Русская версия

Search document title:
Content search 2 (exact):
ENGLISH DOCS FOR THIS DATE- Running CCHs - B610623 | Сравнить

RUSSIAN DOCS FOR THIS DATE- Проведение УОО - Б610623 | Сравнить

SCANS FOR THIS DATE- 610623 - HCO Bulletin - Running CCHs [B001-059]
- 610623 - HCO Bulletin - Running CCHs [B028-035]
- 610623 - HCO Bulletin - Running CCHs [B037-045]
CONTENTS RUNNING CCHs Cохранить документ себе Скачать
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 23 JUNE 1961
Central Orgs Tech Depts

RUNNING CCHs

(from a telex sent by LRH to Johannesburg)

CCHs being run terribly wrong.

Correct version follows: Run a CCH only so long as it produces change in the pc's general aspect.

If no change in aspect for twenty minutes go on to next CCH. If CCH producing change do not go on but flatten that CCH.

Then when for twenty minutes it produces no change go on to next CCH. Run CCHs One Two Three Four, One Two Three Four, One etc.

Use only right hand on One.

Any pc on Routine One is given Joburg Sec Check Form 3 hour for hour with CCHs or have a second auditor giving Joburg on Routine One to pc on same day.

CCHs not run in Model Session, not run on E-Meter.

It is code break clause thirteen to run a CCH that is producing no change or to not flatten in same or subsequent session a CCH that is producing change.

Some pcs get no reaction at first on any CCH; therefore run each one the twenty minute period CCH One Two Three Four, One etc, and with Joburg being given same time you will eventually win.

L. RON HUBBARD LRH:jl.cden

[HCO B 13 July 1961, Change Processing and CCHs, which had a “Franchise” distribution, was a combination of the above HCO B and HCO B 29 May 1961, Clarification of “Change Processing”, page 320, with the last paragraph deleted.]