Русская версия

Search document title:
Content search 2 (exact):
ENGLISH DOCS FOR THIS DATE- Commands for Upper Indoctrination - TR6, TR7, TR9 - B651116-2 | Сравнить
- E-Meter Sensitivity Setting - B651116 | Сравнить
- E-Meter Sensitivity Setting - B651116R79 | Сравнить

RUSSIAN DOCS FOR THIS DATE- Установка Чувствительности Е-метра - Б651116 | Сравнить

SCANS FOR THIS DATE- 651116 - HCO Bulletin - E-Meter Sensitivity Setting [B005-045]
- 651116 - HCO Bulletin - E-Meter Sensitivity Setting [B031-034]
- 651116 - HCO Bulletin - E-Meter Sensitivity Setting [B040-090]
- 651116 - HCO Bulletin - E-Meter Sensitivity Setting [B067-018]
- 651116 Issue 2 - HCO Bulletin - Commands for Upper Indoctrination - TR 6, TR 7, TR 9 [B005-046]
- 651116 Issue 2 - HCO Bulletin - Commands for Upper Indoctrination - TR 6, TR 7, TR 9 [B031-035]
- 651116 Issue 2 - HCO Bulletin - Commands for Upper Indoctrination - TR 6, TR 7, TR 9 [B040-089]
- 651116 Issue 2 - HCO Bulletin - Commands for Upper Indoctrination - TR 6, TR 7, TR 9 [B067-019]
- 651116 Issue 2 - HCO Bulletin - Commands for Upper Indoctrination - TR 6, TR 7, TR 9 [B119-002]
- 651116R - HCO Bulletin - E-Meter Sensitivity Setting [B089-008]
CONTENTS E-METER SENSITIVITY SETTING Cохранить документ себе Скачать
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 16 NOVEMBER 1965R
Revised 22 February 1979
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 16 NOVEMBER 1965R
Revised 22 February 1979
RemimeoRemimeo
TechTech
QualQual
All AuditorsAll Auditors
E-Meter ChecksheetsE-Meter Checksheets

E-METER SENSITIVITY SETTING

E-METER SENSITIVITY SETTING

(Ref: HCOB 4 Dec 77 Checklist For Setting Up Sessions And An E-Meter

(Ref: HCOB 4 Dec 77 Checklist For Setting Up Sessions And An E-Meter

HCOB 24 Jan 77 Tech Correction Round-Up

HCOB 24 Jan 77 Tech Correction Round-Up

HCOB 7 Feb 79R E-Meter Drill 5RA – Can Squeeze)

HCOB 7 Feb 79R E-Meter Drill 5RA – Can Squeeze)



When preparing for a session, an auditor sets up his E-Meter as per E-Meter Drill 4.

When preparing for a session, an auditor sets up his E-Meter as per E-Meter Drill 4.

The sensitivity is set for 1/3 of a dial drop on a correct can squeeze per HCOB 7 Feb 79R E-Meter Drill 5RA Can Squeeze. This is done for each individual pc and at the beginning of each session before starting the session, and with the pc on the cans, per HCOB 4 Dec 77 Checklist For Setting Up Sessions And An E-Meter.

The sensitivity is set for 1/3 of a dial drop on a correct can squeeze per HCOB 7 Feb 79R E-Meter Drill 5RA Can Squeeze. This is done for each individual pc and at the beginning of each session before starting the session, and with the pc on the cans, per HCOB 4 Dec 77 Checklist For Setting Up Sessions And An E-Meter.

There is no set sensitivity setting for a pc at any grade level. It is determined by the pays can squeeze at each session.

There is no set sensitivity setting for a pc at any grade level. It is determined by the pays can squeeze at each session.

L. RON HUBBARD
Founder
L. RON HUBBARD
Founder
LRH:kim LRH:kim