The Tape of September 24, 1963, R4MTA, has been withdrawn.
The process R4MTA has been canceled. Cases having a hard time do not get Blowdowns high in the bank. Rather they get a “disintegrating RR” on the Item. Listing by Blowdown can get the pc into other GPMs and skips RIs.
R3M2 is reinstated in full and exactly as R4M2.
List an Item list to the 1st RR, test the Item you’re listing from. If the RI you’re listing from doesn’t read, give the pc the new Item. If not, list to next RR.