Русская версия

Search document title:
Content search 2 (exact):
ENGLISH DOCS FOR THIS DATE- 3Dxx Flows Assessment (HCOIL) - P620203 | Сравнить

SCANS FOR THIS DATE- 620203 - HCO Policy Letter - Auditors Processing Check - HCO WW Sec Form 6A [B072-019]
- 620203 - HCO Policy Letter - Auditors Processing Check - HCO WW Sec Form 6A [PL005-014]
- 620203R - Board Policy Letter - Auditors Processing Check - HCO WW Sec Form 6A [BPL06-024]
CONTENTS 3DXX FLOWS ASSESSMENT Cохранить документ себе Скачать
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO INFORMATION LETTER OF 3 FEBRUARY 1962
All Sthil Students

3DXX FLOWS ASSESSMENT

Assess the following by elimination (as in nulling).

List “Who or what would (line found)”. Complete list. (Continue listing until pc knows he’s said it.) Find item by usual steps.

Do whole operation twice for two items. Both go on same line.

All items on a flow line are done by assessing flows not by oppterming as in other lines. You can continue to repeat the same operation for item after item:

PERMISSIBLE OUTFLOW ENFORCED OUTFLOW PROHIBITED OUTFLOW INHIBITED OUTFLOW PERMISSIBLE INFLOW ENFORCED INFLOW PROHIBITED INFLOW INHIBITED INFLOW

PERMISSIBLE OUTFLOW FROM SELF ENFORCED OUTFLOW FROM SELF PROHIBITED OUTFLOW FROM SELF INHIBITED OUTFLOW FROM SELF PERMISSIBLE INFLOW ON SELF ENFORCED INFLOW ON SELF PROHIBITED INFLOW ON SELF INHIBITED INFLOW ON SELF

PERMISSIBLE OUTFLOW FROM ANOTHER ENFORCED OUTFLOW FROM ANOTHER PROHIBITED OUTFLOW FROM ANOTHER INHIBITED OUTFLOW FROM ANOTHER PERMISSIBLE INFLOW ON ANOTHER ENFORCED INFLOW ON ANOTHER PROHIBITED INFLOW ON ANOTHER INHIBITED INFLOW ON ANOTHER

PERMISSIBLE OUTFLOW FROM OTHERS ENFORCED OUTFLOW FROM OTHERS PROHIBITED OUTFLOW FROM OTHERS INHIBITED OUTFLOW FROM OTHERS PERMISSIBLE INFLOW TO OTHERS ENFORCED INFLOW TO OTHERS PROHIBITED INFLOW TO OTHERS INHIBITED INFLOW TO OTHERS

There are thirty-two flows on a flows assessment for sec checks, or 3DXX.

L. RON HUBBARD LRH:sf.rd