Русская версия

Search document title:
Content search 2 (exact):
ENGLISH DOCS FOR THIS DATE- Scientology FN and TA Position (CSS-099R) - B761210R78 | Сравнить
- Scientology FN and TA Position (CSS-099RA) - B761210RA78 | Сравнить
- Scientology FN and TA Position (CSS-099RB) - B761210RB80 | Сравнить
- Scientology FN and TA Position - B761210RB80 | Сравнить

RUSSIAN DOCS FOR THIS DATE- Саентологическая ПС и Положение РТ (КС-99RA) (2) - Б761210RA78 | Сравнить
- Саентологическая ПС и Положение РТ (КС-99RA) (3) - Б761210RA78 | Сравнить
- Саентологическая ПС и Положение РТ (КС-99RA) - Б761210RA78 | Сравнить

SCANS FOR THIS DATE- 761210 - HCO Bulletin - FN and TA Position [B100-012]
- 761210 - HCO Bulletin - Scientology FN and TA Position [B074-005]
- 761210RB - HCO Bulletin - Scientology FN and TA Position [B055-041]
- 761210RB - HCO Bulletin - Scientology FN and TA Position [B058-019]
CONTENTS SCIENTOLOGY F/N AND TA POSITION REPAIR SAMPLE CLEANUP C/S DIANETIC F/Ns POWER F/Ns REFERENCE HCOBs FOR FALSE TA PC INDICATORS HCOBs Cохранить документ себе Скачать
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 10 DECEMBER 1976RB
RE-REVISED 25 MAY 1980
(This issue is re-revised to update reference HCOBs for False TA.)
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 10 DECEMBER 1976RB
Re-Revised 25 May 1980
This issue is re-revised to up-date reference HCOBs for False TA
RemimeoRemimeo
All AuditorsAll Auditors
All InternAll Interne
SupervisorsSupervisors
All C/SesAll C/Ses
URGENT — IMPORTANTUrgent – Important
C/S Series 99RBCS Series 99RB

SCIENTOLOGY F/N AND TA POSITION

SCIENTOLOGY F/N AND TA POSITION

Through verbal tech just located, it has been found that some auditors have been ordered to disregard all F/Ns that were above 3.0 or below 2.0 on the meter.

Through verbal tech just located, it has been found that some auditors have been ordered to disregard all F/Ns that were above 3.0 or below 2.0 on the meter.

Auditors have also called F/Ns which were ARC break needles, thus falsely indicating to the pc.

Auditors have also called F/Ns which were ARC break needles, thus falsely indicating to the pc.

These two actions — disregarding actual F/Ns because the TA was not between 2.0 and 3.0 and calling “F/Ns” that were actually ARC break needles — have upset many preclears.

These two actions – disregarding actual F/Ns because the TA was not between 2.0 and 3.0 and calling "F/Ns" that were actually ARC break needles – have upset many preclears.

The outnesses here are

The outnesses here are: A. not considering pc indicators as senior and B. not noting pc indicators when calling an F/N and C. ignoring and giving junior importance to the technology covered in false TAs. (See list of references at end of this HCOB or the Subject Index of the HCOB Volumes.)

(a) not considering pc indicators as senior and

Auditors have even been led to falsify worksheets (giving TA as in range when it actually was not when calling an F/N) because they might "get in trouble" for calling an F/N in the wrong range, such as 1.8 or 3.2.

(b) not noting pc indicators when calling an F/N and

The correct procedure for out of range F/Ns is:

(c) ignoring and giving junior importance to the technology covered in false TAs.

1. Look at the pc's indicators.

(See list of references at end of this HCOB or the Subject Index of the HCOB Volumes.)

2. Call the F/N regardless of its range.

Auditors have even been led to falsify worksheets (giving TA as in range when it actually was not when calling an F/N) because they might “get in trouble” for calling an F/N in the wrong range, such as 1.8 or 3.2.

3. Mark down the actual TA position.

The CORRECT procedure for out of range F/Ns is

4. Handle the false TA at the earliest opportunity when it will not intrude into the current cycle on which the pc is being audited. (You don't interrupt a Quad R3RA, for instance, to handle false TA; you complete it and then, when directed by the C/S, you handle the false TA.)

