEMO: The Steps of Doing a 10 Aug PTS Handling __________

    235. BTB 29 Aug 73 Use the Technology on Help for the “Help” Button __________

    236. HCOB 15 Oct 73 C/S Series 87 Nulling and F/Ning Prepared Lists __________

    237. BTB 22 Oct 73R C/S Series 88R Tech Degrades __________

    238. HCOB 11 Nov 73 Preclear Declare Procedure __________

    239. HCOB 15 Nov 73R Fear of People List-R __________

    240. HCOB 20 Nov 73 Reissued From 21st Advanced Clinical Course Training Drills __________

    241. DRILL: Do the Anti - Q & A TR Drill with another student. __________

    242. HCOB 20 Nov 73 C/S Series 89 F/N What You Ask or Program __________

    243. HCOB 21 Nov 73 The Cure of Q & A Mans Deadliest Disease __________

    244. HCOB 23 Nov 73 Dry and Wet Hands Make False TA __________

    245. HCOB 24 Nov 73RA C/S Series 53RI __________

    246. HCOB 5 Dec 73 The Reason for Q & A __________

    247. CLAY DEMO: Why a person Qs & As __________

    248. HCOB 6 Dec 73 C/S Series 90 The Primary Failure __________

    249. HCOB 15 Dec 73 The Continuous Missed W/H and Con- tinuous Overt With Data on Degraded Beings and False PTS Conditions __________

    250. DEMO: A continuous missed withhold and how to handle. __________

    251. HCOB 6 Jan 74 Assist Summary Addition __________

    252. BTB 15 Jan 74 Full Assist Summary Checklist __________

    253. HCOB 27 Jan 74 Dianetics R3R Commands Have Background Data __________

    254. HCOB 17 Feb 74 C/S Series 91 Mutual Out Ruds __________

    255. CLAY DEMO: Mutual Out Ruds (give a specific example) and how to handle __________

    256. BTB 14 Mar 74R 0-IV Expanded Grade Processes - Triple Part D – Grade II Processes __________

    257. HCOB 17 Mar 74 TWC Checksheets TWC, Using Wrong Questions __________

    258. CLAY DEMO: The basic theory of what is a Listing Question and Why. __________

    259. HCOB 18 Mar 74 E-Meters Sensitivity Errors __________

    260. HCOB 21 Mar 74 End Phenomena __________

    261. CLAY DEMO: The definition of “End Phenomena”. __________

    262. BOOK: Mission into Time (1974) __________

    263. BTB 11 Apr 74 ARC Break Handling __________

    264. BTB 29 May 74R Full Assist Checklist for Injuries and Illnesses __________

    265. HCOB 31 May 74 Unhandled Drugs and Ethics __________

    266. HCOB 8 Jul 74R C/S Series 92R Word Clearing Errors __________

    267. HCOB 31 Aug 74 C/S Series 93 New Grade Chart __________

    268. HCOB 25 Sep 74 C/S Series 94 Reduction of Refunds C/Ses and Overload __________

    269. HCOB 26 Sep 74 Handling Flubbed PCs __________

    270. HCOB 6 Oct 74 The Vital Information Rundown The Technical Breakthrough of 1974 __________

    271. HCOB 1 Nov 74 Rock Slams and Rock Slammers __________

    272. ESSAY: How to identify a rock slammer. __________

    273. HCOB 5 Nov 74 Drugs, More About __________

    274. HCOB 15 Nov 74 Student Rehab List __________

    275. HCOB 1 Dec 74 Word Clearing Lists for Prepared Lists __________

    276. HCOB 8 Dec 74 TR0 – Notes on Blinking __________

    277. __________

    278. __________

    279. __________

    280. __________

    281. __________

    END OF PART 7

    The student is routed to Qual to attest to Part 7 of the Class V Checksheet.

    I attest that I have completed Part 7 of this Checksheet, That I have used full study tech throughout, that I have no Misunderstoods and know and can apply the materials.

    STUDENT:________________________________________ DATE:______________

    I attest that Student has completed the requirements of Part 7 of this Checksheet and does know and can apply the Materials.

    COURSE SUPERVISOR:______________________________ DATE:____________________

    The above named Student has attested to having: (a) properly enrolled on the course, (b) paid for the course, (c) studied and understands all the materials of the Checksheet, (d) done the drills called for on the Checksheet and (e) can produce the results required in the materials of this course, and is awarded the Certificate of HUBBARD CLASS V AUDITOR – HUBBARD VALIDATED AUDITOR HAV (PROV).

    CERTS & AWARDS:_________________________________DATE:______________

    Revised & Compiled by Flag Tech Compilations Unit
    for W/O Ron Shafran
    CS-4
    Approved by Commodore’s Staff Aides and the Board of Issues
    for the BOARDS OF DIRECTORS of the CHURCHES OF SCIENTOLOGY
    BDCS:BI:CSA:RS:LG:MK:nt