ORIGINAL COLOUR FLASH NOT GREEN ON WHITE | ORIGINAL COLOUR FLASH NOT GREEN ON WHITE |
LONDON HCO BULLETIN OF 26 SEPTEMBER 1956 To Washington and London | LONDON HCO BULLETIN OF 26 SEPTEMBER 1956 To Washington and London |
FLOW LINE FOR PERSONNEL | FLOW LINE FOR PERSONNEL |
The Procurement of Personnel for the Organization Technical Staff should be from the field or the School to the HGC, from the HGC to staff posts when important and need filling. | The Procurement of Personnel for the Organization Technical Staff should be from the field or the School to the HGC, from the HGC to staff posts when important and need filling. |
In other words, a blank for Day Instructor is filled from HGC staff – the replacement on HGC staff comes from the field or from the students at the School. | In other words, a blank for Day Instructor is filled from HGC staff – the replacement on HGC staff comes from the field or from the students at the School. |
Exception – Business staff is occasionally transferred to Technical Staff. | Exception – Business staff is occasionally transferred to Technical Staff. |
Reason – It is easier to brief on auditing than on what we do in the Organization. Auditing not Organization is real to field and student. | Reason – It is easier to brief on auditing than on what we do in the Organization. Auditing not Organization is real to field and student. |