  1. Look at the pc’s indicators.

5. On any pc you suspect has had his F/Ns disregarded because of false TA, you C/S for and get run a repair and rehab of this error.

  • Call the F/N regardless of its range.
  • E-Meter cans can monitor or change TA position when the palms are too dry or too wet or when the cans are too big or too small or when the wrong hand cream is used. The E-Meter does not read on hand moisture alone as was long believed by people in electronics. But TA depends upon resistance to electrical current in the palms, leads, and meter as well as its main resistance which happens to be mental masses or lack of them.

  • Mark down the ACTUAL TA position.
  • To simply tell some interne "Always disregard an F/N not in correct range" is to set him up for loses and set the pc up for crashes. The correct information is that an F/N which isn't in range is accompanied by pc indicators that indicate whether it is an F/N or not. And indicates you better get the false TA handled fast as soon as it won't interrupt the current cycle. And you always note where it F/Ned so the C/S can C/S for false TA handling.

  • Handle the false TA at the earliest opportunity when it will not intrude into the current cycle on which the pc is being audited. (You don’t interrupt a Quad R3RA, for instance, to handle false TA; you complete it and then, when directed by the C/S, you handle the false TA.)
  • Where an ARC break needle (which looks like an F/N) is observed, whether it is in range or out of range (2.0 to 3.0 or below 2.0 or above 3.0) you look at the pc and establish the pc's indicators before falsely calling an F/N. A pc who is about to cry is not an F/Ning pc and if you indicate an F/N to that pc you will further the ARC break and suppress the emotional charge that is about to come off.

  • On any pc you suspect has had his F/Ns disregarded because of false TA, you C/S for and get run a repair and rehab of this error.
  • REPAIR

    E-Meter cans can monitor or change TA position when the palms are too dry or too wet or when the cans are too big or too small or when the wrong hand cream is used. The E-Meter does not read on hand moisture alone as was long believed by people in electronics. But TA depends upon resistance to electrical current in the palms, leads and meter, as well as its main resistance which happens to be mental masses or lack of them.

    Where the above matters have not been fully understood and errors have occurred on pcs, it must be assumed that:

    To simply tell some intern “Always disregard an F/N not in correct range” is to set him up for loses and set the pc up for crashes. The correct information is that an F/N which isn’t in range is accompanied by pc indicators that indicate whether it is an F/N or not. AND indicates you better get the false TA handled fast as soon as it won’t interrupt the current cycle. AND you always note where it F/Ned so the C/S can C/S for false TA handling.

    1. Auditors have falsified their worksheets as to TA position and thus built up withholds and made themselves blowy.

    Where an ARC break needle (which looks like an F/N) is observed, whether it is in range or out of range (2.0 to 3.0 or below 2.0 or above 3.0) you LOOK at the pc and establish the pc’s indicators before falsely calling an F/N. A pc who is about to cry is NOT an F/Ning pc and if you indicate an F/N to that pc you will further the ARC break and suppress the emotional charge that is about to come off.

    2. That every pc who has ever had high or low TA trouble has had F/Ns disregarded and ARC break F/Ns falsely indicated.

    REPAIR

    3. That a briefing and drilling of all internes and auditors must occur on this HCOB.

    Where the above matters have not been fully understood and errors have occurred on pcs, it must be assumed that

    4. That a brief program of clean-up of disregarded F/Ns and falsely called ARC break F/Ns be done on every pc.

    1. Auditors have falsified their worksheets as to TA position and thus built up withholds and made themselves blowy.

    5. That every such pc be considered as having false TA troubles and these must be C/Sed for and corrected.

  • That every pc who has ever had high or low TA trouble has had F/Ns disregarded and ARC break F/Ns falsely indicated.
  • 6. That all auditors and internes be drilled on all HCOBs relating to pc indicators.

  • That a briefing and drilling of all interns and auditors must occur on this HCOB.
  • SAMPLE CLEAN-UP C/S

  • That a brief program of cleanup of disregarded F/Ns and falsely called ARC break F/Ns be done on every pc.
  • Disregard TA position, use only F/Ns and pc indicators in doing this C/S.

  • That every such pc be considered as having false TA troubles and these must be C/Sed for and corrected.
  • 1. It has been found that some of your F/Ns (release points) may have been disregarded by past or present auditors.

