37 Fitzroy Street, London W. 1 HCO BULLETIN OF 10 MARCH 1959 | 37 Fitzroy Street, London W.1 HCO BULLETIN OF 10 MARCH 1959 |
Supplemental Data Sheet TO HCO BULLETIN OF FEB 16, 1959 AND STAFF AUDITORS' CONFERENCE OF FEB 16, 1959 | SUPPLEMENTAL DATA SHEET TO HCO BULLETIN OF FEB 16, 1959 AND STAFF AUDITORS’ CONFERENCE OF FEB 16, 1959 |
The Feb 16 Bulletins, done rapidly to inform staff auditors, omitted the full gradient processes. | The Feb 16 Bulletins, done rapidly to inform staff auditors, omitted the full gradient processes. |
Some of the omitted (and very important) processes are Overt-Withhold Straight Wire, General Overt-Withhold Straight Wire, ARC Break Straight Wire, Third Rail, What Can You Confront and Mock Up Responsibility. | Some of the omitted (and very important) processes are Overt-Withhold Straight Wire, General Overt-Withhold Straight Wire, ARC Break Straight Wire, Third Rail, What Can You Confront and Mock Up Responsibility. |
The complete list in order of use on any case is: | The complete list in order of use on any case is: |
ROUTE THETA CLEAR | ROUTE THETA CLEAR |
1. Rudiments and TR 5N |
|
2. Present Time Problem | |
3. Dynamic Straight Wire | |
4. Overt-Withhold Straight Wire | |
5. General Overt-Withhold Straight Wire | |
6. ARC Break Straight Wire | |
7. Third Rail | |
8. What Can You Confront | |
9. Mock up a picture for which you could be totally responsible | |
10. Not-Is Straight Wire | |
11. Past and Future Experience | |
12. Engram Running | |
13. Route One (When theta clear is obtained) | |
This is a complete route to theta clear on all cases so far examined and audited (which contained some real "what walls"). | This is a complete route to theta clear on all cases so far examined and audited (which contained some real “what walls”). |
Steps 1 to 5 above inclusive, if flattened, constitute a Release. | Steps 1 to 5 above inclusive, if flattened, constitute a RELEASE. |
The HAS Co-Audit Processes are: | The HAS Co-Audit Processes are: |
3. Dynamic Straight Wire |
|
4. Overt-Withhold Straight Wire | |
5. General Overt-Withhold Straight Wire | |
with the Instructor starting and stopping all sessions and doing all assessments. The auditing itself is severely muzzled. | with the Instructor starting and stopping all sessions and doing all assessments. The auditing itself is severely muzzled. |
HCA/HPA Professional Processes include 1 to 8 above inclusive. |
|
HCS/BScn Processes include 1 to 11 inclusive. | |
HGS/DScn Processes include entire list. | |