Русская версия

Search document title:
Content search 2 (exact):
ENGLISH DOCS FOR THIS DATE- Cramming Actions (CRAM-02RB) - BTB750308-1 | Сравнить
- Cramming Expertise (CRAM-06RA) - BTB750308-5 | Сравнить
- Cramming Officer Statistic (CRAM-07RA) - BTB750308-6 | Сравнить
- High Crime Checkouts and Technical Oks (CRAM-04RB) - BTB750308-3 | Сравнить
- TRs in Cramming (CRAM-05RB) - BTB750308-4 | Сравнить
- Types of Cramming Admin Cramming (CRAM-03R) - BTB750308-2 | Сравнить

SCANS FOR THIS DATE- 750308 Issue 1 - Board Technical Bulletin - Cramming Actions [BTB06-018]
- 750308 Issue 2 - Board Technical Bulletin - Types of Cramming - Admin Cramming [BTB06-019]
- 750308 Issue 3 - Board Technical Bulletin - High Crime Checkouts and Technical OKs [BTB06-020]
- 750308 Issue 4 - Board Technical Bulletin - TRs in Cramming [BTB06-021]
- 750308 Issue 5 - Board Technical Bulletin - Cramming Expertise [BTB06-022]
- 750308 Issue 6 - Board Technical Bulletin - Cramming Officer Statistic [BTB06-023]
CONTENTS HIGH CRIME CHECKOUTS AND TECHNICAL OKs MIMEO DELAYS ETHICS INSPECTIONS TECHNICAL OKs Cохранить документ себе Скачать
BOARD TECHNICAL BULLETIN
8 MARCH 1975
Issue III
Revises, Combines & Cancels
BTB 12 Dec 71RA, Issue X, Cramming Series 4RA,
BTB 5 Sept 72RA, Cramming Series IIRA,
BTB 9 June 73RA, Cramming Series 17RA,
BTB 10 June 73, Issue V, Cramming Series 22.
BOARD TECHNICAL BULLETIN
8 MARCH 1975
Issue VI
Cancels
BTB 12 December 1971 R Issue XIII Cramming Series 7R
RemimeoRemimeo
Cramming Series 4RBCramming Offs

HIGH CRIME CHECKOUTS AND TECHNICAL OKs

Cramming Series 7RA
(Ref: HCO PLs 7th & 8th Mar 66, High Crime)

CRAMMING OFFICER STATISTIC

All new Bulletins by Class or technical PLs issued are checked out on all HGC Auditors and Internes by the Cramming Officer within 24 hours of receipt. The Cramming Officer has these main actions which he ensures are done by all HGC Auditors, C/Ses, and Internes:

The statistic of the Cramming Officer is:

A. That they read the new Bulletin fully.

Total Cramming Points for the week.

B. That all misunderstood words are fully cleared, using Method 3 & Method 4. Starrate checkout is then done by the Cramming Officer or Interne Supervisor.

The Cramming Points for the Week are obtained by:

C. Clay Demos are done of the key principles in the new Rundown.

1. 2 points for all Cramming actions completed on Tech, Qual or HCO staff including Word Clearing on the appropriate materials, any Why Finding needed, accompanied by an acceptable Success Story.

D. That all new procedures or Rundowns are additionally drilled, including E-Meter drills if required by the procedure, in Cramming.

2. 1 point for all Cramming actions completed on Dissem, Treasury, Distribution and Exec Division staff, including Word Clearing on the appropriate materials, and Why Finding needed, accompanied by an acceptable Success Story.

E. Writes up a list of “Okays to Audit” for the procedure or Rundown and sends to D of P for use in Pc assignment.

3. 2 points for each issue or tape or drill completed by Auditors, Internes and Tech or Qual personnel on Okay to Audit checksheets or Okay to do technical posts with key materials fully Word Cleared, starrated and drilled. Includes Okays to Audit for new Rundowns as issued so long as any key related HCO Bs and metering required are studied, drilled, the procedure drilled on a doll, and after a Tech Course in each case.

Any confused technical questions, strange ideas or considerations expressed are immediately handled with Word Clearing. All Case Supervisors and Tech and Qual personnel on technical posts must also check out on all new Bulletins and technical Policy Letters. They do A, B and C above.

4. 2 points for each completed Cramming cycle originated by the Cramming Officer which handles a more basic or broader area of situation to the original just handled or a needed Retread in Tech on Tech, Qual or HCO personnel (per Cramming Series 25).