  • That all auditors and interns be drilled on all HCOBs relating to pc indicators.
  • 2. Have you ever felt an F/N (release point or end of an action) had been bypassed on your case?...

    SAMPLE CLEANUP C/S

    3. Find and rehab the... overrun of the release point to F/N. Check for any other bypassed F/Ns and rehab them.

    Disregard TA position, use only F/Ns and pc indicators in doing this C/S.

    4. Have you ever felt an F/N should not have been indicated by the auditor when it was?...

    1. It has been found that some of your F/Ns (release points) may have been disregarded by past or present auditors.

    5. Find the... point and get in Suppress on it and complete the action. Check "Are there any other F/Ns which should not have been indicated by the auditor when they were?" and handle as above.

  • Have you ever felt an F/N (release point or end of an action) had been bypassed on your case?
  • 6. Find and run the ARC breaks bypassed, with ARC break handling.

  • Find and rehab the overrun of the release point to F/N. Check for any other bypassed F/Ns and rehab them.
  • 7. Find and handle the false TA in totality.

  • Have you ever felt an F/N should not have been indicated by the auditor when it was?
  • DIANETIC F/Ns

  • Find the point and get in Suppress on it and complete the action. Check “Are there any other F/Ns which should not have been indicated by the auditor when they were?” and handle as above.
  • An F/N seen by the auditor in running R3RA is not called until the full Dianetic EP is reached.

  • Find and run the ARC breaks bypassed, with ARC break handling.
  • An auditor running R3RA is NOT looking for F/Ns. He is looking for the postulate which is sitting at the bottom of the chain he is running.

  • Find and handle the false TA in totality.
  • The EP of a Dianetic chain is always always always the postulate coming off.

    DIANETIC F/Ns

    The postulate is what holds the chain in its place. Release the postulate and the chain blows. That's it.

    An F/N seen by the auditor in running R3RA is not called until the full Dianetic EP is reached.

    The auditor must recognize the postulate when the pc gives it, note the VGIs, call the F/N and end off auditing that chain.

    An auditor running R3RA is NOT looking for F/Ns. He is looking for the postulate which is sitting at the bottom of the chain he is running.

    An F/N seen as the incident is erasing is not called.

    The EP of a Dianetic chain is always always always the postulate coming off. The postulate is what holds the chain in its place. Release the postulate and the chain blows. That’s it.

    The pc does not have to state that the incident has erased. Once he has given up the postulate, the erasure has occurred. The auditor will see an F/N and VGIs. NOW the F/N is called. F/Ns are not indicated until the EP of postulate off, F/N and VGIs is reached.

    The auditor must recognize the postulate when the pc gives it, note the VGIs, call the F/N and end off auditing that chain.

    It's the postulate – not the F/N that we are going for in New Era Dianetics.

    An F/N seen as the incident is erasing is not called.

    POWER F/Ns

    The pc does not have to state that the incident has erased. Once he has given up the postulate, the erasure has occurred. The auditor will see an F/N and VGls. NOW the F/N is called. F/Ns are not indicated until the EP of postulate off, F/N and VGls is reached.

    F/Ns are disregarded in Power.

    It’s the postulate — not the F/N — that we are going for in New Era Dianetics.

    Each Power Process has its own end phenomena and is ended only when that is obtained.

    POWER F/Ns

    REFERENCE HCOBs FOR FALSE TA

    F/Ns are disregarded in Power.

    • HCOB 8 Jun 70 LOW TA HANDLING

    Each Power Process has its own end phenomena and is ended only when that is obtained.

