Русская версия

Search document title:
Content search 2 (exact):
ENGLISH DOCS FOR THIS DATE- Product Purpose and Why and WC Error Correction (CSS-078) - B720420-2 | Сравнить
- Suppressed Pcs and PTS Tech - B720420 | Сравнить

RUSSIAN DOCS FOR THIS DATE- Исправление Ошибок При Определении Цели Продукта, Поиске Почему и Прояснении Слов (КС-78) - Б720420-2 | Сравнить
- Подавленные Преклиры и Технология ПИН (РАСШДН-4) - Б720420 | Сравнить
- Цель и Почему Продукта и Исправление Ошибок Прояснения Слов (КС-78) - Б720420-2 | Сравнить

SCANS FOR THIS DATE- 720420 - HCO Bulletin - Suppressed PCs and PTS Tech [B012-089]
- 720420 - HCO Bulletin - Suppressed PCs and PTS Tech [B049-026]
- 720420 Issue 2 - HCO Bulletin - Product Purpose and Why and WC Error Correction [B012-090]
- 720420 Issue 2 - HCO Bulletin - Product Purpose and Why and WC Error Correction [B049-027]
- 720420 Issue 2 - HCO Bulletin - Product Purpose and Why and WC Error Correction [B096-020]
CONTENTS SUPPRESSED PCs AND PTS TECH Cохранить документ себе Скачать
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 20 APRIL 1972
Remimeo Expanded Dianetics Series 4 (Adds C/S Series 76 to HGDS checksheet)

SUPPRESSED PCs AND PTS TECH

(PTS means Potential Trouble Source which itself means a person connected to a Suppressive Person.)

As the Dianetic Specialist (HGDS) is often called upon to handle pcs who are not well, it is vital that he knows all about and can use “PTS Tech”.

All sick persons are PTS.

All pcs who rollercoaster (regularly lose gains) are PTS.

Suppressive persons are themselves PTS to themselves.

If a Dianetic Specialist does not know this, have reality upon it and use it, he will have loses on pcs he need not have.

There is considerable Administrative Tech connected with this subject of PTS and there is a special Rundown which handles PTS people.

They get handled if the auditor knows his PTS tech, if he audits well and if he uses both the auditing and Administrative Tech to handle.

The Administrative Tech requires an interview, usually by the Director of Processing or Ethics Officer and the person is required to handle the PTS situation itself before being audited. A check for stability is also made after being audited on the PTS Rundown.

For this reason, HCO B 17 April 72 and all the checksheet of HCO P/L 31 May 71 must be fully known to the Dianetic Specialist.

HCO B 17 April 72 is also C/S Series 76 so as to be sure that Case Supervisors handle the Admin and C/Sing correctly.

L. RON HUBBARD
Founder
LRH:mes.rd