The Cramming Officer must have a special High Crimes New Issues Log Book. He lists down one side of the page the names of all the personnel involved. Across the top of the page, he lists the appropriate HCO (or Board) Bulletin or Policy Letter, with a line going down the page.

5. 1 point for each completed Cramming cycle originated by the Cramming Officer which handles a more basic or broader area of situation to the original just handled or Hat or Series Retread in Tech on Dissem, Treasury, Distribution or Executive Division personnel.

6. 2 points for each new Bulletin or Technical Policy starrated by all concerned within 48 hours of receipt.

Name

Note that there is a penalty of five points for each undone Cramming Order caused by lack of materials, Word Clearers or Tech or Admin Cramming personnel if stale dated 48 hours. Note that this stat is not the same as the Qual GDS and contains additional points to cover the Cramming Officer Post duties.

HCOB 2 Aug 72Ens. Judy Ziff, CS-5
Approved by the Board of Issues
for the
BOARDS OF DIRECTORS
of the
CHURCHES OF SCIENTOLOGY
BTB 10 Aug 72BDCS:BofI:JZ:rn.hg.nt.jh
HCO PL 13 Aug 72
HCOB 20 Aug 72
HCOB 22 Aug 72
HCOB 23 Aug 72
HCOB 1 Sep 72
Mary Jones
Date
Date
Date
Date
Date
Date
Date
Bill Smith
Date
Date
Date
Date
Date
Date
Date
John Brown
Date
Date
Date
Date
Date
Date
Date
Etc.
Etc.

When a new HCO (or Board) Bulletin or technical Policy Letter arrives in the Org, a copy must go immediately to the Cramming Officer. He logs it in his book and ensures that sufficient copies are made immediately available for checkouts to be done within 24 hours of receipt.

High Crime checkouts are done by Auditors to their highest Class. For example, Class VIIIs would check out on all new issues. An HDC would check out on any new Dianetic issues. A Class IV would check out on all Class IV issues. Where an issue is not applicable to an Auditor or staff member, a slash is put on his section of the book when the issue is entered. A Supervisor would be logged to check out on any new Supervision or Study Tech Bulletins or PLs. The C/S checks out on all new issues.

High Crime Checkouts can be done by the Cramming Officer or Interne Super. The Cramming Officer will retain the High Crime Log Book and continue to be responsible for them being in PT. Any High Crime Checkouts done by the Interne Super must be logged in the book by the Interne Super daily.

MIMEO DELAYS

The Cramming Officer must make a special report to CS-7, CS-1 and CS-5 at Flag if there is a delay in the supply of Bulletins and Policy Letters into his/her Org. This is a serious matter and must be reported immediately.

Mimeo Checklists of all issues are sent from Flag to the Orgs periodically.

ETHICS INSPECTIONS

The Ethics Officer should inspect the High Crime Log Book weekly to ensure that checkouts are in PT.

If the checkouts are not in PT, he must call an Ethics Hearing on the Cramming Officer and chit the Qual Sec.

Violations of High Crime Policies are not to be treated lightly and are handled per HCO PL 8 Mar 66, “High Crime”.

Attestations are not accepted on any High Crime Checkouts.

TECHNICAL OKs

Any person who does a technical action must get an OK to do such an action from the Cramming Officer or Interne Super.

This includes Auditors, Supervisors, Pc Examiners, Personnel Programmers, all Qual auditing correction actions, Word Clearers, C/Ses, D of P technical actions, such as PTS Interviews, Two-Way Comm, MLOs who do Assists, etc.

There are a few terminals outside of Tech and Qual who do technical actions who should also get a Qual OK and these are the Ethics Officer for PTS Interviews and handling and the Success Officer on his meter handling of completions.

If a new auditing rundown comes out, the C/S is expected to get an OK to C/S that action from Qual.

The way to put this in on any existing staff who do not have such OKs is to make up a list of what needs to be done and then give a short time limit on the completion. Do not use this Policy to stop existing production. If the OKs have not been given, pull them in and get them done. In such a case, the Qual Sec, Cramming Officer and Interne Super would be expected to work together to get it done.

OKs may be withdrawn by the Qual Sec, Cramming Officer, or C/S if found to have been falsely issued by reason of repeated flubs.

Attestation is not accepted in Qual for OKs to Audit.

Revised by
Msm John Eastment, A/CS-5
Approved by
Guardian WW
FB Ad Council
FB Exec Council
LRH Comm FB
Commodore’s Staff Aides
Approved by the Board of Issues
for the
BOARDS OF DIRECTORS
of the
CHURCHES OF SCIENTOLOGY
BDCS:CH:JK:JE:nt.jh