  • HCOB 16 Aug 70 R C/S Series 15R, GETTING THE F/N TO THE EXAMINER
  • REFERENCE HCOBs FOR FALSE TA

  • HCOB 24 Oct 71RA FALSE TA
    • HCOB 8 Jun 70 LOW TA HANDLING
  • HCOB 12 Nov 71RB FALSE TA ADDITION
  • HCOB 16 Aug 70R C/S Series 15R, GETTING THE F/N TO THE EXAMINER
  • HCOB 15 Feb 72R FALSE TA ADDITION 2
  • HCOB 24 Oct 71RA FALSE TA
  • HCOB 18 Feb 72RA FALSE TA ADDITION 3
  • HCOB 12 Nov 71RB FALSE TA ADDITION
  • HCOB 16 Feb 72 C/S Series 74, TALKING THE TA DOWN MODIFIED
  • HCOB 15 Feb 72R FALSE TA ADDITION 2
  • HCOB 23 Nov 73RB DRY AND WET HANDS MAKE FALSE TA
  • HCOB 18 Feb 72RA FALSE TA ADDITION 3
  • HCOB 24 Nov 73RD C/S 53RL SHORT FORM
  • HCOB 16 Feb 72 C/S Series 74, TALKING THE TA DOWN MODIFIED
  • HCOB 24 Nov 73RE C/S 53RL LONG FORM
  • HCOB 23 Nov 73RB DRY AND WET HANDS MAKE FALSE TA
  • HCOB 19 Apr 75R OUT BASICS AND HOW TO GET THEM IN
  • HCOB 24 Nov 73RD C/S 53RL SHORT FORM
  • HCOB 23 Apr 75RA VANISHING CREAM AND FALSE TA
  • HCOB 24 Nov 73RE C/S 53RL LONG FORM
  • HCOB 24 Oct 76RA C/S SERIES 96RA, DELIVERY REPAIR LIST
  • HCOB 19 Apr 75R OUT BASICS AND HOW TO GET THEM IN
  • HCOB 10 Dec 76RB C/S SERIES 99RB, SCIENTOLOGY F/N AND TA POSITION
  • HCOB 23 Apr 75RA VANISHING CREAM AND FALSE TA
  • HCOB 21 Jan 77RB FALSE TA CHECKLIST
  • HCOB 24 Oct 76RA C/S Series 96RA, DELIVERY REPAIR LISTS
  • HCOB 24 Jan 77 TECH CORRECTION ROUND-UP
  • HCOB 10 Dec 76RB C/S Series 99RB, SCIENTOLOGY F/N AND TA POSITION
  • HCOB 26 Jan 77R FOOTPLATES USE FORBIDDEN
  • HCOB 21 Jan 77RB FALSE TA CHECKLIST
  • HCOB 30 Jan 77R FALSE TA DATA
  • HCOB 24 Jan 77 TECH CORRECTION ROUND-UP
  • HCOB 4 Dec 77 CHECKLIST FOR SETTING UP SESSIONS AND AN E-METER
  • HCOB 26 Jan 77R FOOTPLATES USE FORBIDDEN
  • HCOB 13 Jan 77RB HANDLING A FALSE TA
  • HCOB 30 Jan 77R FALSE TA DATA
  • OWNER'S MANUAL, HUBBARD PROFESSIONAL MARK VI, HOW TO SET UP YOUR MARK VI E-METER
  • HCOB 4 Dec 77 CHECKLIST FOR SETTING UP SESSIONS AND AN E-METER
  • PC INDICATORS HCOBs

  • HCOB 13 Jan 77RB HANDLING A FALSE TA
  • References:

  • OWNER’S MANUAL, HUBBARD PROFESSIONAL MARK VI, “HOW TO SET UP YOUR MARK VI E-METER”
    • HCOB 29 Jul 64 GOOD INDICATORS AT LOWER LEVELS

    PC INDICATORS HCOBs

  • HCOB 28 Dec 63 INDICATORS PART ONE, GOOD INDICATORS
  • References:

  • HCOB 23 May 71R RECOGNITION OF RIGHTNESS OF THE BEING Issue VIII Rev. 4.12.74
    • HCOB 29 Jul 64 GOOD INDICATORS AT LOWER LEVELS
  • HCOB 22 Sep 71 THE THREE GOLDEN RULES OF THE C/S HANDLING AUDITORS
  • HCOB 28 Dec 63 INDICATORS PART ONE, GOOD INDICATORS
  • HCOB 21 Oct 68R FLOATING NEEDLE
  • HCOB 23 May 71R VIII Rev. 4.12.74 RECOGNITION OF RIGHTNESS OF THE BEING
  • L. RON HUBBARD
    Founder
  • HCOB 22 Sep 71 THE THREE GOLDEN RULES OF THE C/S HANDLING AUDITORS
  • LRH:RTCU:djm`
  • HCOB 21 Oct 68R FLOATING NEEDLE
  • L. RON HUBBARD
    Founder
    Revision assisted by LRH Technical Compilations Unit
    LRH:RTCU:djm.dd